Sie sind auf Seite 1von 1

A B C D E F G H I J K

1 1

2 2

3 3

4 4

5 5

6 6

OWNER: OWNER'S MANUFACTURER:


ENGINEER:

7 7
DESIGNER: EPC CONTRACTOR:

PROJECT:

Samra Phase IV Add-On Combined Cycle Project


- - - - - -
- - - - - -
- - - - - -
C 9/11/2016 Revised according to RWC YANGFY SHEN YING ZHAO
B 5/9/2016 Revised according to RWC YANGFY SHEN YING ZHAO
A 15/8/2016 First Issue YANGFY SHEN YING ZHAO
REV DATE DESCRIPTION DONE CHECKED APPROVED RELEASED
EPC CONT. SIGNATURE DATE
FOR INFORMATION

STATUS
8 FOR CONSTRUCTION 8
FOR APPROVAL X
FOR OWNER REVIEW
VALID FOR PURCHASE - -
AS BUILT
FOR DESIGN

DOCUMENT NUMBER: DOCUMENT NAME:

P&ID Air take-off & Cleaning System


SIZE: SCALE: SHEET: -
A1 - NEXT: -
-
A B C D E F G H I J K

Das könnte Ihnen auch gefallen