Beruflich Dokumente
Kultur Dokumente
ESD
B4 B2
6" Flare Line
BO 1
Tag Description
B3 Rig BOP
N2
B5 HCR
N2 purge line N19 PT
402
N20 B6
Gas Vent line Kill line
N18
Fluid N5
N17
2" N21
Valve PT
S8 S7 102
PT
Check Valve
202
C6 C7
C1
N11 C2 C3
Control Valve Fluid
Relief Valve
N10 S14
Tank C8
Sample
C14
Pump S13 C13
S12 S16 C9
1-Transfer Pump:3m^3/min N9
C10 C12
2-Separator:16m^3 / 500 psi Poor Boy Degaser
NPU 2
3"
S15
N8 C11 G4 G5
FT AT S17 S18
805 805
S5
Filter
S4
3" 2"
3"
900 CFM Comp O8
350
O7 O9
S11
Shipping Tank
Tag Description
Rig BOP
HP N2
LP Air
Kill line
Gas Vent line
LP Fluid 2"
Fluid Vent Line High Pressure Booster 5000
psi
Booster
Med.
WB-12
HP Flow Line
Valve
Check Valve
ESD Valve
Booster
Med.
2500
4"
Control
panel
Separator
Filter
3" 2"
3"
900 CFM Comp
350
RCD
31
3m 10m
4m
(D/L)Cable
Spool
Rig Substructure
19
Pipes
2500 Booster
4 1
Rig Choke
3m Liquids Manifold
Tank 2 13 m
30
NPU 300psi18
300 NPU Separator
Pipes
4m
2m 3
17
3m
1m
Spare
Pipe Basket
Parts
16 15m
11
15
Fuel Tank
900 scfm 350 Comp
10 6
room
Lunch
4m Tool
5m House
9
14
900 scfm 350 Comp 2m
Command
12 3m Room Center
e
4m
Generator 3m Chang
5m 900 8 2m
350
7
Spare
13 .