Sie sind auf Seite 1von 1

Sheet1

Subject: MECHANICAL WORKS QUERY


Project: Triumph Elite
Location: Antonio S. Arnaiz Ave, Pasay City
Date: 03/28/19

Item Queries / Details Response


All AC equipment, Fans and Blower (Valves & access.) is
1)
this OSM or Not?

2) Please provide Kitchen Exhaust equipment schedule.

- Is it required to have fire dampers each and every duct


3)
passing and penetrating thru wall? Please confirm.

- Is it required to have Turning Vanes for every duct


4)
elbow? Please confirm.
- Is Concrete Pads included and under the mechanical
5)
scope? Please confirm
- Vibration Isolator What type? Is it sprint or rubber?
6)
please confirm
Electrical works for every equipments |( Circuit Breaker,
Control Panel, Tapping Point)
7)
- Is
it included?, is there any possible agreed distance that
wiring may travel? e.g location of tapping point
- Interlocking connection between Stairwell Pressurization
8) are falls under on what scope of works? Please confirm, if
yes – agreed distance of hard wire may travel.

- Is Condensate Drain Pipe under mechanical scope?


9)
Agreed distance and location of the nearest tapping point.
Acoustical Wall and the likes ( Acoustic louver, acoustic
duct liner, etc.)
10)
- Is this under
mechanical scope? Please verify and confirm
On schematic diagram, there is a smoke evacuation
layout. However on plans, there is no reflected smoke
11) evacuation layout on each floor. Please provide location of
Smoke evac grille, exhaust air duct riser, length of
exhaust air duct, and motorized dampers.
Wiring for each equipment, for smoke evacuation from
motorized damper to digital direct controller, is it under
12)
mechanical scope? If yes, please provide the assume
length
Do Pressurized air grille have volume dampers / opposed
13)
blade volume damper? If so, please provide size.
Is there any revisions on Mechanical plans? If so, please
14)
kindly provide.

Page 1