A FOUNDATION RE-BAR SCHEDULE 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE A
NOTED AND COORDINATES ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.
2. FINISHED GROUND LEVEL (FGL) = EL.+4,500mm
MARK MF1 MF2 FINISHED GROUND FLOOR LEVEL(FGFL) = EL.+4,800mm
3. CONCRETE STRENGTH
SIZE 4,000 X 14,000 X 400 3,000 X 13,000 X 400 1) f’c=30.0MPa : ALL BUILDINGS AND THEIR FOUNDATIONS, STACKS
AND ASH SILOS (INCLUDING FOUNDATION)
B 2) f'c=24.0MPa : OTHER FOUNDATION
GRID 3) f’c=13.8MPa : PLAIN CONCRETE FOR ENCASEMENTS, THRUST
B BLOCKS, ELECTRICAL DUCTS, LEAN CONCRETE BACKFILL, B
4,000 3,000 AND SIMILAR WHERE, f’c=CYLINDER COMPRESSIVE STRENGTH
AT 28 DAY
2,000 2,000 1,500 1,500 4. REINFORECING BAR STRENGTH
1) ROUND BARS
GRADE SR295, fy=300 MPa
2) DEFORMED BAR
GRADE SD390, fy=400MPa
3) MESH REINFORCEMENT
GRADE SD490, fy=500MPa
5. CEMENT
2,000
1,500
PORTLAND BLAST FURNACE CEMENT OR EQUIVALENT ALONG
WITH WATERPROOFING COMPOUND SHALL BE USED.
6. CONCRETE COVER (CAST-IN-PLACE CONCRETE)
5,000
E E
8. FOR THE FOLLOWING ITEMS, SEE STANDARD DRAWINGS UNLESS
NOTED OTHERWISE.
- MINIMUM CONCRETE COVER
- HOOK, DEVELOPMENT AND SPLICES OF REBAR
9. MEMBERS WITHOUT DIMENSION
D16@200 (TOP) : SYMMETRICAL WITH RESPECT TO CENTER LINE
D20@200 (BOT.) D16@200 (TOP)
D20@200 (BOT.)
F F
14,000
13,000
2 2
SHAPE REFERENCE DOCUMENTS/DRAWINGS
DOC/DWG NO. TITLE
5,000
H H
FOR INFORMATION
THIS DRAWING IS THE PROPERTY OF DOOSAN HEAVY INDUSTRIES VIETNAM.
IT IS NOT TO BE COPIED OR USED IN ANY WAY DETRIMENTAL TO THE COMPANY.
Project
3 3
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
Owner
1,500
2,000
K K
Owner's Engineer
Contractor
400
DRAWING TITLE
A1 (841 x 594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16