PROJECT:NEW STAFF HOUSING PROJECT-KAMC

MECHANICAL AND ELECTRICAL DAILY REPO


Sr.N
o. Man Power Description Qty.

Working on Shop
Drawings and Trench
1 MECHANICAL ENGINEER 1
digging,Sand bedding
for pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
Supervising the site
3 SUPERVISOR 2
work
Trenches marking and
4 SURVEYORS 1
level checking
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS Mech.trenchs 1

Sr.N
o. Equipment Involved Description Qty.

1 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:1-Jan-2020
ND ELECTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

1 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:2-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:4-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:5-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:6-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:7-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:8-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:9-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:11-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:12-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:13-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:14-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:15-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
DATE:16-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
DATE:18-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches and LV
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
DATE:19-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
DATE:21-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining material Arrived at site
DATE:22-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining for mechanical Pipe
DATE:23-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
6 EXCAVATOR OPERATORS excavating the Electro- 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining for mechanical Pipe
5 Excavation Started for portable pipe
DATE:25-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining for mechanical Pipe
5 Excavation Started for fire pipe
DATE:26-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 Working on MV and Lighting Trenches
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining for mechanical Pipe
5 Excavation Started for irrigation pipe
DATE:28-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 working on trunch cleaning
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Lining for mechanical Pipe
5 Excavation Started for Mechanical Pressurized pipe
DATE:29-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks

1
PROJECT:NEW STAFF HOUSING PROJECT-KAMC
MECHANICAL AND ELECTRICAL DAILY REPO
Sr.N
o. Man Power Description Qty.

Working on Storm Shop


Drawing,Coordination
1 MECHANICAL ENGINEER Drawing and Trench 1
digging,Sand bedding for
pipe installation

Working on Shop
2 ELECTRICAL ENGINEER 2
Drawings.
3 SUPERVISOR Supervising the site work 2
Trenches marking and
4 SURVEYORS level checking 1
5 HELPERS Helping the surveyor 1
excavating the Electro-
6 EXCAVATOR OPERATORS 1
Mech.trenchs

Sr.N
o. Equipment Involved Description Qty.

7 Excavator 1
Site work Progress
1 working on trunch cleaning
2 Working on Sewage Trench
3 Survey marking for Mechanical Pipe
4 Survay for manholes
5 Excavation profgressing for Mechanical Pressurized pipe
DATE:30-Jan-2020
CTRICAL DAILY REPORT
Zones Remarks

For all
Zones

Zones Remarks