Retaining Wall Km 6.922 (Right Side) Cum 1 20.00 2.60 1.000 52.00
Retaining Wall Km 6.922 (Right Side) Cum 1 11.50 2.60 1.000 29.90
Retaining Wall Km 6.922 (Left Side) Cum 1 29.80 2.60 1.000 77.48
Retaining Wall Km 5.175 Cum 1 17.50 1.00 0.500 8.75
Retaining Wall Km 4.556 Cum 1 30.00 1.00 0.600 18.00
Retaining Wall Km 4.556 Cum 1 26.00 1.00 0.600 15.60
Head Wall Km 7.159 Cum 2 4.10 1.00 0.800 6.56
Slab Culvert Km 4.249 Cum 1 8.00 1.90 1.650 25.08
Slab Culvert Km 4.344 Cum 1 8.00 2.00 2.050 32.80
Cum Total Quantity :- 266.17
Cum Now Payable Quantity :- 266.17
KSRRB M2900- PCC M10 in Foundation KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40 m nominal size
44 34.1 mechanically mixed, placed in foundation and compacted by vibration including curing complete as per specifications MORTH Specification
No. 408
Retaining Wall Km 6.922 Cum 1 20.00 2.60 0.150 7.80
Retaining Wall Km 6.922 Cum 1 11.50 2.60 0.150 4.49
Retaining Wall Km 6.922 Cum 1 29.80 2.60 0.150 11.62
Retaining Wall Km 5.175 Cum 1 17.50 1.00 0.150 2.63
Retaining Wall Km 4.556 Cum 1 30.00 1.00 0.150 4.50
Retaining Wall Km 4.556 Cum 1 26.00 1.00 0.150 3.90
Head Wall Km 7.159 Cum 2 4.10 1.00 0.100 0.82
Slab Culvert Km 4.249 Cum 1 8.00 1.90 0.100 1.52
Slab Culvert Km 4.344 Cum 1 8.00 2.00 0.100 1.60
Cum Total Quantity :- 38.88
Cum Now Payable Quantity :- 27.24
ADDITIONAL ITEMS FOR MANGALORE CIRCLE - KSRRB M2300 - TMT Bar Reinforcement - KSRR M2300 - 14 Supplying, fitting
47 37.75 and placing TMT Bar reinforcement in Super - Structure complete as per drawing and technical specifications compete as per specification.
MORTH Specification No. 1600
Unit Dia in Total Length
No L
mm 8mm 10mm 12mm
Retainig Wall
Main Bar U Shaped M 160 12 10.95 1752.00
Main Bar U Shaped M 150 12 11.45 1717.50
Main Bar U Shaped M 90 12 4.15 373.50
Main Bar U Shaped M 281 12 4.75 1334.75
Distribution Bar M 42 10 33.50 1407.00
Distribution Bar M 44 10 31.80 1399.20
Distribution Bar M 18 10 18.70 336.60
Distribution Bar M 20 10 57.2 1144.00
Box Culvert
U bar M 40 12 4.8 192.00
U bar M 44 12 5.7 250.80
Top Raft Bar M 40 12 2.0 80.00
Top Raft Bar M 44 12 2.1 92.40
Wall Main Bar M 80 12 1.9 148.00
Wall Main Bar M 88 12 2.3 198.00
Wall Distribution Bar M 32 10 7.7 246.40
Wall Distribution Bar M 40 10 8.5 340.00
Slab Main Bar (Stirrups) M 40 12 3.9 155.20
M 44 12 4.2 183.92
Slab Distribution Bar M 20 10 7.6 152.00
Slab Distribution Bar M 20 10 8.4 168.00
Parapet Vertical Bar M 20 8 0.4 7.00
Parapet Vertical Bar M 22 8 0.4 7.70
Parapet Distrribution M 2 8 1.8 3.50
Parapet Distrribution M 2 8 2.1 4.14
Head Wall Parapet M 12 8 0.6 7.20
Total Length M 29.54 5193.20 6478.07
Unit Wt Kg/m 0.395 0.617 0.888
Total Wt Kg 11.67 3204.2 5752.53
Total Wt Kg 8968.40
MT Total Quantity :- 8.97
MT Now Payable Qty:- 8.97
ADDITIONAL ITEMS FOR MANGALORE CIRCLE - PIPE CULVERTS - KSRB M2200-5.9 Design mix M20 with OPC cement @
45 37.73 320Kgs, with 20mm and down size graded granite metal corse aggregetes @ 0.69 cum nd fine aggregates @ 0.46 cum, with superplastisiser
@ 3lts confirming to IS9130 - 1999 reaffirmed - 2008
Retaining Wall Km 6.922 Cum 1 20.00 2.50 + 0.60 4.000 + 4.000 124.00
2 2
Retaining Wall Km 6.922 Cum 1 11.50 2.50 + 0.60 4.000 + 4.000 71.30
2 2
Retaining Wall Km 5.175 Cum 1 17.50 0.90 + 0.30 1.500 + 1.500 15.75
2 2
Retaining Wall Km 4.556 Cum 1 30.00 0.90 + 0.30 1.700 + 1.700 30.60
2 2
Retaining Wall Km 4.556 Cum 1 26.00 0.90 + 0.30 1.500 + 1.700 24.96
2 2
Head Wall Km 7.159 Cum 2 4.00 0.90 + 0.45 2.200 + 1.800 10.80
2 2
Head Wall Parapet Km 7.159 Cum 2 2.50 0.25 + 0.25 0.500 + 0.500 0.63
2 2
Slab Culvert Km 4.249 Raft Cum 1 7.50 1.80 + 1.80 0.300 + 0.300 4.05
2 2
Wall Cum 2 7.50 0.30 + 0.30 1.000 + 1.000 4.50
2 2
Parapet Cum 2 1.80 0.20 + 0.20 0.450 + 0.450 0.32
2 2
Slab Culvert Km 4.344 Raft Cum 1 8.30 1.90 + 1.90 0.300 + 0.300 4.73
2 2
Wall Cum 2 8.30 0.30 + 0.30 1.350 + 1.350 6.72
2 2
Parapet Cum 2 1.90 0.20 + 0.20 0.450 + 0.450 0.34
2 2
Cum Total Quantity :- 298.70
Cum Now Payable Quantity :- 323.6462
"KSRRB M2100-15.1. “KSRRB M2100-14. Plain /Reinforcement Cement Concrete M20 with OPC cement @ 320kgs, with 20mm and down
size graded granite metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with superplastisiser @3lts confirming to IS9103-
9 27.26 1999 Reaffirmed-2008, in Open Foundation complete as per Drawing and Technical Specifications Case - I : Using Concrete Mixer” MORTH
Specification No. 1500,1700 & 2100
Retaining Wall Km 6.922 Cum 1 29.80 2.50 + 0.60 4.250 + 4.250 196.31
2 2
Cum Total Quantity :- 196.31
Cum Now Payable Quantity :- 171.3600
ADDITIONAL ITEMS FOR MANGALORE CIRCLE - Solid Slab Super Structure - KSRRB M2300-3.1 Furnishing and Placing
Reinforced/Prestressed Cement concrete in super - stucture as per drawing and Technical Speciafication complete s per Specifications. A. RCC
46 37.74 - with OPC cement design mix M25 @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.7 cum and fine
aggregates @ 0.47 cum with superplastisiser @ 3lts confirming to IS9103 -1999 raffirmed - 2008, Case - 1 : Using concrete mixer MORTH
Specification No. 1500, 1600 & 1700.
ADDITIONAL ITEMS FOR MANGALORE CIRCLE - Solid Slab Super Structure - KSRRB M2300-3.1 Furnishing and Placing
Reinforced/Prestressed Cement concrete in super - stucture as per drawing and Technical Speciafication complete s per Specifications. A. RCC
46 37.74 - with OPC cement design mix M25 @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.7 cum and fine
aggregates @ 0.47 cum with superplastisiser @ 3lts confirming to IS9103 -1999 raffirmed - 2008, Case - 1 : Using concrete mixer MORTH
Specification No. 1500, 1600 & 1700.
Slab Culvert 4.249 Cum 1 7.50 1.80 + 1.80 0.200 + 0.200 2.70
2 2
Slab Culvert 4.344 Cum 1 8.30 1.90 + 1.90 0.250 + 0.250 3.94
2 2
Cum Total Quantity :- 6.64
Cum Now Payable Quantity :- 3.45
KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment
with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and
28 19.61 compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory
roller) MORTH Specification No. 305
Km 6.922 Retaining Wall Both Side Cum 1 15.00 9.50 + 12.00 2.00 + 2.00 322.50
(Avg Depth) 2 2
Cum 1 30.00 12.00 + 12.00 2.20 + 2.20 792.00
2 2
Cum 1 10.00 12.00 + 12.00 2.00 + 2.00 240.00
2 2
Km 4.556 Retaining Wall Left Side Cum 1 30.00 1.50 + 1.50 1.80 + 1.80 81.00
2 2
Cum 1 26.00 1.50 + 1.50 1.60 + 1.60 62.40
2 2
Km 5.165 Retainig Wall Left Side Cum 1 17.50 1.00 + 1.00 1.40 + 1.40 24.50
2 2
Km 6.827 to Km 6.396 Right Side Cum 1 30.00 1.50 + 1.50 1.000 + 1.000 45.00
2 2
Cum 1 30.00 1.50 + 1.50 1.000 + 0.900 42.75
2 2
Cum 1 20.00 1.50 + 1.20 0.900 + 0.800 22.95
2 2
Cum 1 30.00 1.20 + 1.00 0.800 + 0.900 28.05
2 2
Cum 1 30.00 1.00 + 1.00 0.900 + 0.800 25.50
2 2
Cum 1 30.00 1.00 + 1.00 0.800 + 0.900 25.50
2 2
Cum 1 30.00 1.00 + 1.00 0.900 + 1.200 31.50
2 2
Cum 1 15.00 1.00 + 1.00 1.200 + 1.200 18.00
2 2
Cum 1 20.00 1.00 + 1.00 1.200 + 1.200 24.00
2 2
Cum 1 30.00 1.00 + 1.50 1.200 + 1.200 45.00
2 2
Cum 1 30.00 1.50 + 1.50 1.200 + 1.000 49.50
2 2
Cum 1 26.00 1.50 + 1.50 1.000 + 1.000 39.00
2 2
Cum 1 30.00 1.50 + 1.50 1.000 + 0.600 36.00
2 2
Cum 1 30.00 1.50 + 1.50 0.600 + 0.600 27.00
2 2
Cum 1 20.00 1.50 + 1.50 0.600 + 0.600 18.00
2 2
Cum 1 30.00 1.50 + 1.50 0.600 + 0.500 24.75
2 2
Cum Total Quantity :- 2024.90
Cum Now Payable Quantity :- 2024.90
Providing and constucting pithcing / Revetment of 30 cm thick on slopes using granite/basalt/trap/stones of surface area not less than 0.04 sqm
48 34.14 and wedged with spalls including cost of all materials, labour etc., complete as per specification.
Total Rs.
Adequacy of Materials
Specification Item code Qty Co-eff
GSB 20.6.2 1287.42 1.250
WMM 20.18 2817.00 1.320
BM 21.11.6 457.05 1.415
SDBC 21.20.6 228.86 1.404
PCC M 10 grade 27.18 27.24 0.870
PCC M 15 grade 27.24 0.00 0.840
RCC M20 grade 27.26 & 28.7.9 171.36 0.690
Royalty charges
1 Metal 6437.70 at Rs 108.00
2 sand 92.99 at Rs 103.00
3 Gravel 0.00 at Rs 30.00
Recovery Rs.
Says.Rs.
Certified that the work has been completed satisfactorily. There is no dues to be recovered from the Agency other than prop
Section officer
of Bellala Village and Improvement of Vandse-Nandroli-Bellal Road from Km 0.00 to
mahankali
CER No.road from Km 0.00 to 2.00 in Kundapura taluk udupi District (I.N. 78768)
855/2017-18
vemnts
Agreement No: DAR No: 675/2017-18: dated: 12/03/2018
Work Executed
Agreement Value Since Previous Bill Present Bill Upto Date Bill
Quantity Amount Quantity Amount Quantity Amount
of Materials
Metal / stone Co-eff sand Co-eff Gravel
1609.28 0.000 0.00 0.000 0.00
3718.44 0.00 0.00 0.00 0.00
646.73 0.00 0.00 0.00 0.00
321.32 0.00 0.00 0.00 0.00
23.70 0.52 14.16 0.00 0.00
0.00 0.56 0.00 0.00 0.00
118.24 0.46 78.83 0.00 0.00
6437.70 92.99 0.00
Cum Cum
695271.81
9578.01
0.00
704849.82
704850.00
ered from the Agency other than proposed in this Bill. Contractor has used his own machinaries.
143.00 0 0 3 -3 0
25.00 0 4 3 1 4
30.00 0 4 3 1 4
282.00 0 0 3 -3 0
9.00 0 3.1 0 3.1 3.1 Concrete Reach Start
39.00 0 0 0 0 0
30.00 4 4 3 1 4
30.00 4 4 3 1 4
20.00 0 4 3 1 4
30.00 0 4 3 1 4
30.00 0 4 3 1 4
30.00 0 4 3 1 4
10.00 0 4 3 1 4
10.00 0 5 3 2 5
7237.00
7232.00
7219.00
7189.00
7159.00
7152.00
7122.00
7092.00
7062.00
7032.00
7002.00
6976.00
6946.00
6922.00
6892.00
6862.00
6842.00
6827.00
6797.00
6767.00
6747.00
6717.00
6687.00
6657.00
6627.00
6612.00
6592.00
6562.00
6532.00
6506.00
6476.00
6446.00
6426.00
6396.00
6253.00
6233.00
6213.00
6188.00
6168.00
6143.00
6113.00
6088.00
6058.00
6038.00
6035.00
6005.00
5975.00
5945.00
5923.00
5893.00
5863.00
5833.00
5803.00
5773.00
5764.00
5734.00
5704.00
5674.00
5644.00
5624.00
5614.00
5594.00
5574.00
5544.00
5534.00
5504.00
5222.00
5213.00
5193.00
5183.00
5144.00
5114.00
5084.00
5054.00
5024.00
4994.00
4964.00
4934.00
4904.00
4874.00
4844.00
4814.00
4794.00
4764.00
4734.00
4704.00
4674.00
4644.00
4614.00
4608.00
4578.00
4562.00
4556.00
4536.00
4530.00
4500.00
4470.00
4440.00
4410.00
4390.00
4383.00
4372.00
4344.00
4342.00
4329.00
4309.00
4279.00
4249.00
4247.00
4217.00
4187.00
4157.00
4127.00
4097.00
4087.00
4062.00
4032.00
4022.00
4002.00
3992.00
3962.00
3942.00
3912.00
3882.00
3852.00
3828.00
3820.00
3790.00
3760.00
3750.00
3720.00
3714.00
3684.00
3664.00
3634.00
3624.00
3610.00
3580.00
3570.00
3558.00
3548.00
3538.00
3524.00
3520.00
3500.00
3480.00
3460.00
3440.00
3410.00
3385.00
3360.00
3335.00
3305.00
3275.00
3260.00
3230.00
3200.00
3170.00
3150.00
3140.00
3115.00
3085.00
3055.00
3040.00
3034.00
3014.00
2994.00
2976.00
2966.00
2936.00
2906.00
2898.00
2878.00
2858.00
2838.00
2827.00
2797.00
2767.00
2737.00
2729.00
2709.00
2689.00
2685.00