BEAM SCHEDULE SLAB SCHEDULE

SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS TYPE THICKNESS STEEL ALONG SPAN STEEL ACROSS SPAN REMARKS
BEAM
SFR REMARKS
NUMBERS T8 @ 125 C/C ALT BENT UP T8 @ 175 C/C ALT BENT UP SUNK BY 100MM
B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT S1 140

B1 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@200 2L-T8@150 2-T10EF T10 @ 100 C/C ALT BENT UP T8 @ 200 C/C DIST. -
+ - S2 150
3-T16
PROVIDE 1T16 EXTRA BETWEEN TWO BENT UP
B2 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@150 2L-T8@150 2-T10EF S3 250 T16 @ 125 C/C ALT BENT UP T10 @ 250 C/C DIST. BARS @ DISCONTINUOUS END FOR MIN.DIST.L/4,
+ + -
3-T16 3-T16 PROVIDE T8@ 300 C/C @ TOP BOTHWAYS AS
SKIN REINFORCEMENT
B3 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ +
3-T16 3-T16 -
S4,S6 150 T10 @ 150 C/C ALT BENT UP T8 @ 200 C/C DIST.
B4 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + -
3-T16 3-T20 S5 150 T10 @ 125 C/C ALT BENT UP T8 @ 200 C/C DIST.
2L-T10@175 2L-T10@125 T10 @ 150 C/C @ TOP EVERY ALT BAR BENT T10 @ 225 C/C DIST. CANTILEVER
B5 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2-T10EF - S7 275 BACK ALONG BOTTOM
+ + @ TOP & BOTTOM
3-T20 3-T16
T12 @ 150 C/C @ TOP EVERY ALT BAR BENT T10 @ 225 C/C DIST. CANTILEVER
B6 300 900 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF S8 275 BACK ALONG BOTTOM @ TOP & BOTTOM
3-T25 3-T25 3-T25 + + -
3-T16 3-T16 T10 @ 150 C/C @ TOP EVERY ALT BAR BENT T10 @ 225 C/C DIST. CANTILEVER
S9 150 BACK ALONG BOTTOM @ TOP & BOTTOM
B7 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ +
3-T16 3-T16 -
S10 150 T10 @ 150 C/C ALT BENT UP T10 @ 150 C/C ALT BENT UP
SIGNATURE OF ARCHITECT ON RECORD:- SIGNATURE & STAMP OF JW CONSULTANTS LLP:-
B8 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + -
3-T16 3-T16 S11 150 T8 @ 150 C/C ALL STRAIGHT T8 @ 200 C/C DIST.

B9 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@200 2L-T8@150 2-T10EF - PROVIDE SCISSOR JOINT AT RESP. UPPER
+ ST1,ST3 250 T16 @ 125 C/C ALT BENT UP T10 @ 250 C/C DIST.
3-T16 LANDING
B10 230 900 2-T16 2-T16 2-T16 2-T16 2-T16 2-T16 2L-T8@150 2L-T8@150 2L-T8@150 2-T10EF T10 @ 150 C/C ALT BENT UP T10 @ 250 C/C DIST. -
+ + + + + - ST2 250
2-T16 2-T16 2-T16 2-T20 2-T20
-
PROVIDE SCISSOR JOINT AT RESP. UPPER
B11 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@200 2L-T8@150 2-T10EF AST1,AST3 250 T16 @ 125 C/C ALT BENT UP T10 @ 250 C/C DIST.
+ + - LANDING
3-T12 3-T20 -
AST2 250 T10 @ 150 C/C ALT BENT UP T10 @ 250 C/C DIST. DRAWING IS VALID FOR DESIGN ADE UACY,
B12 230 SLAB 3-T12 3-T12 3-T12 2-T12 2-T12 2-T12 2L-T8@150 2L-T8@150 2L-T8@150 - HIDDEN BEAM PROVIDED IT IS SIGNED & STAMPED BY OUR OFFICE
THK
B13 300 900 3-T16
+
3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@200 2L-T8@150 2-T10EF - NOTES:
2-T16
1. Basic reference codes:
B14 300 750 3-T20 3-T20 3-T20 3-T20 3-T20 3-T20 2L-T10@125 2L-T10@150 2L-T10@125 2-T10EF -
+ + + + + IS456: 2000, IS1893(Part1): 2016, IS13920: 2016.
3-T16 3-T16 3-T16 3-T20 2-T20
2. Due care shall be taken to ascertain that requisite strength of concrete is gained
B14M 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@100 2L-T8@100 2L-T8@100 2-T10EF @ MIDLANDING LVL
+ + + + + before commencement of deshuttering. It shall comply with provisions of
3-T16 3-T16 3-T16 3-T20 2-T20
Clause No. 11.3 of IS 456: 2000.
B15 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + + 3. Nominal covers Mild Moderate Severe
3-T16 3-T20 3-T25
I Footings 50 50 50
B16 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + + + + +
3-T16 3-T16 3-T16 3-T25 3-T25 3-T25 II Columns & walls >200mm width 40 40 45
(to links of column)
B17 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF -
+ + + III Columns & walls with width of 200mm & below 40 40 45
3-T16 3-T16 3-T16
having reinf. of dia. 16mm & above.
B18 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF - (to links of column)
+ +
3-T16 3-T16
IV Columns & walls with width of 200mm & below 25 30 45
B19 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF - having reinf. of dia. 12mm.
+ +
3-T16 3-T16 (to links of column)
B20 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF - V Slabs 20 30 45
+ +
3-T16 3-T16
VI Beams 20 30 45
B21 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF - (to stirrups of beam)
+ +
3-T16 3-T16
VII Lift walls 40 40 45
B22 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + For main reinf. up to 12mm dia. bar for mild exposure the nominal cover
3-T16 3-T16
may be reduced by 5mm for slabs & beams only.
B23 300 900 3-T25 3-T25 3-T25 3-T16 3-T16 3-T16 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF -
+ + 4. Beams with depth more than 750mm, provide side-face reinforcement.
3-T16 3-T16
5. Substratum shall be approved from our office before laying P.C.C.
B24 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@200 2L-T8@150 2-T10EF -
+ 6. Minimum clear spacing between any two longitudinal bars in beam= 50mm.
3-T16
7. All laps (Ld) shall be staggered & not more than 50% bars to be lapped
B25 300 900 4-T25 4-T25 4-T25 4-T25 4-T25 4-T25 4L-T12@125 4L-T12@125 4L-T12@125 2-T10EF CANTILEVER
+ + + at any given section.
4-T25 4-T25 4-T25

B26 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF GRADE OF REINF. M20 M25 M30 M35 M40 & ABOVE
+ + + -
3-T16 3-T16 3-T16
Fe415 48 X D 41 X D 38 X D 34 X D 30 X D
B27 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF - Fe500 (TMT) 57 X D 49 X D 46 X D 40 X D 36 X D
+ + +
3-T16 3-T16 3-T16
For bundled bars, Ld shall be increased by 10% for 2 bars in contact,
B28 300 900 3-T16 3-T16 3-T16 3-T12 3-T12 3-T12 2L-T8@200 2L-T8@200 2L-T8@200 2-T10EF - 20% for 3 bars in contact and 33% for 4 bars in contact.
8. All buildings shall have tie beams/plinth beams at ground/plinth level.
B29 300 900 3-T20
+
3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF - SINGLE SPAN FRAME BEAM 9. If footings overlap with each other, necessary revision shall be obtained from our office.
3-T16
10. Design is valid for number of floors as indicated in the drawing.
B30 300 900 3-T16 3-T16 3-T16 3-T20 3-T20 3-T20 2L-T10@150 2L-T10@150 2L-T10@150 2-T10EF CANTILEVER 11. At any level where column size gets reduced in either dimension
tie beams/plinth beams are essential.
B31 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF -
+ + 12. For cantilevers, top bars to be anchored behind from external face of support for - Ld or
3-T16 3-T16
span of cantilever - whichever is greater.
B32 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T10@200 2L-T10@200 2L-T10@200 2-T10EF TOP FLUSH WITH TOP
+ + 13. Fire rating considered:- 2 Hour.
3-T12 3-T16 OF SUNK SLAB
Use of this drawing for construction shall explicitly confirm acceptance of following conditions
B33 300 900 3-T25 3-T25 3-T25 3-T25 3-T25 3-T25 2L-T12@100 2L-T12@100 2L-T12@100 2-T10EF CANTILEVER by Owner / Builder / Contractor
+ + +
3-T25 3-T25 3-T25 1. Our responsibility shall remain limited to safe and sound structural design as transmitted by this drawing.
B34 300 900 3-T16 3-T16 3-T16 3-T25 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF 2. This drawing shall not be used for any construction unless necessary statutory approvals are obtained by the
+ + + -
3-T16 3-T25 3-T16 Owner / Builder / Architect from the Regulating Authorities. JW CONSULTANTS LLP are indemnified of any
legal consequences in case of unauthorised construction.
B35 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF @ MIDLANDING LVL 3. We shall not remain responsible for -
+ +
3-T16 3-T16 a) Safety of old structure during demolition.
B36----------------------------------------------------=>DELETED b) Safety of any adjoining building /persons staying in adjoining building/persons
and properties on adjoining roads.
c) Safety of construction worker/any personnel at work site during construction
B37 300 900 3-T25 3-T25 3-T25 3-T20 3-T20 3-T20 2L-T10@125 2L-T10@175 2L-T10@125 2-T10EF - d) Correctness/safety of any temporary structure, scaffolding, shuttering, centering erected at site and
+ + +
3-T16 3-T16 3-T32 any injury to any personnel arising out of any accidents.
e) Accidents occurring due to premature deshuttering, faulty / substandard construction material or
B38 300 900 3-T25 3-T25 3-T25 3-T25 3-T25 3-T25 2L-T12@100 2L-T12@100 2L-T12@100 2-T10EF CANTILEVER
+ + + workmanship / faulty construction procedure.
3-T20 3-T20 3-T20
f) Any accident occurring due to construction of elements of buildings not designed by us.
B39 300 900 3-T25 3-T25 3-T25 3-T20 3-T20 3-T20 2L-T12@150 2L-T12@200 2L-T12@150 2-T10EF - 4. Supervision if specifically asked for will be provided to the extent of verification of reinforcement on site
+ + +
3-T16 3-T25 3-T25 but responsibility regarding correct & sound construction shall solely rest with contractor/ builder / owner.
B40 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@150 2L-T10@150 2-T10EF - SECONDRY BEAM 5. All structural concrete should be weigh batched, machine mixed and mechanically vibrated.
6. Any discrepancy between our drawing & Architects' drawing shall be brought to our notice before construction.
7. This drawing is property of JW CONSULTANTS LLP and shall not be reproduced or used
B41 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@150 2L-T8@150 2-T10EF - without explicit permission of this office.

2L-T12@200 2L-T12@150
DRAWING TO BE VALIDATED BY ARCHITECT ON RECORD AFTER CHECKING COMPLIANCE
B42 300 900 3-T25 3-T25 3-T25 3-T25 3-T25 3-T25 2L-T12@150 2-T10EF -
WITH APPROVED PLANS FROM THE REGULATING LOCAL GOVERNMENT AUTHORITY.

B43 300 900 3-T20 3-T20 3-T20 3-T25 3-T25 3-T25 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF -
NO. REV. DATE DESCRIPTION NO. REV. DATE DESCRIPTION
B44 300 900 3-T25 3-T25 3-T25 3-T20 3-T20 3-T20 2L-T12@150 2L-T12@200 2L-T12@150 2-T10EF -
+ + +
3-T20 3-T25 3-T25
R0 11.04.2019 FOR APPROVAL R5 . .
B45 300 900 3-T25 3-T25 3-T25 3-T20 3-T20 3-T20 2L-T10@150 2L-T10@200 2L-T10@150 2-T10EF -
+ +
3-T25 3-T20 R1 . . R6 . .
B46 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@125 2L-T8@150 2L-T8@125 2-T10EF -
+ + + R2 . . R7 . .
3-T16 3-T25 3-T25

B47 300 900 3-T20 3-T20 3-T20 3-T16 3-T16 3-T16 2L-T10@150 2L-T10@175 2L-T10@150 2-T10EF - R3 . . R8 . .
+ + + + +
2-T20 2-T20 2-T20 3-T25 3-T25
B48 300 900 3-T16 3-T16 3-T16 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@150 2L-T8@150 2-T10EF
R4 . . R9 . .
-

BR,BR1,BR2 300 275 3-T12 3-T12 3-T12 3-T16 3-T16 3-T16 2L-T8@150 2L-T8@150 2L-T8@150 - CANTILEVER
ENVIRONMENTAL GRADE OF CONCRETE :- M35
EXPOSURE CONDITION :- MILD
DESIGN LIVE LOAD :- 10.0 KN/SQ.M. GRADE OF STEEL :- Fe 500 TMT
(UNLESS SPECIFIED)

SUPERIMPOSED 4.0 KN/SQ.M. S.B.C. :- NA


DEAD LOAD :-

BEAM WITH ADJOINING CANTILEVER ONE SIDE CHECKED BY DEALT BY DRAWN BY DRG. NO. BLDG: JOB NO.
N.R.P. A.G.M. K.L.S. 150063-312 CIVIL GODOWN 150063

DEVELOPER:-
SEZ-BIOTECH SERVICES PVT. LTD.

DESIGN ARCHITECT:-
-
ARCHITECT ON RECORD:-
-

PROJECT:-
POONAWALA BIOTECHNOLOGY PARK SEZ,
AT MANJARI, PUNE
TITLE:-
SCHEDULE FOR RCC FIRST FLOOR SLAB

LLP IDENTITY NO.: AAA-2650 PUNE OFFICE

SECTION A-A SECTION B-B PARTNERSHIP WITH LIMITED LIABILITY


SAI RADHE,OFFICE NO 201,2ND FL.,100 KENNEDY ROAD,
BEHIND HOTEL SHERATON GRAND, PUNE - 411001.
Tel. +91 20 66449100
TYPICAL STIRRUP MUMBAI OFFICE
RUPAREL IRIS, 2ND FLOOR, NEAR MAGNET MAII, TULSI

TYPICAL DETAILS OF BEAM REIN.RESTING ON BEAM @ BOTH END JW CONSULTANTS LLP PIPE ROAD, MATUNGA - W , MUMBAI - 400016.