WARD BASED PROJECTS FY 2018-19

S/
NO
PROGRESS AS STATUS PAYMENT REMARKS
ROAD NO. / ON % STATUS
TENDER NO. CONTRACT 14thJanuary
CONTRACT NO ROAD SECTION NAME OR WARD COST (KSH) 2020
1 Periodic Maintenance Affected by
of Roads in Matulo Dozing – rains
Ward(simalabandu 4.1km 50%
ndakuywa completed
1.5KM,matumbai – Grading –
BGM/CNTY/OT/ mtuta –main road – M/s Kelco 4.1km
CEF/245/2018- chebukosi – khabwabi builders Matulo 10,741,368.0 completed
2019 river road 2.6KM.) limited Ward 0 Gravelling -
2 Dozing – Retention COMPLETED
4.5km in process
completed
Grading –
4.5km
completed 100%
Periodic maintenance Gravelling –
of Roads in Misikhu 4.5km
BGM/CNTY/OT/ Ward(Matala – completed
CEF/246/2018- nakhabala – lukhuna M/s Trinity MISIKHU 5,353,400.00 Culverts – 32m
2019 road) Gallaghier WARD completed
3 Grading – Awaiting COMPLETED
completed 95% retention
4.2km
Periodic Maintenance Gravelling –
of Roads in Sitikho 4.2KM
Ward(mejakuwa pcu- completed
kuywa pri –salvation Dozing –1.7km
BGM/CNTY/OT/ army,yalusi mkt – M/s completed
CEF/247/2018- chinjusi bridge – chiefs Simspur SITIKHO 9,512,580.00 Culverts –
2019 centre) Limited WARD installed 39.5m
4 M/s Grading – 90% 2nd COMPLETED
BGM/CNTY/OT/ Periodic Maintenance Citiehills BUKEMBE completed Payment
CEF/248/2018- of Roads in Bukembe enterprise EAST 9,401,742.00 5.2km in process
2019 East Ward(completion limited WARD

1
of machinjoni professor Gravelling –
– sudi mkt road) completed
5.2km.
Culvert – 57m
completed
5 Periodic Maintenance Dozing –5km SLAW
of Roads in East done PROGRESS
Sang'alo Grading – 30% Affected by
Ward(construction of ongoing rains
tungelele drift,periodic Gravelling -
BGM/CNTY/OT/ maintenance of lutungu M/s Valeria
CEF/249/2018- Stephen wanjitala construction Sang'alo 10,071,340.0
2019 tungelele pri road) Limited East Ward 0
6 Grading – SLAW
4.2km 45% PROGRESS
Periodic Maintenance completed Affected by
of Roads in Khalaba Gravelling – rains
Ward(c33 pork 2.4km
butchery r khalaba,C33 done,1.8km
chebukube mkt r pending
khalaba road,Mija Culverts –
guest hse ongoing
BGM/CNTY/OT/ road,Wandiaka juma Dozing –
CEF/250/2018- bakari road,C33 royal M/s Wingar KHALABA 10,121,395.0 4.2km
2019 hotel road.) limited WARD 0 completed
7 Dozing – done 1st Affected by
2.4km 80% payment rains
Grading – done
Periodic Maintenance 3.9km done
of Roads in Musikoma M/s Gravelling –
BGM/CNTY/OT/ Ward(Sacred Flashbright 3.9km done.
CEF/251/2018- montevilla road,Mulaa contractors MUSIKOM 8,738,048.00 Culverts – not
2019 sio road) limited A WARD done
8 Grading – done BACKFILLIN
0.8km 75% G CULVERT
Gravelling –
done Affected by
Culverts – 21m rains
M/s done pinnacle
BGM/CNTY/OT/ Periodic Maintenance Avalanche road
CEF/252/2018- of Roads in Township investment TOWNSHIP 2,839,482.00
2019 Ward(Elegant road) limited WARD

2
9 Dozing – Request Affected by
1.8km done 90% for rains
Grading – payment
Periodic Maintenance 1.8km done
of Roads in Tuuti/ Gravelling –
BGM/CNTY/RT/ Marakaru M/S Boku 1.8km done
CEF/338/2018- Ward(Bukananachi r construction TUUTI/MA Culverts -
2019 khalaba road) limited RAKARU 5,586,328.00 ongoing
10 Periodic Maintenance Payed COMPLETED
of Roads in West Grading – awaiting
Sang'alo completed retention
Ward(Construction of Gravelling –
chemululuchi completed 90%
culverts,Sang’alo Armco culvert
luyekhe r khalaba M/s – installed 4m
BGM/CNTY/OT/ road,Professor Phelamix WEST Culvert
CEF/254/2018- namwacha mkt krato Investment SANG'ALO installation –
2019 jntn road) limited WARD 10m
11 Grading – First To complete
completed 80% payment installation of
4.0km. done culverts
Periodic Maintenance Gravelling –
BGM/CNTY/OT/ of Roads in Bumula M/s Gaspas completed
CEF/255/2018- Ward(Tabuti lurare engineering BUMULA 7,494,713.00 4.0km
2019 bumula mkt road) works WARD Culverts -
12 Dozing – Request completed
3.4km 90% for
completed payment
Grading –
Periodic Maintenance 6.2km done
of Roads in Kabula Gravelling –
BGM/CNTY/OT/ Ward(Kabula syoya M/s Sonata 6.2km done
CEF/256/2018- road,C33 Naburereya Kenya KABULA 10,744,558.0 Culverts -72m
2019 namasanda mkt road) Limited WARD 0 done
13 Dozing – done Culvert
on lelekwe First installation to
road payment start
Periodic Maintenance Grading – raised
of Roads in Kimaeti 8.4km done 80%
Ward(Lelekwe Syombe Gravelling –
BGM/CNTY/OT/ kimaeti sec M/s Billuck 2.2km
CEF/257/2018- road,Syombe tulukuyi enterprises KIMAETI 7,497,776.00 done(syombe
2019 road) limited WARD road)

3
Culverts – to
start
14 Dozing –8.6 Affected by
km done First rains
Grading – payment
partiay done done
Periodic Maintenance Gravelling – 60%
of Roads in Siboti completed
BGM/CNTY/OT/ Ward(Miluki kabubero miluki 2.2km
CEF/258/2018- road,Nasimbo Nangata M/s SIBOTI 8,098,134.00 Culverts – to
2019 Khabusi road) Limassol ltd WARD start
15 Grading – Slow
completed 50% First progress
Periodic Maintenance 9.0km payment
of Roads in South Gravelling – raised Affected by
Bukusu Ward(Tulumba 3km done,2km rains
BGM/CNTY/OT/ Lukhuna Mareba SOUTH pending
CEF/259/2018- road,Tulumba M/s Enville BUKUSU 9,792,476.40 Culverts -6m
2019 Schekereni road) ventures Ltd WARD done
16 Dozing – ongoing
completed
Periodic Maintenance Grading – 50%
of Roads in West partially done
Bukusu Ward(Tarmac Gravelling –
BGM/CNTY/OT/ mm randa salverio M/s Lexah WEST partially done
CEF/260/2018- tunya road,Ng’oli holdings BUKUSU 10,142,924.0 Culverts –to
2019 tulumba road) limited WARD 0 start
17 Dozing – 95% Awaiting COMPLETED
2.6km done retention
Periodic Maintenance M/S Grading –
BGM/CNTY/RT/ of Roads in Khasoko Benewa 2.6km done
CEF/340/2018- Ward(Lubunda myanga Enterprises Khasoko Gravelling –
2019 jntn road) limited Ward 6,641,580.00 2.6km done
18 Grading -3.8 90% Payment completed
Periodic Maintenance km done process
of Roads in Cheptais Gravelling – ongoing
BGM/CNTY/RT/ Ward(Cheptais hospital 3.9km done
CEF/342/2018- kapsesoi tembelela M/S Renja Cheptais Culverts – 16m
2019 road) Holdings Ltd Ward 7,101,670.80 done
19 Periodic Maintenance Diversion of Ongoing
BGM/CNTY/OT/ of Roads in Chepyuk M/s Netima water – done 50%
CEF/263/2018- Ward(Construction of enterprises Chepyuk 8,877,132.00 Blinding –
2019 kumurio bridge) Limited Ward done

4
Base – casted
Formworks-
done
Aburtments –
done
Deck - ongoing
20 Grading – done 50% ongoing
Periodic Maintenance M/S Mid Gravelling –
BGM/CNTY/RT/ of Roads in Chesikaki Firm ongoing
CEF/343/2018- Ward(Mulukhu Melon Enterprises Chesikaki Culverts – to
2019 Kapkoto road) Ltd Ward 7,467,375.00 start
21 Excavation – 85% 1st BACKFILLIN
done payment G ONGOING
River diversion done
– done
Rock filling –
done
Blinding –
done
Base – done
Aburtments –
done
Formwork for
deck – done
Steelworks –
Construction of done
Mwetuny Vented Drift Deck – casted
BGM/CNTY/OT/ In Elgon M/s Gamma Backfiling -
CEF/265/2018- Ward(Construction of builders ELGON 7,192,012.00 ongoing
2019 mwetuny vented drift) Limited WARD
22 Dozing – 40% Stalled
Periodic Maintenance completed
of Roads in Kaptama Grading – done
Ward(Kapsamii Gravelling – to
BGM/CNTY/OT/ kamatira road,Chemoge M/s Sabema start
CEF/266/2018- mkt primary school internationa KAPTAMA 6,655,152.00 Culverts – to
2019 road) l Ltd WARD start
23 Dozing – 1st COMPLETED
completed payment
Periodic Maintenance M/S Grading – 90% done
of Roads in Nasikhab completed 2km
BGM/CNTY/RT/ Chwele/Kabuchai Civil Gravelling –
CEF/339/2018- Ward(Yoram Contractors CHWELE done
2019 Namilama road) Ltd KABUCHAI 6,529,698.00 Culverts - done

5
24 Dozing – Request COMPLETED
5.6km for
completed payment
Grading -
5.6km
completed 90%
Periodic Maintenance Gravelling-
of Roads in Luuya/ 2.6km
BGM/CNTY/OT/ Bwake Ward(Marobo Luuya/ completed
CEF/268/2018- Luuya girls chekulo M/s Trinity Bwake 6,608,404.00 Culverts – 8m
2019 mkt road) Gallaghier Ward done
25 Chebukwa Payment COMPLETED
sirare process on
completed
6.3m 85%
Chemwa –
chebukwa
6.3m
Periodic Maintenance completed
of Roads in West Kasosi – sawali
Nalondo 6.4m
Ward(Musokho completed
mayanja mkt,sirare Sirare –
muyayi khasule 7m
khasule,chebukwa completed
BGM/CNTY/OT/ chemwa,sirare M/s Nissi West Backfilling -
CEF/269/2018- chebukwa muyayi company Nalondo 9,011,634.00 ongoing
2019 bridges) limited Ward
26 Dozing – 1st COMPLETED
6.2km done payment
completed done
Grading – 80%
Periodic Maintenance 6.2km
of Roads in Mukuyuni M/s completed
Ward(lukhome mkt Nambaya Gravelling –
BGM/CNTY/OT/ nakayonjo Natela 6.2km done
CEF/270/2018- factorymilembe Enterpriseli MUKUYUN 9,485,784.00 Culverts –
2019 kimalewa road mited I WARD ongoing
27 Periodic Maintenance Dozing – SLAW
of Roads in 5.4KM done PROGRESS
Kamukuywa Grading – 40%
BGM/CNTY/OT/ Ward(musembe M/s Neplink 5.2km done Affected by
CEF/271/2018- road,makhonge marofu holdings KAMUKUY 9,792,720.00 Gravelling – rains
2019 road) Limited WA WARD ongoing

6
Culverts -
ongoing
28 Dozing – 3KM STALLED
Periodic Maintenance done
of Roa Completion of Grading – 3KM 40% Affected by
lwanda done rains
BGM/CNTY/OT/ road,completion of M/s Rudami Gravelling – to
CEF/272/2018- paspalam road ds in enterprise Kimilili 8,891,806.00 start
2019 Kimilili Ward( limited Ward Culverts -
29 Dozing – 1st To install
3.4km done payment culverts
Grading – 80% done
3.4km done
Periodic Maintenance Gravelling -
BGM/CNTY/OT/ of Roads in Kibingei 3.4km done
CEF/273/2018- Ward(kunda kolongolo M/s Yonak Kibingei 9,138,712.00 Culverts - to
2019 friends r. kibisi road) (K) ltd Ward start
30 Periodic Maintenance Grading – 5km Request Affected by
of Roads in Maeni done for rains
Ward(kibisi kamasielo Gravelling – payment
BGM/CNTY/OT/ kikwechi road,grading M/s 2.8km done
CEF/274/2018- of yembe,kapiri sosio Jessisham MAENI 8,473,660.80 Culverts - 85%
2019 and mkulima road) Enterprises WARD ongoing
31 Excavation – Awaiting
done Request stone
Blinding – for pitching and
done 75% payment gabions
Base – casted installation
Aburtment
wall – ready
for casting
Periodic Maintenance Aburtments –
of Roads in Namwela M/s casted
BGM/CNTY/OT/ Ward(construction of Citiehills 18/9/19
CEF/275/2018- wangwe kolani box enterprises NAMWELA 6,774,922.00 Formwork for
2019 culvert) limited WARD deck -
32 Periodic Maintenance M/s To be cancelled
BGM/CNTY/OT/ of Roads in Mihuu Janventures retendered 0%
CEF/276/2018- Ward(construction of company Mihuu 6,485,397.00
2019 toil box culvert) limited Ward
33 BGM/CNTY/OT/ Excavation – Payment completed
CEF/277/2018- Periodic Maintenance M/s NDIVISI 5,895,120.00 done in process
2019 of Roads in Ndivisi Kemasha WARD 85%

7
Ward(construction of investments Blinding –
khakuta crossing) limited done
Bed – casted
Steel works –
ongoing for
aburtments
Formwork –
ongoing for
abutments
Aburtments –
done
Deck
formwork –
done
Steelworks for
deck – done
Deck – casted
Bacfilling -
done
34 Periodic Maintenance Grading – done Affected by
BGM/CNTY/OT/ of Roads in Milima M/s Rearyn Gravelling – to 40% rains
CEF/278/2018- Ward(maliki rising company MILIMA 3,946,668.00 start stalled
2019 star) Limited WARD Culverts –
35 Periodic Maintenance Grading – 90% Request ongoing
of Roads in Naitiri/ 7.5km done for
Kabuyefwe Ward(nzoia Gravelling – payment
jtn pwani mitua 5km done
road,nasianda lungai Culverts -
BGM/CNTY/RT/ road,construction of M/S Shifa NAITIRI/ ongoing
CEF/341/2018- makete sabwani and Enterprises KABUYEFW
2019 mariti drifts) Ltd E WARD 9,244,875.00
36 Grading – done Slow
Gravelling – to progress
Periodic Maintenance start 30%
of Roads in Ndalu Culverts - Affected by
BGM/CNTY/OT/ Ward(mwalimu kisaka NDALU/ rains
CEF/280/2018- tabani rc school t m/s Yonak TABAN 6,965,742.00
2019 junction road) (K) Limited WARD
37 Periodic Maintenance Culvert 90% 1st completed
BGM/CNTY/RT/ of Roads in Mbakalo installation – payment
CEF/344/2018- Ward(installation of MBAKALO 59M done done
2019 culverts) M/S Ltd WARD 8,661,441.60

8
38 Excavation – Awaiting
done 70% First approach
Blinding – payment road and
done done backfill
Formwork for
base – done
Base – casted
on 27th august
19
Formwork for
first lift of
aburtments -
done
Aburtments –
done
BGM/CNTY/RPW M/S dec –done
/RT/CEF/344/20 Construction of Njiwa Shirsamo Tongaren backfill – to
18 - 2019 box culvert Agencies Ltd ward 8,661,441.60 start