NUMBER: SDH/01
DATE:: 06.02.2019
To: M/S Société des Huiles et Dérivés, Lebanon PROJECT: Fire Protection
Attention: Mr. Fadi Merhej Design and Follow Up
Description:
The project consists of an existing operational industrial compound extending over a plot around
50’000m² with multiple structures, for the purpose of edible oil extraction along with the production of
dried soybean based animal feed.
Large silos, warehouse, tanks are also integrated within the compound for the storage of raw material
and finished goods.
Security booth.
Administration Building.
o Ground Floor Level, Area 260 m².
o First Floor Level, Area 220 m²
o Second Floor Level, Area 220 m²
Warehouse A, Area 4880 m².
Warehouse B & C, Area 2200 m².
Warehouse D
o Ground Floor Level, Area 1700 m².
o First Floor Level, Area 2200 m²
Boiler room, Area 440 m².
Generator Plant Room, Area 170 m².
Electrical Substation Plant, Area 230 m².
Research laboratory and Store, Area 530 m².
Workshop and Water Tank, Area 490 m².
Pretreatment Building.
o Basement Floor Level, Area 520 m².
o First Floor Level, Area 520 m²
o Second Floor Level, Area 400 m²
o Third Floor Level, Area 80 m².
Solvent Extraction Plant Building.
o Basement Floor Level, Area 390 m².
o Ground Floor Level, Area 390 m².
o First Floor Level, Area 180 m²
o Second Floor Level, Area 210 m²
o Third Floor Level, Area 210 m².
o Fourth Floor Level, Area 210 m².
o Fifth Floor Level, Area 180 m².
Refinery Building.
o Ground Floor Level, Area 960 m².
o First Floor Level, Area 960 m²
o Second Floor Level, Area 960 m²
o Third Floor Level, Area 500 m².
o Fourth Floor Level, Area 200 m².
Assess the various hazards and risks in the manufacturing handling and storing process.
Ensure the protection of personnel, various goods and equipment on the premises.
Propose the adequate fire protection measures.
Elaborate the necessary fire detection systems.
Assess the existing Electrical Earthing systems for static electricity protection.
Scope of Work:
1. Pre‐study phase:
2. Concept phase:
3. Development phase:
5. Execution Phase:
7. All design shall be based to BSRIA Document BG6/2012, Design Framework of Building Services,
Concept Phase shall be C1, C2 & C3.
Schematic Phase Shall be C4, C5 & C6.
Detailed Design Phase Shall be C7, C8.
Deliverables:
EMB & Associates will complete the Services in 120 calendar days, however commencing on the date
shall be upon first downpayment.
Calculation:
Fire protection water tank capacity.
Fire pump capacity
Hydraulic calculation of the firefighting network.
Drawings:
Administration Building.
o Ground Floor Level, Fire detection layout
o First Floor Level, Fire detection layout
o Second Floor Level, Fire detection layout
Warehouse A
o Warehouse A, Fire detection layout
o Warehouse A, Fire Fighting layout(Hose Reel/Hydrants/PFE)
Warehouse B&C
o Warehouse B & C, Fire detection layout
o Warehouse B & C, Fire Hydrant layout (Hose Reel/Hydrants/PFE)
Warehouse D
o Ground Floor Level, Fire detection layout
o First Floor Level, Fire detection layout
o Ground Floor Level, Fire Fighting layout (Hose Reel/Hydrants/PFE)
o First Floor Level, Fire Fighting layout (Hose Reel/Hydrants/PFE)
Boiler room,
o Boiler room, Fire detection layout
o Boiler room, Fire Fighting layout (Hose Reel/Hydrants/PFE)
Pretreatment Building.
o Basement Floor Level Fire Fighting Layout (Hose Reel/Hydrants/PFE)
o First Floor Level, Fire Fighting Layout (Hose Reel/Hydrants/PFE)
o Second Floor Level Fire Fighting Layout (Hose Reel/Hydrants/PFE)
o Third Floor Level Fire Fighting Layout (Hose Reel/Hydrants/PFE)
o Basement Floor Level Fire Detection Layout
Solvent Extraction Plant Building. Fire Detection and Deluge Sprinkler System Layout
o Basement Floor Level, Fire Detection Layout
o Ground Floor Level, Fire Detection Layout
o First Floor Level, Fire Detection Layout
o Second Floor Level, Fire Detection Layout
o Third Floor Level, Fire Detection Layout
o Fourth Floor Level, Fire Detection Layout
o Fifth Floor Level, Fire Detection Layout
Documents:
Design Report
MEP Bill of Quantities
MEP Specifications.
Panelboards schedule
Deliverables Format:
Fees:
Design Phase that includes the pre-study, Concept and development phase:
Fees: 55’000 USD ($) (Fifty Five thousand US dollars).
Downpayment: 20% of the Fees.
Pre-Study & Concept Phase: 35% of the Fees.
Detailed Design Phase: 45% of the fees
Execution Phase that includes the contract awarding, execution and handing over phase.
Fees: 40’000 USD ($) (Forty thousand US dollars).
Site supervision: 300 $ per site visit per engineer during the execution phase.
Exclusions:
The following items are not included in the services of EMB & Associates
a. Additional Services not indicated in this Agreement.
b. Revit 3D Model (if required).
c. All architectural as built drawings.
d. All industrial as built drawings.
e. All safety/technical issues related to the manufacturing process machinery.
f. Pipe stress analysis (contractor’s scope of work as per approved shop drawin gs).
g. Existing electrical installations.
h. Interface with existing systems.
i. Modifications in drawings of existing facility.
j. As built of existing items.
k. Major Changes, modifications or revisions made to the design by the Employer/ Representative
after submittal of each Design Stage.
l. Travel expenses and accommodation outside Lebanon. That includes 4 or 5 stars
accommodation for anyone of the traveling team.
m. Taxes and Levy
n. Sprinkler distribution layouts/calculation and automatic gas extinguishing systems for the
following in case required by regulations and approved client.
Administration Bldg
Warehouse A
Warehouse B&C
Warehouse D
Boiler room
Generator Plant Bldg
Substation Plant Bldg
Best Regards,
Elie Baradhy