S.# ITEM OF WORKS NO L B D Qty Unit
T.1 Excavation Cols foundation 4 5.00 5.00 2.00 200.00 Cft
Total 200.00 Cft
T.2 P/L Pcc 1:4:8 in foundation Cols foundation 4 5.00 5.00 0.25 25.00 Cft
Under floor 1 10.00 10.00 0.33 33.00 Cft
Steps 4 14.50 1.00 0.50 29.00 Cft
4 16.50 2.00 0.50 66.00 Cft
Total 153.00 Cft
T.3 P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing 4 5.00 5.00 0.50 50.00
" x5.00+1.25/2x5.00+1.25/2x0.5
4 19.53 Cft
Cols up to bottom slab 4 1.25 1.25 21.75 135.94 Cft
Top slab 1 11.33 11.33 0.41 52.63 Cft
Tie beams 4 10.00 1.25 1.25 62.50 Cft
Bracing beams 4 10.00 1.25 1.25 62.50 Cft
Total 383.10 Cft
T.4 P/L Rcc 1:1½:3 i/c shuttering and finishing
Bottom slab 1 16.50 16.50 0.75 204.19 Cft
Core walls 2 11.33 0.67 8.00 121.46 Cft
" 2 10.00 0.67 8.00 107.20 Cft
Total 432.85 Cft
T.5 Steel reinforcement bars Rcc 1:2:4 item T.3 383.10
Rcc 1:1-1/2:3 item T.4 432.85
Total Rcc 815.94 Cft
Steel bars 815.94 x12/2204 4.44 M.tons
Total 4.44 M.tons
T.6 P/L moasic floor in 1:2 Inner floor 1 10.00 10.00 100.00 Sft
Total 100.00 Sft
T.7 P/L terrazo dado or skirting in 1:2 Inner walls 4 10.00 8.00 80.00 Sft
Total 80.00 Sft
T.8 P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c
and 5/8" Dia bars @12" c/c i/c fixing and painting 1 36.00 36.00 Rft
Total 36.00 Rft
T.9 Earth filling under floor 1 10.00 10.00 0.67 67.00 Cft
Total 67.00 Cft

T.10 Sand filling under floor 1 10.00 10.00 0.33 33.00 Cft
Total 33.00 Cft
T.11 P/L B.B masonry in F&P in 1:6 4 10.00 1.25 1.50 75.00 Cft
Total 75.00 Cft
T.12 P/L 2" thick Pcc 1:2:4 floor toping 1 16.50 16.50 272.25 Sft
Total 272.25 Sft
T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"
and 18 gauge m.s sheet and painting 1 1 No
Total 1 No
T.14 P/F 4" Dia C.I bell mouth 2 2 Nos
Total 2 Nos
T.15 P/F 4" Dia G.I pipe 9 gauge
Rising,Delivery,Washing,Overflow 4 40.00 160.00 Rft
Total 160.00 Rft
T.16 P/F 4' Dia G.I long bend 4 4.00 Nos
Total 4.00 Nos
T.17 P/F 4" Dia duck foot bend 4 4.00 Nos
Total 4.00 Nos
T.18 P/F: Railing 4 16.00 64.00 Rft
Total 64.00 Rft
http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more

ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS

S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT


3.23b+3.16a
T.1 Excavation Cols foundation 4 5.00 5.00 2.00 200.00 Cft
Total 200.00 Cft 4.52 904.00
06.03b
T.2 P/L Pcc 1:4:8 in foundation Cols foundation 4 5.00 5.00 0.25 25.00 Cft
Under floor 1 10.00 10.00 0.33 33.00 Cft
Steps 4 14.50 1.00 0.50 29.00 Cft
4 16.50 2.00 0.50 66.00 Cft
Total 153.00 Cft 75.19 11504.07
6.06a-03
T.3 P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing 4 5.00 5.00 0.50 50.00
" 4 x5.00+1.25/2x5.00+1.25/2x0.5 19.53 Cft
Cols up to bottom slab 4 1.25 1.25 21.75 135.94 Cft
Top slab 1 11.33 11.33 0.41 52.63 Cft
Tie beams 4 10.00 1.25 1.25 62.50 Cft
Bracing beams 4 10.00 1.25 1.25 62.50 Cft
Total 383.10 Cft 153.44 58782.67
6-06-b-02
T.4 P/L Rcc 1:1½:3 i/c shuttering and finishing
Bottom slab 1 16.50 16.50 0.75 204.19 Cft
Core walls 2 11.33 0.67 8.00 121.46 Cft
" 2 10.00 0.67 8.00 107.20 Cft
Total 432.85 Cft 165.36 71575.27
6.07b
T.5 Steel reinforcement bars Rcc 1:2:4 item T.3 383.10
Rcc 1:1-1/2:3 item T.4 432.85
Total Rcc 815.94 Cft
Steel bars 815.94 x12/2204 4.44 M.tons
Total 4.44 M.tons 86060.41 382108.22
10.22a+(10.43a = 10x10 room = 1/61 P.Sft)
T.6 P/L moasic floor in 1:2 Inner floor 1 10.00 10.00 100.00 Sft

Page 3
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
Total 100.00 Sft 61.47 6147.00
10.40a-01
T.7 P/L terrazo dado or skirting in 1:2 Inner walls 4 10.00 8.00 80.00 Sft
Total 80.00 Sft 52.56 4204.80

Page 4
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
N.S
T.8 P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c
and 5/8" Dia bars @12" c/c i/c fixing and painting 1 36.00 36.00 Rft
Total 36.00 Rft 280 10080.00
3.16-b+3.04-a+3.18-c+3.19-b+3.26-b-02
T.9 Earth filling under floor 1 10.00 10.00 0.67 67.00 Cft
Total 67.00 Cft 6.45 432.15
07.30
T.10 Sand filling under floor 1 10.00 10.00 0.33 33.00 Cft
Total 33.00 Cft 12.21 402.93
07.04a-05
T.11 P/L B.B masonry in F&P in 1:6 4 10.00 1.25 1.50 75.00 Cft
Total 75.00 Cft 100.81 7560.75
10.15-e+10.43-c
T.12 P/L 2" thick Pcc 1:2:4 floor toping 1 16.50 16.50 272.25 Sft
Total 272.25 Sft 35.35 9624.04

Non Schedule
T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"
and 18 gauge m.s sheet and painting 1 1 No
Total 1 No 3500 3500.00
9.19a+9.20/15+9.21/15
T.14 P/F 4" Dia C.I bell mouth 2 2 Nos
Total 2 Nos 363.71 727.42
24-16-c-09
T.15 P/F 4" Dia G.I pipe 9 gauge
Rising,Delivery,Washing,Overflow 4 40.00 160.00 Rft
Total 160.00 Rft 202.21 32353.60
24-30-d-07
T.16 P/F 4' Dia G.I long bend 4 4.00 Nos
Total 4.00 Nos 428.09 1712.36
Non Schedule
T.17 P/F 4" Dia duck foot bend 4 4.00 Nos
Total 4.00 Nos 640 2560.00
25-37+13-06b01+2x13.06d02
T.18 P/F: Railing 4 16.00 64.00 Rft
Total 64.00 Rft 322.26 20624.64

Page 5
S.# ITEM OF WORKS NO L B D CONTENT UNIT RATE AMOUNT
624803.92

Page 6
Page 7
Task No 08
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I
KHAN

ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR
D.I KHAN
ABSTRACT OF COST

S No, Description Amount(Rs.)

1- Civil Work 1,565,436

2- Internal Electrification 85,801

3- Water Supply 144,176

G.Total 1,795,412

http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more
ks and much more
Task No 08

COST ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS

S.# CSR item Coad Description UNIT Qty RATE

T.1 3.23b+3.16a Excavation Cols foundation Cft 200 4.52

P/L Pcc 1:4:8 in foundation Cols


T.2 06.03b Cft 153 75.19
foundation
P/L Rcc 1:2:4 i/c shuttering and finishing
T.3 6.06a-03 Cft 383.1 153.44
Cols footing

T.4 6-06-b-02 P/L Rcc 1:1½:3 i/c shuttering and finishing Cft 432.85 165.36
Steel reinforcement bars Rcc 1:2:4
T.5 6.07b MT 4.44 86060.41
item T.3
10.22a+(10.4
3a = 10x10 P/L moasic floor in 1:2 Inner
T.6 Sft 100 61.47
room = 1/61 floor
P.Sft)
P/L terrazo dado or skirting in 1:2 Inner
T.7 10.40a-01 Sft 80 52.56
walls
P/F steel ladder made of 2"x2"x1/4" angle
T.8 N.S iron @15"c/c and 5/8" Dia bars @12" c/c Rft 36 280
i/c fixing and painting
3.16-b+3.04-
a+3.18-
T.9 Earth filling under floor Cft 67 6.45
c+3.19-
b+3.26-b-02
T.10 07.30 Sand filling under floor Cft 33 12.21

T.11 07.04a-05 P/L B.B masonry in F&P in 1:6 Cft 75 100.81

T.1210.15-e+10.43-c P/L 2" thick Pcc 1:2:4 floor toping Sft 272.25 35.35
P/F 2'x2' man hole cover made of 1-
T.13 Non Schedule 1/2"x1-1/2"x1/8" and 18 gauge m.s sheet N 1 3500
and painting
9.19a+9.20/1
T.14 P/F 4" Dia C.I bell mouth N 2 363.71
5+9.21/15
P/F 4" Dia G.I pipe 9 gauge
T.15 24-16-c-09 Rft 160 202.21
Rising,Delivery,Washing,Overflow

T.16 24-30-d-07 P/F 4' Dia G.I long bend No 4 428.09

T.17 Non Schedule P/F 4" Dia duck foot bend N 4 640

25-37+13-
T.18 06b01+2x13. P/F: Railing Rft 64 322.26
06d02
Total:
000 GALLONS
http://mosttutorials.blogspot.com/
Free Civil Engineering Softwares,tutorials.setups,ebooks and much
AMOUNT more

904

11504.07

58782.864

71576.076

382108.2204

6147

4204.8

10080

432.15

402.93

7560.75

9624.0375

3500

727.42

32353.6

1712.36

2560

20624.64
624804.9
Task No 08

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI


BAHARA FR D.I KHAN

GENERAL ABSTRACT OF COST

S No, Description Amount(Rs.)

1- Doors & Windows of Doctor House 445,520


2- Dining Hall Wash Basin 4,544
3- Quarter Class-IV + Chowkidar House (Doors & Windows 562,249
4- BHU Distempering 46,879
5- Overhead Water Tank 624,805
6- Transformer 25 KV etc. 304,206
7- Boring of Tube Well & Machinary 2,171,617
8- Stabilizer 10000 watt 16,500
9- 1½" G.I Pipe 24,350
10- Labour Room + Medical Lab 1,795,412
G.Total 5,996,082
http://mosttutorials.blogspot.com/
Free Civil Engineering Softwares,tutorials.setups,ebooks and
much more
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN

TASK-8
Doors & Windows of Doctor House

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

1- 04-34 Removing door with chowkat (Existing) No 16.00 164.43 2630.88

2- 04-35 Removing windows CSW No 9.00 119.73 1077.57

P/F: of 1st class 1½" thick paneled door with 2½"x5" 16


12.07c+12.24c+ gauge M.S Sheet chowkat i/c all hardware and iron mongry
12.27a/28+13.0 such as earl drawer, handle, tower bolt, holdfast, cleat and
3- 6c- stopper with 1½" thick panel door of 18 gauge M.s Sheet, 2 Sft 370.00 805.19 297920.3
01+(2x13.06c02 coats of read oxide and 3 coats of synthetic enamel paint,
) filling of box with PCC 1:2:4. Complete in all respect as per
specification and instruction of E/Incharge.

P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1½" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
25.039-b- iron mongery & hardware such as hinges, holdfast, cleat &
4- Sft 241.00 597.06 143891.46
05+12.50 stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.

Sub Total : 445520.21

Dining Hall Wash Basin

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05a-
stop cocks (Fisal or equivalent), C.P inlet pipe and
1- 03+(14.25x2)+1 No 2 2272.18 4544.36
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.

Sub Total : 4544.36

Quarter Class-IV & Chowkidar House


S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

1- 04-34 Removing door with chowkat (Existing) No 21 164.43 3453.03

2- 04-35 Removing windows CSW No 12 119.73 1436.76

S/F: of Steel doors 18 SWG MS sheet with angle iron frame


3- Sft 84 251.56 21131.04
1½"x1½"x1/8", bolt, hinges & paint etc.

P/F: of 1st class 1½" thick paneled door with 2½"x5" 16


12.07c+12.24c+ gauge M.S Sheet chowkat i/c all hardware and iron mongry
12.27a/28+13.0 such as earl drawer, handle, tower bolt, holdfast, cleat and
4- 6c- stopper with 1½" thick panel door of 18 gauge M.s Sheet, 2 Sft 433.5 805.19 349049.865
01+(2x13.06c02 coats of read oxide and 3 coats of synthetic enamel paint,
) filling of box with PCC 1:2:4. Complete in all respect as per
specification and instruction of E/Incharge.

P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1½" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
iron mongery & hardware such as hinges, holdfast, cleat &
5- 25.039-b-05+12.50 Sft 313.5 597.06 187178.31
stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.

Sub Total : 562249.005


BHU Distempering

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

P/A: 2 coats of distemper SPD of (Berger Robbialac) or


equivalent) on walls or ceiling as per approved shade &
1- (11.23-a-03) quality i/c scraping of old surface, putty filling, cement repair Sft 4034.34 11.62 46879.0308
where required & brining the surface to sparkling finish,
complete as per instruction of Engineer incharge.

Sub Total : 46879.03

Transformer 25 KV

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of


6' complete in all respect as per WAPDA specification I/c
1- 15.39 No 2 16103 32206
HT shackles disc, insulators wooden bars etc. earthing of
each pole as per instruction of Engineer incharge.

S/F of HT line of aluminum conductor 7/.132 aluminum as


per WAPDA specification I/c 3% saage, cutting, jointing.
2- Non Schedule Rft 800 60 48000
Complete in all respect as per specification and instruction
of Engineer incharge.

P/F of 4 core cable as per design 19/.083 for connection of


electric board for motor to transformer. Complete in all
3- Non Schedule Rft 60 400 24000
respect as per specification and instruction of Engineer
incharge.

P/F: of transformer 25 KVA "Climax" I/c H.poles with


4- Non Schedule No 1 200000 200000
transformer for meter etc. as per WAPDA specification.

Sub Total : 304206


New Tube Well

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

1- Non Schedule Resistivity of survey for selection of site. Job 1 30000 30000

2- 24.01 Mobilization of boring plant and equipment to site Job 1 20000 20000

Tube Well boring in all kind of soil except shangle/rock 18"


3- 24.02a-09 Rft 100 1124.76 112476
I/d from ground upto 100' below G.L

4- 24.02b07 From 101' to 200' below G.L 18" I/d. Rft 100 1424.37 142437

5- 24.02c07 From 201' to 300' below G.L 18" I/d. Rft 100 1424.37 142437

6- 24.02-d25 From 301' to 340' below G.L 18" I/d. Rft 40 1707.59 68303.6

7- Non Schedule Subsequent shifting to next site (if required) Job 1 20000 20000

Providing and installation PVC blind pipe in tube well with


8- 24.12c04 stranger BSS class "D" working pressure and jointing. 12" Rft 340 1709.8 581332
I/d
9- 24.06 Furnishing sample of water from bore hole and testing. Sets 4 1323.55 5294.2
S/Installation of 12" dia 2' long M.S bail plug in tube well
10- 24.08d bore hole. Complete in all respect as per specification and No 1 2181.54 2181.54
instruction of Engineer incharge.
S/Installation on MS suspension clamp of heavy duty 3/8"
11- 24.39c Job 1 1089 1089
thick 12" I/d with PCC 1:2:4 block round it Complete.
Furnishing/installation of MS cap over housing pipe with
12- 24.36a locking arrangement. Complete in all respect as per Job 1 884 884
specification and instruction of Engineer incharge.

Shrouding with graded gravel pack 3/8" to 1/8" around tube


13- 24.14 well in bore hole. Complete in all respect as per Rft 340 133.66 45444.4
specification and instruction of Engineer incharge.
0
Development and testing of tube well with air compressor
14- 24.13b over 1.5 cusecs discharge. Complete in all respect as per Hrs 72 511 36792
specification and instruction of Engineer incharge.

Development and testing of tube well with "D" and "T" unit.
15- Non Schedule Complete in all respect as per specification and instruction Job 1 20000 20000
of Engineer incharge.
Supply/Installation of "KSB" submersible pumping set with
seimens A.C electric motor upto 40 H.P, 6" dia 12 stages
KSB pump, 6" dia KSB column pipes of required length, 4
core submersible electric cable for 40 HP motor to electric
starter, 14 gauge main switch board, star/delta "Seimens"
16- Non Schedule starter, Japan made, bolt meter, Ampere meter and selector Set 1 750000 750000
switches, phase indicator lamps, earthing of main switch
board and starter, 6" dia sluice valve and non return valve
of "AERO Brand" 6" dia M.S long bend and 18 gauge M.S
sheet cover for bore hole. Complete in all respect as per
specification and instruction of Engineer incharge.

P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC
17- 24.22c pipe I/c jointing material. Complete in all respect as per Nos 2 5568 11136
specification and instruction of Engineer incharge.

P/F: of 6" dia G.I pipe or CI Tee with jointing material.


18- Non Schedule Complete in all respect as per specification and instruction Nos 2 3500 7000
of Engineer incharge.

P/F: of 6" dia GI pipe heavy quality I/c excavation of trench


19- 24.16a02 and refilling. Complete in all respect as per specification Rft 250 647.84 161960
and instruction of Engineer incharge.

P/F: of 6" dia G.I socket heavy quality. Complete in all


20- Non Schedule respect as per specification and instruction of Engineer Nos 9 650 5850
incharge.

P/F: of 6" dia G.I Long bend heavy quality with jointing
21- Non Schedule material. Complete in all respect as per specification and Nos 2 3500 7000
instruction of Engineer incharge.

Sub Total : 2171616.74

Stabilizer (10000 Watt)

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

1- S/F: 10000 watt Stablizier (Universal or Allied) No 1 16500 16500

Sub Total : 16500

Water Supply

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

P/Fixing 1½" dia G.I pipe (IIL-L) or equivalent in trench I/c


excavation and its refilling, all necessary fitting for pipe.
2 24-16-c-05 Rft 200 121.75 24350
Complete in all respect as per specification and instruction
of Engineer incharge.
ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I KHAN

Civil Work
S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

Excavation as in foundation of building upto required depth


in all kind of soil i/c subsequent re-filling in trenches and
plinth area or where required, disposal of surplus earth as
C-1 3.23b+3.16a Cft 1809 4.52 8176.68
directed, watering, ramming and consolidating the earth as
as specified complete in all respect as per specification and
instruction of E/Incharge.
P/A: termite proofing chemicals in 3 stages as per
C-2 26.15 Sft 880 1.26 1108.8
specification and instruction of Engineer Incharge.
P/L: P.C.C 1:4:8 in any part of building such as foundation,
sub flooring etc. using 1½" down graded stone aggregate
C-3 06.03b i/c framework, placing, compacting, leveling and curing etc. Cft 3695.6 75.19 277872.164
Complete as per specification and instruction of Engineer
incharge.
P/L: 1st class BB masonry in foundation and plinth in 1:6
cement sand mortar i/c racking out the joints where
C-4 07.04a-05 Cft 1008.95 100.81 101712.2495
necessary scaffolding & curing etc. Complete in all respect
as per specification and instruction if Engineer incharge.

P/L: 2" thick DPC with cement concrete, 1:2:4 using


approved quality fine/course aggregate i/c farmwork,
compacting, leveling, finishing and curing etc. 2 coats of hot
C-5 6.22a-02 Sft 141 32.34 4559.94
bitumen (PB/3 or PB/4) and 2 layers of approved polythene
sheet. Complete in all respect as per specification and
instruction of Engineer incharge.

P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam,


lintels, slabs, sun shade & projection etc. of specified
strength using approved quality crushed stone & fine
aggregate i/c formwork & its removal, compacting, vibrating,
leveling, finishing and curing etc. but excluding the cost of
C-6 6.06a-03 Cft 1104.89 153.44 169534.3216
MS re-inforcement bars i/c cost of RCC design & lab tests.
RCC works be designed & submitted well in time by the
contractor from approved designer or reputed structure
designer. Complete in all respect as per specification and
instruction of Engineer icharge.

P/F: in position mild steel, reinforcement bars of minimum


40000 PSI yield strength, of any size and diameter i/c
straightening, bending, placing, binding in position and
binding wire, spacer, wastage etc. Steel required for RCC
C-7 06.07c M.T 3.68 86060.4 316702.3088
works be designed & submitted well before by the
contractor from approved designer or reputed structure
designer. Complete in all respect as per specification and
instruction of Engineer incharge.

P/L: 1st class BB masonry in superstructure in any


thickness of wall. Set in 1:6 cement sand mortar i/c racking
C-8 07.05a-05 out the joints where necessary, Scaffolding, making Cft 1303.88 108.55 141536.174
grooves and corners where required & curing etc. Complete
as per specification and instruction of Engineer Incharge.

Earth filing: under floors with earth brought from out side
3.16-b+3.04-
approved source i/c all leads & lifts, filling in layers not more
C-9 a+3.18-c+3.19- Cft 1218 6.45 7856.1
than 6" thick, consolidating upto specified density and to the
b+3.26-b-02
satisfaction of Engineer incharge.

P/F: clean course sand under floors from an approved


source i/c leveling, watering, compacting etc. Complete in
C-10 07.30 Cft 404 12.21 4932.84
all respect as per specification and instruction of Engineer
incharge
P/L: mosaic floors consisting of 1½" thick PCC 1:2:4 divided
into panels not morethan 3'x3' with 3/8" thick marble strip
10.22a+(10.43a
and 1/2" thick mosaic topping (1 part of grey cement & 3
C-11 = 10x10 room = Sft 826.63 61.47 50812.95
parts of approved colour and size marble chips i/c curing,
1/61 P.Sft)
grinding, rubbing and polishing etc. Complete as per
specification and instruction of Engineer incharge.

P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick


cement plaster in 1:3 ratio, (1 part of gray cement and three
C-12 10.40a-01 parts of approved colour and size marble chips i/c grinding, Sft 80 52.56 4204.8
rubbing, curing and wax polishing etc. Complete as per
specification and instruction of Engineer incharge.

P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar


i/c scaffolding, chamfering of edges, rounding the corners,
making grooves and edges where required, P/F: of
C-13 11.09b Sft 4812.56 11.82 56884.46
expended metal jali, 1/2"x1/2" size, 1' wide at all joints of
RCC & bricks & curing etc. Complete as per specification
and instruction of Engineer Incharge.

P/A: deep struck pointing in cement/surkhi mortar in 1:1


with approved colour i/c racking out the joints not less than
C-14 11.18a 1/2" deep, saturating the surface, scaffolding & curing etc. Sft 1567.5 13.11 20549.93
Complete in all respect as per specification and instruction
of Engineer incharge.

P/F: of 1st class 1½" thick paneled door with 2½"x5" 16


gauge M.S Sheet chowkat i/c all hardware and iron mongry
such as earl drawer, handle, tower bolt, holdfast, cleat and
12.07c+12.24c+12.27a/28+13.06c-01+(2x13.06c02)
C-15 stopper with 1½" thick panel door of 18 gauge M.s Sheet, 2 Sft 158.25 805.19 127421.3175
coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per
specification and instruction of E/Incharge.

P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1½" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
iron mongery & hardware such as hinges, holdfast, cleat &
C-1625.039-b-05+12.50 Sft 155 597.06 92544.3
stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.

P/A: 3 coats of distemper SPD of (Berger Robbialac) or


equivalent) on walls or ceiling as per approved shade &
C-17 (11.23-a-03) Sft 4812.56 15.09 72621.53
quality i/c scraping of old surface, putty filling, cement repair
where required & brining the surface to sparkling finish,

P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps
9.19a+9.20/15+ and 3 coats of synthetic enamel paint. complete in all
C-18 Rft 75 363.71 27278.25
9.21/15 respect as per specification and instruction of Engineer
incharge.

S/F: of 1½" thick D/Wood joinery as in wire gauze door


12.13d+13.06b-
without chowkat i/c all iron mongery and hardware such as
C-19 01+(13.06b- Sft 63.75 90.15 5747.06
hinges, handle, holdfast, door spring and tower bolts etc. as
02x2)
approved, 12x24 wire mesh and 3 coats of S/E paint.

P/L: PCC 1:3:6 as in plinth protection, around the building


over compacted earth or where required i/c framework,
C-20 6.05h Cft 152.96 101.41 15511.67
placing, curing, leveling, compacting and finishing etc.
Complete in all respect
P/L: roof treatment consisting of:-
a) 2 coats of hot bitumen with sand blinding.
09.05+09.12+11 b) 2 layers of approved polythene sheet.
C-21 .17+polythene c) 4" thick compacted earth with proper slope. Sft 836 69.22 57867.92
sheet d) 1½" thick brick tiles in 1:6, grouting in 1:3 and flush
pointing in 1:1
Complete
Sub Total : 1565435.76
INTERNAL ELECTRIFICATION

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

Wiring of light or fan point from point to switch with 2x3/.029


Pakistan cable i/c sub circuit wiring with 7/.029 Pakistan
cable, with all accessories such as PVC concealed conduit
E-1 Non Schedule No 20 783.5 15670
PPI switches (premier) fixed on plastic sheets & wooden
box, ceiling rose and holder etc. Complete as per
instruction of Engineer Incharge.

Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3


pin 15 Amp. power plug i/c P/F: of 15 Amp. switch socket
E-2 Non Schedule unit PPI (China clay base) fixed on wooden box on No 5 950 4750
separate circuit. Complete as per instruction of Engineer
Incharge.

P/F: 4' long tube light (Asia/M. Inayatullah made) with


E-3 15.24b starter, tube rod (Phillips) and choke. Complete as per No 12 528.17 6338.04
specification and instruction of Engineer Incharge.

P/F: of 56" sweep capacitor type ceiling fan with dimmer,


E-4 15.68c (Pak Fan Delux) i/c suspension rod and canopy etc. No 6 2433.13 14598.78
Complete as per instruction of Engineer Incharge.

Same as item # E-1, but wiring of 5 pin 5 Amp. light plug


away from switch board i/c P/F: of PPI (premier) light plug
E-5 Non Schedule No 6 400 2400
i/c wiring with 7/.029 etc. Complete as per instruction of
Engineer Incharge.

Providing and Fixing of main board having:-


a. 20 AMP TPN- ACB 01 No. (Hager)
or Tarrasaki
E-6 Non Schedule No 1 18000 18000
b. 10 AMP single phase ACB 08 Nos.
i/c connection of earth with main switch, Complete in all
respect.

P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of


E-7 Non Schedule approved quality i/c connection from nearest source to main Rft 180 80 14400
board.

P/Fixing: 12" Sweep (Pak) Exhaust fan with louver.


E-8 15.69a Complete in all respect as per specification and instruction No 2 1618.54 3237.08
of Engineer incharge.

Earthing of main switch with 8 SWG copper wire, laid in


1/2" dia GI pipe from main switch to 2'x2' copper plate
E-9 15.53 burried in 14 feet deep pit alongwith salt & charcoal mixture. No 1 6406.6 6406.6
Complete in all respect as per specification and instruction
of Engineer incharge.

Sub Total : 85800.5


WATER SUPPLY & SANITARY INSTALLATION

S No. CSR item Coad Description Unit Qty Rate Amount (Rs.)

P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master"


14.03a+14.10a+ Tanki, P/Trap, Stop Cock, Plastic Connection & Hockey
W-1 No 1 3280.13 3280.13
14.25+14.47a Pipe etc. Complete as per specification and instruction of
Engineer Incharge.

P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05a-
stop cocks (Fisal or equivalent), C.P inlet pipe and
W-2 03+(14.25x2)+1 No 1 2272.18 2272.18
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.

P/F: CP adjustable shower rose i/c stop cock and CP inlet


W-3 14.26a+14.23 No 1 684.82 684.82
pipe etc. Complete as per instruction of Engineer Incharge.

P/F: Brass bib cock ½" dia screw down type Faisal or
W-4 14.39-a equivalent make. Complete as per instruction of Engineer No 2 185.31 370.62
Incharge.
P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
W-5 14.34b-01 Rft 30 377.4 11322
making holes and repair to original shape. Complete in all
respect. 4" dia CI pipe.

P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
14.34b-02 Rft 18 257.42 4633.56
making holes and repair to original shape. Complete in all
respect. 2" dia CI pipe.
S/L: jointing and testing of ½" dia GI pipe (IIL-L) i/c tees,
W-6 24.16c-01 bends, union, elbows, socket etc. Making hole and repair Rft 80 42.74 3419.2
complete.
P/F: 3" floor trap of CI i/c CP grating, caulking the joints with
W-7 14.31a No 2 597.03 1194.06
cement and hole repair complete.
Providing and Fixing of best quality 24" long towel rail.
(Fiasal or equivalent of approved quality). Complete in all
W-8 14.16a No 1 415.88 415.88
respect as per specification and instruction of Engineer
incharge.

Providing and Fixing of best quality Plastic soap dish.


(Fiasal or equivalent of approved quality). Complete in all
W-9 14.20a No 1 110.53 110.53
respect as per specification and instruction of Engineer
incharge.

Providing and Fixing of best quality Plastic paper holder.


(Fiasal or equivalent of approved quality). Complete in all
W-10 14.20b No 1 129.23 129.23
respect as per specification and instruction of Engineer
incharge.

P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made.


W-11 14.24b No 2 353.56 707.12
Complete as per specification and instruction of E/Incharge.

Construction of septic tank of BB size, 8'x4'x6' with 9" thick


BB wall, 4½" thick BB partition, 1/2" thick cement plaster in
W-12 Non Schedule 1:4 and 6" thick PCC 1:3:6 in foundation and bed, 4" thick No 1 30000 30000
RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both
way. Complete as per instruction of Engineer Incharge.

Construction of 6' internal dia 30' deep soakage pit i/c 9"
thick BB in 1:4 from top to 6' depth, filling of pit with stone
W-13 Non-Schedule boulder, making chemny and RCC 1:2:4 cover 4" thick with No 1 45000 45000
1/2" dia bars 4" C/C both way. Complete in all respect as
per specification and instruction of Engineer incharge.

P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar,
excavation of trench & re-filling after laying of pipe.
W-14 23.01b Rft 40 101.26 4050.4
Complete as per specification and instruction of Engineer
Incharge.
Construction of 2'x2' or 2' dia BB manhole, upto required
depth i/c 4" PCC 1:4:8 in bed, BB wall laid & plastered in
W-15 Non-Schedule No 4 3500 14000
1:4 making channel inside and RCC 1:2:4 cover, 4" thick
with 3/8" dia bars 4" C/C both side.
W-16 14-69-b-03 S/F: of polythene water tank 500 gallons No 1 22586 22586
Sub Total : 144175.73
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA
FR D.I KHAN

TASK-8
Doors & Windows of Doctor House

1- Removing door with chowkat (Existing)

16 Nos.

2- Removing windows CSW


9 Nos.

3- P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
10 3.50 7.00 = 245.00 Sft
1 3.00 7.00 = 21.00 Sft
4 2.50 7.00 = 70.00 Sft
Total = 370.00 Sft

4- P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.

2 8.00 5.50 = 88.00 Sft


3 6.00 5.50 = 99.00 Sft
2 4.00 5.50 = 44.00 Sft
1 3.00 2.00 = 6.00 Sft
1 2.00 2.00 = 4.00 Sft
Total = 241.00 Sft

Dining Hall Wash Basin

1- P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.

2 Nos.
Quarter Class-IV & Chowkidar House

1- Removing door with chowkat (Existing)

21 Nos.

2- Removing windows CSW


12 Nos.

3- S/F: of Steel doors 18 SWG MS sheet with angle iron frame 1½"x1½"x1/8", bolt,
hinges & paint etc.

3 4.00 7.00 = 84.00 Sft


Total = 84.00 Sft

4- P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
6 3.50 8.50 = 178.50 Sft
3 3.50 7.00 = 73.50 Sft
3 3.00 8.50 = 76.50 Sft
6 2.50 7.00 = 105.00 Sft
Total = 433.50 Sft

5- P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.

3 6.00 5.50 = 99.00 Sft


6 5.00 5.50 = 165.00 Sft
3 3.00 5.50 = 49.50 Sft
Total = 313.50 Sft

BHU Distempering

1- P/A: 2 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.

987.65 Sft
3046.69 Sft
4034.34 Sft
Transformer 25 KV

1- S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of 6' complete in all respect
as per WAPDA specification I/c HT shackles disc, insulators wooden bars etc. earthing
of each pole as per instruction of Engineer incharge.

2 Nos.

2- S/F of HT line of aluminum conductor 7/.132 aluminum as per WAPDA specification I/c
3% saage, cutting, jointing. Complete in all respect as per specification and instruction
of Engineer incharge.

800 Rft

3- P/F of 4 core cable as per design 19/.083 for connection of electric board for motor to
transformer. Complete in all respect as per specification and instruction of Engineer
incharge.
60.00 Rft

4- P/F: of transformer 25 KVA "Climax" I/c H.poles with transformer for meter etc. as per
WAPDA specification.

1 Nos.

ESTIMATE FOR CONSTRUCTION OF NEW TUBE WELL BORING & MACHINARY

New Tube Well

1- Resistivity of survey for selection of site.

1 Job

2- Mobilization of boring plant and equipment to site

1 Job

3- Tube Well boring in all kind of soil except shangle/rock 18" I/d from ground upto 100'
below G.L
100.00 Rft

4- From 101' to 200' below G.L 18" I/d.

100.00 Rft

5- From 201' to 300' below G.L 18" I/d.

100.00 Rft

6- From 301' to 340' below G.L 18" I/d.

40.00 Rft
7- Subsequent shifting to next site (if required)

1 Job

8- Providing and installation PVC blind pipe in tube well with stranger BSS class "D"
working pressure and jointing. 12" I/d

340.00 Rft

9- Furnishing sample of water from bore hole and testing.

4 Sets

10- S/Installation of 12" dia 2' long M.S bail plug in tube well bore hole. Complete in all
respect as per specification and instruction of Engineer incharge.

1 No.

11- S/Installation on MS suspension clamp of heavy duty 3/8" thick 12" I/d with PCC 1:2:4
block round it Complete.

1 Job

12- Furnishing/installation of MS cap over housing pipe with locking arrangement.


Complete in all respect as per specification and instruction of Engineer incharge.

1 Job

13- Shrouding with graded gravel pack 3/8" to 1/8" around tube well in bore hole.
Complete in all respect as per specification and instruction of Engineer incharge.

340.00 Rft

14- Development and testing of tube well with air compressor over 1.5 cusecs discharge.
Complete in all respect as per specification and instruction of Engineer incharge.

72.00 Hrs

15- Development and testing of tube well with "D" and "T" unit. Complete in all respect as
per specification and instruction of Engineer incharge.

1 Job

16- Supply/Installation of "KSB" submersible pumping set with seimens A.C electric motor
upto 40 H.P, 6" dia 12 stages KSB pump, 6" dia KSB column pipes of required length,
4 core submersible electric cable for 40 HP motor to electric starter, 14 gauge main
switch board, star/delta "Seimens" starter, Japan made, bolt meter, Ampere meter and
selector switches, phase indicator lamps, earthing of main switch board and starter, 6"
dia sluice valve and non return valve of "AERO Brand" 6" dia M.S long bend and 18
gauge M.S sheet cover for bore hole. Complete in all respect as per specification and
instruction of Engineer incharge.

1 Set
17- P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC pipe I/c jointing material.
Complete in all respect as per specification and instruction of Engineer incharge.

2 Nos.

18- P/F: of 6" dia G.I pipe or CI Tee with jointing material. Complete in all respect as per
specification and instruction of Engineer incharge.

2 Nos.

19- P/F: of 6" dia GI pipe heavy quality I/c excavation of trench and refilling. Complete in
all respect as per specification and instruction of Engineer incharge.

250.00 Rft

20- P/F: of 6" dia G.I socket heavy quality. Complete in all respect as per specification and
instruction of Engineer incharge.

9 Nos.

21- P/F: of 6" dia G.I Long bend heavy quality with jointing material. Complete in all
respect as per specification and instruction of Engineer incharge.

2 Nos.

Stabilizer (10000 Watt)

1- S/F: 10000 watt Stablizier (Universal or Allied)

1 No.

Water Supply

P/Fixing 1½" dia G.I pipe (IIL-L) or equivalent in trench I/c excavation and its refilling, all necessary
fitting for pipe. Complete in all respect as per specification and instruction of Engineer incharge.

200.00 Rft

ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I
KHAN

Civil Work

C-1 Excavation as in foundation of building upto required depth in all kind of soil i/c subsequent re-filling
in trenches and plinth area or where required, disposal of surplus earth as directed, watering,
ramming and consolidating the earth as as specified complete in all respect as per specification and
instruction of E/Incharge.

2 56.75 3.00 3.00 = 1021.50 Cft


5 13.50 3.00 3.00 = 607.50 Cft
1 3.00 3.00 3.00 = 27.00 Cft
1 3.00 1.50 2.00 = 9.00 Cft
9 4.00 4.00 1.00 = 144.00 Cft
Total = 1809.00 Cft
C-2 P/A: termite proofing chemicals in 3 stages as per specification and instruction of Engineer
Incharge.

As per Covered Area 880.00 Sft

C-3 P/L: P.C.C 1:4:8 in any part of building such as foundation, sub flooring etc. using 1½" down graded
stone aggregate i/c framework, placing, compacting, leveling and curing etc. Complete as per
specification and instruction of Engineer incharge.

2 56.75 3.00 0.75 = 255.38 Cft


5 13.50 3.00 0.75 = 151.88 Cft
1 3.00 3.00 0.75 = 6.75 Cft
1 3.00 1.50 0.50 = 2.25 Cft
9 4.00 4.00 0.50 = 72.00 Cft
1 20.00 16.00 0.50 = 160.00 Cft
1 15.00 16.00 0.50 = 120.00 Cft
1 10.00 10.00 0.50 = 50.00 Cft
1 5.00 5.00 0.50 = 12.50 Cft
1 10.00 5.50 51.50 = 2832.50 Cft
1 11.25 5.75 0.50 = 32.34 Cft
Total = 3695.60 Cft

C-4 P/L: 1st class BB masonry in foundation and plinth in 1:6 cement sand mortar i/c racking out the
joints where necessary scaffolding & curing etc. Complete in all respect as per specification and
instruction if Engineer incharge.

2 54.87 1.87 0.75 = 153.91 Cft


2 54.50 1.50 0.75 = 122.63 Cft
2 54.12 1.13 0.75 = 91.73 Cft
2 53.75 0.75 2.50 = 201.56 Cft
5 14.87 1.87 0.75 = 104.28 Cft
5 15.25 1.50 0.75 = 85.78 Cft
5 15.62 1.13 0.75 = 66.19 Cft
5 16.00 0.75 2.50 = 150.00 Cft
1 4.25 1.50 0.75 = 4.78 Cft
1 4.62 1.13 0.75 = 3.92 Cft
1 5.00 0.75 2.50 = 9.38 Cft
1 4.25 1.50 0.75 = 4.78 Cft
1 4.62 1.13 0.75 = 3.92 Cft
1 5.00 0.38 3.25 = 6.09 Cft
Total = 1008.95 Cft

C-5 P/L: 2" thick DPC with cement concrete, 1:2:4 using approved quality fine/course aggregate i/c
farmwork, compacting, leveling, finishing and curing etc. 2 coats of hot bitumen (PB/3 or PB/4) and
2 layers of approved polythene sheet. Complete in all respect as per specification and instruction of
Engineer incharge.

1 188.00 0.75 = 141.00 Sft


Total = 141.00 Sft
C-6 P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam, lintels, slabs, sun shade & projection etc.
of specified strength using approved quality crushed stone & fine aggregate i/c formwork & its
removal, compacting, vibrating, leveling, finishing and curing etc. but excluding the cost of MS re-
inforcement bars i/c cost of RCC design & lab tests. RCC works be designed & submitted well in
time by the contractor from approved designer or reputed structure designer. Complete in all
respect as per specification and instruction of Engineer icharge.

2 53.75 0.75 0.75 = 60.47 Cft


5 16.00 0.75 0.75 = 45.00 Cft
2 5.00 0.75 0.75 = 5.63 Cft
1 5.00 0.38 0.75 = 1.41 Cft
8 4.00 4.00 1.00 = 128.00 Cft
8 4.00 4.00 0.33 = 42.24 Cft
8 0.75 0.75 15.00 = 67.50 Cft
1 5.50 0.75 0.75 = 3.09 Cft
3 5.00 0.75 0.75 = 8.44 Cft
2 4.00 0.75 0.75 = 4.50 Cft
1 7.50 0.75 0.75 = 4.22 Cft
4 6.50 0.75 0.75 = 14.63 Cft
2 4.50 0.75 0.75 = 5.06 Cft
1 18.50 54.75 0.50 = 506.44 Cft
2 54.75 0.33 2.25 = 81.30 Cft
2 18.50 0.33 2.25 = 27.47 Cft
1 24.00 2.00 0.25 = 12.00 Cft
8 0.75 0.75 15.00 = 67.50 Cft
8 2.50 1.00 1.00 = 20.00 Cft
Total = 1104.89 Cft

C-7 P/F: in position mild steel, reinforcement bars of minimum 40000 PSI yield strength, of any size and
diameter i/c straightening, bending, placing, binding in position and binding wire, spacer, wastage
etc. Steel required for RCC works be designed & submitted well before by the contractor from
approved designer or reputed structure designer. Complete in all respect as per specification and
instruction of Engineer incharge.

R.C.C 1:2:4 (item No.C-5) 1104.89 x 7.35/2204 = 3.68 M.T


Total = 3.68 M.T

C-8 P/L: 1st class BB masonry in superstructure in any thickness of wall. Set in 1:6 cement sand mortar
i/c racking out the joints where necessary, Scaffolding, making grooves and corners where required
& curing etc. Complete as per specification and instruction of Engineer Incharge.

2 53.75 0.75 11.00 = 886.88 Cft


4 16.00 0.75 11.00 = 528.00 Cft
2 5.00 0.75 11.00 = 82.50 Cft
1 5.00 0.38 11.00 = 20.63 Cft
Total-A 1518.01 Cft
Deduction
1 6.00 0.75 5.50 = 24.75 Cft
4 5.00 0.75 5.50 = 82.50 Cft
1 4.00 0.75 8.50 = 25.50 Cft
3 3.50 0.75 7.00 = 55.13 Cft
2 2.50 0.75 7.00 = 26.25 Cft
Total D/d = 214.13 Cft
Net B.B 1518.01 ( - ) 214.13 = 1303.88 Cft

C-9 Earth filing: under floors with earth brought from out side approved source i/c all leads & lifts, filling
in layers not more than 6" thick, consolidating upto specified density and to the satisfaction of
Engineer incharge.

1 20.00 16.00 1.50 = 480.00 Cft


1 15.00 16.00 1.50 = 360.00 Cft
1 15.75 16.00 1.50 = 378.00 Cft
Total = 1218.00 Cft

C-10 P/F: clean course sand under floors from an approved source i/c leveling, watering, compacting etc.
Complete in all respect as per specification and instruction of Engineer incharge

1 20.00 16.00 0.50 = 160.00 Cft


1 15.00 16.00 0.50 = 120.00 Cft
1 15.50 16.00 0.50 = 124.00 Cft
Total = 404.00 Cft

C-11 P/L: mosaic floors consisting of 1½" thick PCC 1:2:4 divided into panels not morethan 3'x3' with 3/8"
thick marble strip and 1/2" thick mosaic topping (1 part of grey cement & 3 parts of approved colour
and size marble chips i/c curing, grinding, rubbing and polishing etc. Complete as per specification
and instruction of Engineer incharge.

1 20.00 16.00 = 320.00 Sft


1 15.00 16.00 = 240.00 Sft
1 15.75 16.00 = 252.00 Sft
3 3.50 0.75 = 7.88 Sft
2 2.50 0.75 = 3.75 Sft
1 4.00 0.75 = 3.00 Sft
Total = 826.63 Sft

C-12 P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick cement plaster in 1:3 ratio, (1 part of gray
cement and three parts of approved colour and size marble chips i/c grinding, rubbing, curing and
wax polishing etc. Complete as per specification and instruction of Engineer incharge.

1 20.00 4.00 = 80.00 Sft


Total = 80.00 Sft
C-13 P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar i/c scaffolding, chamfering of edges,
rounding the corners, making grooves and edges where required, P/F: of expended metal jali,
1/2"x1/2" size, 1' wide at all joints of RCC & bricks & curing etc. Complete as per specification and
instruction of Engineer Incharge.
2 20.00 11.00 = 440.00 Sft
2 16.00 11.00 = 352.00 Sft
1 20.00 16.00 = 320.00 Sft
2 15.00 11.00 = 330.00 Sft
2 16.00 11.00 = 352.00 Sft
1 16.00 15.00 = 240.00 Sft
2 10.00 11.00 = 220.00 Sft
4 10.00 11.00 = 440.00 Sft
1 10.00 10.00 = 100.00 Sft
2 10.00 11.00 = 220.00 Sft
1 10.00 5.50 = 55.00 Sft
1 20.00 7.00 = 140.00 Sft
1 16.75 11.00 = 184.25 Sft
1 16.75 5.75 = 96.31 Sft
2 53.75 11.00 = 1182.50 Sft
2 17.50 11.00 = 385.00 Sft
Total-A 5057.06 Sft
Deduction
3 3.50 7.00 = 73.50 Sft
1 4.00 7.00 = 28.00 Sft
4 5.00 5.50 = 110.00 Sft
1 6.00 5.50 = 33.00 Sft
Total-B = 244.50 Sft

Net Plaster (A - B) 5057.06 ( - ) 244.50 = 4812.56 Sft

C-14 P/A: deep struck pointing in cement/surkhi mortar in 1:1 with approved colour i/c racking out the
joints not less than 1/2" deep, saturating the surface, scaffolding & curing etc. Complete in all
respect as per specification and instruction of Engineer incharge.

2 53.75 11.00 = 1182.50 Sft


2 17.50 11.00 = 385.00 Sft
Total = 1567.50 Sft

C-15 P/F: of 1st class 1½" thick paneled door with 2½"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1½" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
3 3.50 8.50 = 89.25 Sft
2 2.50 7.00 = 35.00 Sft
Total = 158.25 Sft
C-16 P/F: 1½" thick glazed windows/csw with 4"x1½" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1½"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.

1 6.00 5.50 = 33.00 Sft


4 5.00 5.50 = 110.00 Sft
2 3.00 2.00 = 12.00 Sft
Total = 155.00 Sft

C-17 P/A: 3 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.

As per item No.C-12 = 4812.56 Sft


Total = 4812.56 Sft

C-18
P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps and 3 coats of synthetic enamel paint.
complete in all respect as per specification and instruction of Engineer incharge.

5 x 15.00 = 75.00 Rft

C-19 S/F: of 1½" thick D/Wood joinery as in wire gauze door without chowkat i/c all iron mongery and
hardware such as hinges, handle, holdfast, door spring and tower bolts etc. as approved, 12x24
wire mesh and 3 coats of S/E paint. Complete in all respect as per specification and instruction of
E/Incharge.
1 4.00 8.50 = 34.00 Sft
1 3.50 8.50 = 29.75 Sft
Total = 63.75 Sft

C-20 P/L: PCC 1:3:6 as in plinth protection, around the building over compacted earth or where required
i/c framework, placing, curing, leveling, compacting and finishing etc. Complete in all respect as per
specification and instruction of Engineer Incharge.

2 59.75 3.00 0.33 = 118.31 Cft


2 17.50 3.00 0.33 = 34.65 Cft
Total = 152.96 Cft

C-21 P/L: roof treatment consisting of:-


a) 2 coats of hot bitumen with sand blinding.
b) 2 layers of approved polythene sheet.
c) 4" thick compacted earth with proper slope.
d) 1½" thick brick tiles in 1:6, grouting in 1:3 and flush pointing in 1:1
Complete as per specification and instruction of Engineer Incharge.

1 52.25 16.00 = 836.00 Sft


Total = 836.00 Sft
INTERNAL ELECTRIFICATION

E-1 Wiring of light or fan point from point to switch with 2x3/.029 Pakistan cable i/c sub circuit wiring
with 7/.029 Pakistan cable, with all accessories such as PVC concealed conduit PPI switches
(premier) fixed on plastic sheets & wooden box, ceiling rose and holder etc. Complete as per
instruction of Engineer Incharge.

20 Nos

E-2 Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3 pin 15 Amp. power plug i/c P/F: of 15
Amp. switch socket unit PPI (China clay base) fixed on wooden box on separate circuit. Complete
as per instruction of Engineer Incharge.

5 Nos

E-3 P/F: 4' long tube light (Asia/M. Inayatullah made) with starter, tube rod (Phillips) and choke.
Complete as per specification and instruction of Engineer Incharge.

12 Nos

E-4 P/F: of 56" sweep capacitor type ceiling fan with dimmer, (Pak Fan Delux) i/c suspension rod and
canopy etc. Complete as per instruction of Engineer Incharge.

6 Nos

E-5 Same as item # E-1, but wiring of 5 pin 5 Amp. light plug away from switch board i/c P/F: of PPI
(premier) light plug i/c wiring with 7/.029 etc. Complete as per instruction of Engineer Incharge.

6 Nos

E-6 Providing and Fixing of main board having:-


1 No

E-7 P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of approved quality i/c connection from
nearest source to main board.

E-8 P/Fixing: 12" Sweep (Pak) Exhaust fan with louver. Complete in all respect as per specification and
instruction of Engineer incharge.

2 Nos.

E-9 Earthing of main switch with 8 SWG copper wire, laid in 1/2" dia GI pipe from main switch to 2'x2'
copper plate burried in 14 feet deep pit alongwith salt & charcoal mixture. Complete in all respect as
per specification and instruction of Engineer incharge.

1 No.
WATER SUPPLY & SANITARY INSTALLATION

W-1 P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master" Tanki,
P/Trap, Stop Cock, Plastic Connection & Hockey Pipe etc. Complete as
per specification and instruction of Engineer Incharge.

1 No.

W-2 P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.

1 No.

W-3 P/F: CP adjustable shower rose i/c stop cock and CP inlet pipe etc.
Complete as per instruction of Engineer Incharge.

1 No.

W-4 P/F: Brass bib cock ½" dia screw down type Faisal or equivalent make.
Complete as per instruction of Engineer Incharge.

2 Nos.

W-5 P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend,
caulking the joints with cement, painting to pipe, making holes and
repair to original shape. Complete in all respect.

4" dia CI pipe. 1 30.00 = 30.00 Rft

2" dia CI pipe. 1 18.00 = 18.00 Rft

W-6 S/L: jointing and testing of ½" dia GI pipe (IIL-L) i/c tees, bends, union,
elbows, socket etc. Making hole and repair complete.

80.00 Rft

W-7 P/F: 3" floor trap of CI i/c CP grating, caulking the joints with cement
and hole repair complete.

2 Nos.

W-8 Providing and Fixing of best quality 24" long towel rail. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-9 Providing and Fixing of best quality Plastic soap dish. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-10 Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-11 P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made. Complete as per
specification and instruction of E/Incharge.

2 Nos.

W-12 Construction of septic tank of BB size, 8'x4'x6' with 9" thick BB wall, 4½" thick BB
partition, 1/2" thick cement plaster in 1:4 and 6" thick PCC 1:3:6 in foundation and
bed, 4" thick RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both way. Complete
as per instruction of Engineer Incharge.

1 No.

W-13 Construction of 6' internal dia 30' deep soakage pit i/c 9" thick BB in 1:4 from top to 6'
depth, filling of pit with stone boulder, making chemny and RCC 1:2:4 cover 4" thick
with 1/2" dia bars 4" C/C both way. Complete in all respect as per specification and
instruction of Engineer incharge.

1 No.

W-14 P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar, excavation
of trench & re-filling after laying of pipe. Complete as per specification
and instruction of Engineer Incharge.

40.00 Rft

W-15 Construction of 2'x2' or 2' dia BB manhole, upto required depth i/c 4"
PCC 1:4:8 in bed, BB wall laid & plastered in 1:4 making channel inside
and RCC 1:2:4 cover, 4" thick with 3/8" dia bars 4" C/C both side.
Complete as per instruction of Engineer Incharge.

4 Nos.

W-16 S/F: of polythene water tank 500 gallons

1 No.