BILL OF QUANTITIES

PROJECT: WAGYU MAFIA


DATE: February 13, 2020
ITEM DESCRIPTION UNIT QUANTITY

PRELIMINARIES

A Overhead Cost item 1

B Tremp Facil item 1

C Hauling item 1

D Temp Power aqnd lighting item 1


TOTAL PRELIMINARIES
ARCHITECTURAL WORKS

Wall Finish lot 1


ceiling Finishes lot 1
Floor finishes lot 1
Doors and Caseworks lot 1
Signages lot

ELECTRICAL WORKS

Electrical Rough-ins, wiring and consumables, ang installation lot 1

PLUMBING WORKS

Piping and consumables, and installation lot 1

MECHANIVAL WORKS

Fresh Air and Exhaust lot 1


Aircon and Ducting lot 1
Fire Protection lot 1
Gasline lot 1
UNIT RATE
UNIT RATE AMOUNT
MATERIALS LABOR OTHERS

170,000.00 170,000.00 170,000.00

50, 000.00 50,000.00 50,000.00

35, 000.00 35, 000.00 35,000.00

15, 000.00 150,000 15,000.00


270,000.00

300,00.00 90,000.00 390.000.00 390.000.00


250,000.00 75,000.00 325,000.00 325,000.00
210,000.00 63,000.00 273,000.00 273,000.00
65,000.00 19,500.00 84,500 84,500
105,000.00 10,500.00 45,500.00 45,500.00

522,000.00 208,800.00 730,800.00 730,800.00

357,000.00 142,800.00 499,800.00 499,800.00

275,000.00 110,000.00 385,000.00 385,000.00


339,000.00 135,600.00 474,600.00 474,000.00
189,000.00 56,700.00 245,700.00 245,700.00
85,000.00 25,500.00 110,500.00 110,500.00

3,564,400.00
TOTAL TO SUMMARY OF BID 3,834,400.00