Sie sind auf Seite 1von 3

THESIS 1

DEPARTMENT OF ELECTRONICS ENGINEERING


TA SK SHEET
Title : A UT O MA T IC L A WN MO WER : WIT H A UT O MA T IC WA ST E DISPO SA L SY ST EM: A
Mi c r o c o n t r o l l e r a n d G PS A i d e d De v i c e

Course Year and Section : BSECE-5C


Leader : Fajardo, April Joy D.
Members :
Bautista, Rhealyn Anne D. Serandon, Patrick Gerard A.
Esteban, Erickson R. Torrequimada, Sharmaine B.
Santos, Adrian B.

Student's Adviser's Thesis


Deadline of Date
No. Document Requirements Signature Signatur Instructor
submission Submitted
(Leader) e Remarks
Document Standard
Margins (L=1.5, R=1.0)
Text(Arial), Heading(14), Subheading(12)
Spacing (1.5) & Long size bondpaper
Header & Footer : BPSU Logo & MV
Preliminaries
Title
Approval Sheet
Dedications
Acknowledgement
Abstract
Table of Contents
List of Tables
List of Figures
THE PROBLEM AND BACKGROUND OF
I. THE STUDY 10/25/19
Introduction
a. Opening statement: existing
technology(comparison:limitations)
b. Main Area( specific technology to be
apply)
c. Relevant info/business
process/concept
Problem of the Study
a. Specific problem
b. General description of the
system/project
c. Goals of the project/ solutions to
improvements
d. significance
Objectives of the Study
a. Main objective
b. Specific objectives
c. Capabilities (#1 objective)
d. Evaluation of software(ISO)- #2
objective
e. Testing the effectiveness of the
system/project (parameters used for the
method of testing)
Scope and Delimitation of the Study
a. enumerate all the features/
capabilities of the system/study
b. Choose if field test or laboratory test
c. Enumerate all the limitations or not
included in the study
d. System Requirements and
Specifications including electrical,
chemical, physical specs, other technical
specs
e. Evaluation criteria used
Significance of the Study
a. Benefit of the study(market value /
project potential
b. Target user/ beneficiaries/ target
respondents
Notes
References: Published
Journals/website/ books/ e-books (min.
of 10 ref)
II CONCEPTUAL FRAMEWORK 11/8/19
Related Literatures
a. Related Theories/ principles( at least 5
sources: e-books,books, magazine:
approved facts/data)
b. Synopsis / synthesis( how it is being
applied to your study)
Related Studies
a. Related study/ projects publish in a
refereed journal, article, forums( at least
5)
b. Synopsis / synthesis( compare to your
study: enumerate similarities &
differences, how it help to your study)
Conceptual and Theoretical Framework
a. Diagram / model presented
b. explanation of each block
c. Explanation of the concept/ idea
Operational Definition of Terms
definitions based on how it is
used/work/ function in the
study/project
III. METHODOLOGY 11/22/19
Intro Paragraph : Type of research
methodology used( descriptive,
historical, experimental, etc.)
Determine the project specification
requirements
Project Design(System : Process Flow;
Software: Algorithm & Flow chart;
Hardware: Block diagram & schematic
diagram)
Implementation( Hardware: Prototype
and Physical model; Software: Source
code)
Testing procedures(unit, integration &
system testing):
1. Unit testing ( hardware testing;
software evaluation using ISO)
2. Integration Testing
3. System Testing( qualitative:
parameters used to test the
effectiveness of the system;
quantitative: survey questionaire and
method used to determine the # of
respondents)
4. Acceptance/ Performance Testing :
evaluation criteria or evaluation
procedure(present steps..)
Operation and maintenance procedure
IV. Technical Specification of the Study 11/29/19
Example: data sheets of the components

Note:
Deadline of submission of compilation of Chap.1, 2, 3 & 4 : December 6, 2019
Tentative Project Proposal Defense : December 7 & 8, 2018
Requirements:
Documents: Chapter 1, 2, 3 & 4
Working Prototype : at least 50% working

Deadline of submission of revised chap 1, 2, 3 & technical spec in softbound copy(Blue Cover) : December 13, 2019

Das könnte Ihnen auch gefallen