T.10 Sand filling under floor 1 10.00 10.00 0.33 33.00 Cft
Total 33.00 Cft
T.11 P/L B.B masonry in F&P in 1:6 4 10.00 1.25 1.50 75.00 Cft
Total 75.00 Cft
T.12 P/L 2" thick Pcc 1:2:4 floor toping 1 16.50 16.50 272.25 Sft
Total 272.25 Sft
T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"
and 18 gauge m.s sheet and painting 1 1 No
Total 1 No
T.14 P/F 4" Dia C.I bell mouth 2 2 Nos
Total 2 Nos
T.15 P/F 4" Dia G.I pipe 9 gauge
Rising,Delivery,Washing,Overflow 4 40.00 160.00 Rft
Total 160.00 Rft
T.16 P/F 4' Dia G.I long bend 4 4.00 Nos
Total 4.00 Nos
T.17 P/F 4" Dia duck foot bend 4 4.00 Nos
Total 4.00 Nos
T.18 P/F: Railing 4 16.00 64.00 Rft
Total 64.00 Rft
http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more
Page 3
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
Total 100.00 Sft 61.47 6147.00
10.40a-01
T.7 P/L terrazo dado or skirting in 1:2 Inner walls 4 10.00 8.00 80.00 Sft
Total 80.00 Sft 52.56 4204.80
Page 4
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
N.S
T.8 P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c
and 5/8" Dia bars @12" c/c i/c fixing and painting 1 36.00 36.00 Rft
Total 36.00 Rft 280 10080.00
3.16-b+3.04-a+3.18-c+3.19-b+3.26-b-02
T.9 Earth filling under floor 1 10.00 10.00 0.67 67.00 Cft
Total 67.00 Cft 6.45 432.15
07.30
T.10 Sand filling under floor 1 10.00 10.00 0.33 33.00 Cft
Total 33.00 Cft 12.21 402.93
07.04a-05
T.11 P/L B.B masonry in F&P in 1:6 4 10.00 1.25 1.50 75.00 Cft
Total 75.00 Cft 100.81 7560.75
10.15-e+10.43-c
T.12 P/L 2" thick Pcc 1:2:4 floor toping 1 16.50 16.50 272.25 Sft
Total 272.25 Sft 35.35 9624.04
Non Schedule
T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"
and 18 gauge m.s sheet and painting 1 1 No
Total 1 No 3500 3500.00
9.19a+9.20/15+9.21/15
T.14 P/F 4" Dia C.I bell mouth 2 2 Nos
Total 2 Nos 363.71 727.42
24-16-c-09
T.15 P/F 4" Dia G.I pipe 9 gauge
Rising,Delivery,Washing,Overflow 4 40.00 160.00 Rft
Total 160.00 Rft 202.21 32353.60
24-30-d-07
T.16 P/F 4' Dia G.I long bend 4 4.00 Nos
Total 4.00 Nos 428.09 1712.36
Non Schedule
T.17 P/F 4" Dia duck foot bend 4 4.00 Nos
Total 4.00 Nos 640 2560.00
25-37+13-06b01+2x13.06d02
T.18 P/F: Railing 4 16.00 64.00 Rft
Total 64.00 Rft 322.26 20624.64
Page 5
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
624803.92
Page 6
Page 7
Task No 08
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I
KHAN
ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR
D.I KHAN
ABSTRACT OF COST
G.Total 1,795,412
http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more
ks and much more
Task No 08
T.4 6-06-b-02 P/L Rcc 1:1½:3 i/c shuttering and finishing Cft 432.85 165.36
Steel reinforcement bars Rcc 1:2:4
T.5 6.07b MT 4.44 86060.41
item T.3
10.22a+(10.4
3a = 10x10 P/L moasic floor in 1:2 Inner
T.6 Sft 100 61.47
room = 1/61 floor
P.Sft)
P/L terrazo dado or skirting in 1:2 Inner
T.7 10.40a-01 Sft 80 52.56
walls
P/F steel ladder made of 2"x2"x1/4" angle
T.8 N.S iron @15"c/c and 5/8" Dia bars @12" c/c Rft 36 280
i/c fixing and painting
3.16-b+3.04-
a+3.18-
T.9 Earth filling under floor Cft 67 6.45
c+3.19-
b+3.26-b-02
T.10 07.30 Sand filling under floor Cft 33 12.21
T.1210.15-e+10.43-c P/L 2" thick Pcc 1:2:4 floor toping Sft 272.25 35.35
P/F 2'x2' man hole cover made of 1-
T.13 Non Schedule 1/2"x1-1/2"x1/8" and 18 gauge m.s sheet N 1 3500
and painting
9.19a+9.20/1
T.14 P/F 4" Dia C.I bell mouth N 2 363.71
5+9.21/15
P/F 4" Dia G.I pipe 9 gauge
T.15 24-16-c-09 Rft 160 202.21
Rising,Delivery,Washing,Overflow
T.17 Non Schedule P/F 4" Dia duck foot bend N 4 640
25-37+13-
T.18 06b01+2x13. P/F: Railing Rft 64 322.26
06d02
Total:
000 GALLONS
http://mosttutorials.blogspot.com/
Free Civil Engineering Softwares,tutorials.setups,ebooks and much
AMOUNT more
904
11504.07
58782.864
71576.076
382108.2204
6147
4204.8
10080
432.15
402.93
7560.75
9624.0375
3500
727.42
32353.6
1712.36
2560
20624.64
624804.9
Task No 08
TASK-8
Doors & Windows of Doctor House
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05a-
stop cocks (Fisal or equivalent), C.P inlet pipe and
1- 03+(14.25x2)+1 No 2 2272.18 4544.36
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
Transformer 25 KV
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
1- Non Schedule Resistivity of survey for selection of site. Job 1 30000 30000
2- 24.01 Mobilization of boring plant and equipment to site Job 1 20000 20000
4- 24.02b07 From 101' to 200' below G.L 18" I/d. Rft 100 1424.37 142437
5- 24.02c07 From 201' to 300' below G.L 18" I/d. Rft 100 1424.37 142437
6- 24.02-d25 From 301' to 340' below G.L 18" I/d. Rft 40 1707.59 68303.6
7- Non Schedule Subsequent shifting to next site (if required) Job 1 20000 20000
Development and testing of tube well with "D" and "T" unit.
15- Non Schedule Complete in all respect as per specification and instruction Job 1 20000 20000
of Engineer incharge.
Supply/Installation of "KSB" submersible pumping set with
seimens A.C electric motor upto 40 H.P, 6" dia 12 stages
KSB pump, 6" dia KSB column pipes of required length, 4
core submersible electric cable for 40 HP motor to electric
starter, 14 gauge main switch board, star/delta "Seimens"
16- Non Schedule starter, Japan made, bolt meter, Ampere meter and selector Set 1 750000 750000
switches, phase indicator lamps, earthing of main switch
board and starter, 6" dia sluice valve and non return valve
of "AERO Brand" 6" dia M.S long bend and 18 gauge M.S
sheet cover for bore hole. Complete in all respect as per
specification and instruction of Engineer incharge.
P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC
17- 24.22c pipe I/c jointing material. Complete in all respect as per Nos 2 5568 11136
specification and instruction of Engineer incharge.
P/F: of 6" dia G.I Long bend heavy quality with jointing
21- Non Schedule material. Complete in all respect as per specification and Nos 2 3500 7000
instruction of Engineer incharge.
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
Water Supply
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
Civil Work
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
Earth filing: under floors with earth brought from out side
3.16-b+3.04-
approved source i/c all leads & lifts, filling in layers not more
C-9 a+3.18-c+3.19- Cft 1218 6.45 7856.1
than 6" thick, consolidating upto specified density and to the
b+3.26-b-02
satisfaction of Engineer incharge.
P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps
9.19a+9.20/15+ and 3 coats of synthetic enamel paint. complete in all
C-18 Rft 75 363.71 27278.25
9.21/15 respect as per specification and instruction of Engineer
incharge.
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)
P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05a-
stop cocks (Fisal or equivalent), C.P inlet pipe and
W-2 03+(14.25x2)+1 No 1 2272.18 2272.18
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.
P/F: Brass bib cock ½" dia screw down type Faisal or
W-4 14.39-a equivalent make. Complete as per instruction of Engineer No 2 185.31 370.62
Incharge.
P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
W-5 14.34b-01 Rft 30 377.4 11322
making holes and repair to original shape. Complete in all
respect. 4" dia CI pipe.
P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
14.34b-02 Rft 18 257.42 4633.56
making holes and repair to original shape. Complete in all
respect. 2" dia CI pipe.
S/L: jointing and testing of ½" dia GI pipe (IIL-L) i/c tees,
W-6 24.16c-01 bends, union, elbows, socket etc. Making hole and repair Rft 80 42.74 3419.2
complete.
P/F: 3" floor trap of CI i/c CP grating, caulking the joints with
W-7 14.31a No 2 597.03 1194.06
cement and hole repair complete.
Providing and Fixing of best quality 24" long towel rail.
(Fiasal or equivalent of approved quality). Complete in all
W-8 14.16a No 1 415.88 415.88
respect as per specification and instruction of Engineer
incharge.
Construction of 6' internal dia 30' deep soakage pit i/c 9"
thick BB in 1:4 from top to 6' depth, filling of pit with stone
W-13 Non-Schedule boulder, making chemny and RCC 1:2:4 cover 4" thick with No 1 45000 45000
1/2" dia bars 4" C/C both way. Complete in all respect as
per specification and instruction of Engineer incharge.
P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar,
excavation of trench & re-filling after laying of pipe.
W-14 23.01b Rft 40 101.26 4050.4
Complete as per specification and instruction of Engineer
Incharge.
Construction of 2'x2' or 2' dia BB manhole, upto required
depth i/c 4" PCC 1:4:8 in bed, BB wall laid & plastered in
W-15 Non-Schedule No 4 3500 14000
1:4 making channel inside and RCC 1:2:4 cover, 4" thick
with 3/8" dia bars 4" C/C both side.
W-16 14-69-b-03 S/F: of polythene water tank 500 gallons No 1 22586 22586
Sub Total : 144175.73
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA
FR D.I KHAN
TASK-8
Doors & Windows of Doctor House
16 Nos.
3- P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
10 3.50 7.00 = 245.00 Sft
1 3.00 7.00 = 21.00 Sft
4 2.50 7.00 = 70.00 Sft
Total = 370.00 Sft
4- P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
1- P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.
2 Nos.
Quarter Class-IV & Chowkidar House
21 Nos.
3- S/F: of Steel doors 18 SWG MS sheet with angle iron frame 1½"x1½"x1/8", bolt,
hinges & paint etc.
4- P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
6 3.50 8.50 = 178.50 Sft
3 3.50 7.00 = 73.50 Sft
3 3.00 8.50 = 76.50 Sft
6 2.50 7.00 = 105.00 Sft
Total = 433.50 Sft
5- P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
BHU Distempering
1- P/A: 2 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.
987.65 Sft
3046.69 Sft
4034.34 Sft
Transformer 25 KV
1- S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of 6' complete in all respect
as per WAPDA specification I/c HT shackles disc, insulators wooden bars etc. earthing
of each pole as per instruction of Engineer incharge.
2 Nos.
2- S/F of HT line of aluminum conductor 7/.132 aluminum as per WAPDA specification I/c
3% saage, cutting, jointing. Complete in all respect as per specification and instruction
of Engineer incharge.
800 Rft
3- P/F of 4 core cable as per design 19/.083 for connection of electric board for motor to
transformer. Complete in all respect as per specification and instruction of Engineer
incharge.
60.00 Rft
4- P/F: of transformer 25 KVA "Climax" I/c H.poles with transformer for meter etc. as per
WAPDA specification.
1 Nos.
1 Job
1 Job
3- Tube Well boring in all kind of soil except shangle/rock 18" I/d from ground upto 100'
below G.L
100.00 Rft
100.00 Rft
100.00 Rft
40.00 Rft
7- Subsequent shifting to next site (if required)
1 Job
8- Providing and installation PVC blind pipe in tube well with stranger BSS class "D"
working pressure and jointing. 12" I/d
340.00 Rft
4 Sets
10- S/Installation of 12" dia 2' long M.S bail plug in tube well bore hole. Complete in all
respect as per specification and instruction of Engineer incharge.
1 No.
11- S/Installation on MS suspension clamp of heavy duty 3/8" thick 12" I/d with PCC 1:2:4
block round it Complete.
1 Job
1 Job
13- Shrouding with graded gravel pack 3/8" to 1/8" around tube well in bore hole.
Complete in all respect as per specification and instruction of Engineer incharge.
340.00 Rft
14- Development and testing of tube well with air compressor over 1.5 cusecs discharge.
Complete in all respect as per specification and instruction of Engineer incharge.
72.00 Hrs
15- Development and testing of tube well with "D" and "T" unit. Complete in all respect as
per specification and instruction of Engineer incharge.
1 Job
16- Supply/Installation of "KSB" submersible pumping set with seimens A.C electric motor
upto 40 H.P, 6" dia 12 stages KSB pump, 6" dia KSB column pipes of required length,
4 core submersible electric cable for 40 HP motor to electric starter, 14 gauge main
switch board, star/delta "Seimens" starter, Japan made, bolt meter, Ampere meter and
selector switches, phase indicator lamps, earthing of main switch board and starter, 6"
dia sluice valve and non return valve of "AERO Brand" 6" dia M.S long bend and 18
gauge M.S sheet cover for bore hole. Complete in all respect as per specification and
instruction of Engineer incharge.
1 Set
17- P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC pipe I/c jointing material.
Complete in all respect as per specification and instruction of Engineer incharge.
2 Nos.
18- P/F: of 6" dia G.I pipe or CI Tee with jointing material. Complete in all respect as per
specification and instruction of Engineer incharge.
2 Nos.
19- P/F: of 6" dia GI pipe heavy quality I/c excavation of trench and refilling. Complete in
all respect as per specification and instruction of Engineer incharge.
250.00 Rft
20- P/F: of 6" dia G.I socket heavy quality. Complete in all respect as per specification and
instruction of Engineer incharge.
9 Nos.
21- P/F: of 6" dia G.I Long bend heavy quality with jointing material. Complete in all
respect as per specification and instruction of Engineer incharge.
2 Nos.
1 No.
Water Supply
P/Fixing 1½" dia G.I pipe (IIL-L) or equivalent in trench I/c excavation and its refilling, all necessary
fitting for pipe. Complete in all respect as per specification and instruction of Engineer incharge.
200.00 Rft
ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I
KHAN
Civil Work
C-1 Excavation as in foundation of building upto required depth in all kind of soil i/c subsequent re-filling
in trenches and plinth area or where required, disposal of surplus earth as directed, watering,
ramming and consolidating the earth as as specified complete in all respect as per specification and
instruction of E/Incharge.
C-3 P/L: P.C.C 1:4:8 in any part of building such as foundation, sub flooring etc. using 1½" down graded
stone aggregate i/c framework, placing, compacting, leveling and curing etc. Complete as per
specification and instruction of Engineer incharge.
C-4 P/L: 1st class BB masonry in foundation and plinth in 1:6 cement sand mortar i/c racking out the
joints where necessary scaffolding & curing etc. Complete in all respect as per specification and
instruction if Engineer incharge.
C-5 P/L: 2" thick DPC with cement concrete, 1:2:4 using approved quality fine/course aggregate i/c
farmwork, compacting, leveling, finishing and curing etc. 2 coats of hot bitumen (PB/3 or PB/4) and
2 layers of approved polythene sheet. Complete in all respect as per specification and instruction of
Engineer incharge.
C-7 P/F: in position mild steel, reinforcement bars of minimum 40000 PSI yield strength, of any size and
diameter i/c straightening, bending, placing, binding in position and binding wire, spacer, wastage
etc. Steel required for RCC works be designed & submitted well before by the contractor from
approved designer or reputed structure designer. Complete in all respect as per specification and
instruction of Engineer incharge.
C-8 P/L: 1st class BB masonry in superstructure in any thickness of wall. Set in 1:6 cement sand mortar
i/c racking out the joints where necessary, Scaffolding, making grooves and corners where required
& curing etc. Complete as per specification and instruction of Engineer Incharge.
C-9 Earth filing: under floors with earth brought from out side approved source i/c all leads & lifts, filling
in layers not more than 6" thick, consolidating upto specified density and to the satisfaction of
Engineer incharge.
C-10 P/F: clean course sand under floors from an approved source i/c leveling, watering, compacting etc.
Complete in all respect as per specification and instruction of Engineer incharge
C-11 P/L: mosaic floors consisting of 1½" thick PCC 1:2:4 divided into panels not morethan 3'x3' with 3/8"
thick marble strip and 1/2" thick mosaic topping (1 part of grey cement & 3 parts of approved colour
and size marble chips i/c curing, grinding, rubbing and polishing etc. Complete as per specification
and instruction of Engineer incharge.
C-12 P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick cement plaster in 1:3 ratio, (1 part of gray
cement and three parts of approved colour and size marble chips i/c grinding, rubbing, curing and
wax polishing etc. Complete as per specification and instruction of Engineer incharge.
C-14 P/A: deep struck pointing in cement/surkhi mortar in 1:1 with approved colour i/c racking out the
joints not less than 1/2" deep, saturating the surface, scaffolding & curing etc. Complete in all
respect as per specification and instruction of Engineer incharge.
C-15 P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
3 3.50 8.50 = 89.25 Sft
2 2.50 7.00 = 35.00 Sft
Total = 158.25 Sft
C-16 P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
C-17 P/A: 3 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.
C-18
P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps and 3 coats of synthetic enamel paint.
complete in all respect as per specification and instruction of Engineer incharge.
C-19 S/F: of 1½" thick D/Wood joinery as in wire gauze door without chowkat i/c all iron mongery and
hardware such as hinges, handle, holdfast, door spring and tower bolts etc. as approved, 12x24
wire mesh and 3 coats of S/E paint. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
1 3.50 8.50 = 29.75 Sft
Total = 63.75 Sft
C-20 P/L: PCC 1:3:6 as in plinth protection, around the building over compacted earth or where required
i/c framework, placing, curing, leveling, compacting and finishing etc. Complete in all respect as per
specification and instruction of Engineer Incharge.
E-1 Wiring of light or fan point from point to switch with 2x3/.029 Pakistan cable i/c sub circuit wiring
with 7/.029 Pakistan cable, with all accessories such as PVC concealed conduit PPI switches
(premier) fixed on plastic sheets & wooden box, ceiling rose and holder etc. Complete as per
instruction of Engineer Incharge.
20 Nos
E-2 Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3 pin 15 Amp. power plug i/c P/F: of 15
Amp. switch socket unit PPI (China clay base) fixed on wooden box on separate circuit. Complete
as per instruction of Engineer Incharge.
5 Nos
E-3 P/F: 4' long tube light (Asia/M. Inayatullah made) with starter, tube rod (Phillips) and choke.
Complete as per specification and instruction of Engineer Incharge.
12 Nos
E-4 P/F: of 56" sweep capacitor type ceiling fan with dimmer, (Pak Fan Delux) i/c suspension rod and
canopy etc. Complete as per instruction of Engineer Incharge.
6 Nos
E-5 Same as item # E-1, but wiring of 5 pin 5 Amp. light plug away from switch board i/c P/F: of PPI
(premier) light plug i/c wiring with 7/.029 etc. Complete as per instruction of Engineer Incharge.
6 Nos
E-7 P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of approved quality i/c connection from
nearest source to main board.
E-8 P/Fixing: 12" Sweep (Pak) Exhaust fan with louver. Complete in all respect as per specification and
instruction of Engineer incharge.
2 Nos.
E-9 Earthing of main switch with 8 SWG copper wire, laid in 1/2" dia GI pipe from main switch to 2'x2'
copper plate burried in 14 feet deep pit alongwith salt & charcoal mixture. Complete in all respect as
per specification and instruction of Engineer incharge.
1 No.
WATER SUPPLY & SANITARY INSTALLATION
W-1 P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master" Tanki,
P/Trap, Stop Cock, Plastic Connection & Hockey Pipe etc. Complete as
per specification and instruction of Engineer Incharge.
1 No.
W-2 P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.
1 No.
W-3 P/F: CP adjustable shower rose i/c stop cock and CP inlet pipe etc.
Complete as per instruction of Engineer Incharge.
1 No.
W-4 P/F: Brass bib cock ½" dia screw down type Faisal or equivalent make.
Complete as per instruction of Engineer Incharge.
2 Nos.
W-5 P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend,
caulking the joints with cement, painting to pipe, making holes and
repair to original shape. Complete in all respect.
W-6 S/L: jointing and testing of ½" dia GI pipe (IIL-L) i/c tees, bends, union,
elbows, socket etc. Making hole and repair complete.
80.00 Rft
W-7 P/F: 3" floor trap of CI i/c CP grating, caulking the joints with cement
and hole repair complete.
2 Nos.
W-8 Providing and Fixing of best quality 24" long towel rail. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.
W-9 Providing and Fixing of best quality Plastic soap dish. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.
W-10 Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.
W-11 P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made. Complete as per
specification and instruction of E/Incharge.
2 Nos.
W-12 Construction of septic tank of BB size, 8'x4'x6' with 9" thick BB wall, 4½" thick BB
partition, 1/2" thick cement plaster in 1:4 and 6" thick PCC 1:3:6 in foundation and
bed, 4" thick RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both way. Complete
as per instruction of Engineer Incharge.
1 No.
W-13 Construction of 6' internal dia 30' deep soakage pit i/c 9" thick BB in 1:4 from top to 6'
depth, filling of pit with stone boulder, making chemny and RCC 1:2:4 cover 4" thick
with 1/2" dia bars 4" C/C both way. Complete in all respect as per specification and
instruction of Engineer incharge.
1 No.
W-14 P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar, excavation
of trench & re-filling after laying of pipe. Complete as per specification
and instruction of Engineer Incharge.
40.00 Rft
W-15 Construction of 2'x2' or 2' dia BB manhole, upto required depth i/c 4"
PCC 1:4:8 in bed, BB wall laid & plastered in 1:4 making channel inside
and RCC 1:2:4 cover, 4" thick with 3/8" dia bars 4" C/C both side.
Complete as per instruction of Engineer Incharge.
4 Nos.
1 No.