Quotations, Purchase Orders, & Request for Payment: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
3 Units Exhaust Blowers
Ducting Installation
Air-conditioning Units Installation
Sprinkler System Installation
Stainless Steel Equipment, Chillers, Freezers
Chest Type Freezers
Refrigerators
Glass Panel
Mirrors
Roll-up Shutter
Tables & Chairs (see blueprint for number of T&C)
Gas line Installation
LPG Supply
Air-conditioning Units
Wall Mounted Flat Screen TV
DVD System
Component with Speakers
Point of Sale System (EPOS)
Signage
Menu Board
Murals
Tools & Utensils
Droplights (see Blueprint for number & size of Droplights)
Tigbao Sticks
Construction Materials: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
First Delivery (Masonry Construction Materials)
Second Delivery (Carpentry Materials)
Third Delivery (Finishing Materials)
Hand Dryers
RCA Wires
Speaker Wires
Magnetic Starters
Electric Meter Base & Meter
Panel Board
Circuit Breakers
Feeder Line
Water Meter
Masonry Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
CHB (Concrete Hollow Blocks) laying for partitions
CHB (Concrete Hollow Blocks) plastering
Electrical Lines Provisions
Plumbing & Water Lines Provisions
Drainage Lines Provisions
Water Proofing of Floor Area (if applicable)
Kitchen Wall Tiles Installation
Kitchen Wall Tiles Grouting
Kitchen Floor Tiles Installation
Kitchen Floor Tiles Grouting
Installation of Pass Through Window at Kitchen wall area
Dining Walls Plastering
Dining Floor Tiles Installation
Dining Floor Tiles Grouting
Installation of Brick Wall at Grill Area
Grouting of Bricks at Grill Area
Installation of Bricks at Column Posts
Grouting of Bricks at Column Posts
Check all Floor Tiles for Loose Grouting
Check all Floor Tiles for Air Spaces (Do Re-tiling)
General Electrical Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Temporary Meter (for construction use)
Installation of Electric Feeder line (if applicable)
Telephone Line Installation
Electrical layout & provisions
Installation of Fixed Electric Meter Base
Installation of Fixed Electric Meter
Permanent Tapping of Electrical Lines
Electric Meter Accuracy Test Certificate
Installation of Electrical Panel Boards
Installation of Electrical Circuit Breakers
Labeling of Circuit Breakers
Electrical Loading Certificate
Installation of Electrical Sockets
Installation of Lights Switches
General Plumbing Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Laying of Water Lines
Laying of Drainage Lines
Floor Drainage Installation
Soft drink dispenser drainage
Testing of Sink & Floor Drainage for clogging
Water Meter Installation
Water Meter tapping
Water Meter accuracy test certificate
Wash Area Lavatory: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Granite Slabs at Wash Area Lavatory
Installation of Sinks & Faucets at Wash Area Lavatory
Grouting of Granite Slabs at Wash Area Lavatory
Comfort Room & Utility Room Area: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
CR wall & floor tiling
Installation of CR Wash Sink
Installation of CR Urinal
Installation of CR Toilet Bowl
Installation of CR Tissue Holder
Installation of CR Hand Soap Dispenser
Installation of Slop Sink
Carpentry Works (Counter Table): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of counter table
Fabrication of counter table shelves divisions
Sanding and Plastering of Counter Table shelves & cabinets
Painting of Counter Table with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs at Counter Table
Grouting of Granite Slabs at Counter Table
Punching of holes at Granite Slabs of Counter table for cabling of EPOS
Carpentry Works (Dispatch Table): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of dispatch table
Fabrication of dispatch table shelves divisions
Sanding and Plastering of Dispatch Table shelves & cabinets
Painting of Dispatch Table with Green paint using Air Compressor Spray
Installation of Granite Slabs at Dispatch Table
Grouting of Granite Slabs at Dispatch Table
Punching of holes at Granite Slabs of Dispatch table for cabling of EPOS
Carpentry Works (Office Shelves): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Office shelves and cabinets
Sanding and Plastering of Office shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Carpentry Works (Stockroom Shelves): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Stockroom shelves and cabinets
Sanding and Plastering of Stockroom shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Carpentry Works (Locker Cabinets): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Locker Cabinets
Sanding and Plastering of Locker Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Locks and Handles
Carpentry Works (Condiments Cabinets): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Condiments Cabinets
Sanding and Plastering of Condiments Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs on top of Condiments Cabinet
Grouting of Granite Slabs
Carpentry Works (False Windows): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of False Window
Sanding of False Window
Installation of False Window at wall area
Installation of Back Lighting at False Window
Varnishing of False Window using Air Compressor Spray
Carpentry Works (CR & Wash Area Mirror Frames): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors
Carpentry Works (Wooden Beams): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Wooden Beams
Sanding of Wooden Beams
Installation of Wooden Beams at ceiling area
Varnishing of Wooden Beams with Brown paint using Air Compressor Spray
Ceiling: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of C-purlins
Plastering of C-purlins
Painting of C-purlins with Orange Enamel Paint
Ceiling Installation (if applicable)
Installation of Manholes at Ceiling (if applicable)
General Painting Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Painting of Ceiling with Black Flat enamel Paint
Painting of Ducting with Black Flat enamel paint
Painting of Walls Mango Orange & Green semi-gloss paint
Mechanical Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Ducting fabrication for Exhaust
Ducting installation for Exhaust
Ducting fabrication for Fresh Air
Ducting installation for Fresh Air
Installation of Manholes / Hand holes at exhaust for cleaning
Installation of CR Exhaust
Installation of Office Exhaust
Delivery of 3 units Blowers
Installation of Exhaust Blower
Installation of Fresh Air Blower
Installation of Back-up Blower
Installation of ducting Droppings to Hood
Installation Fresh Air Vents & Grills
Insulation of Exhaust with asbestos / fiberglass insulation
Painting of Ducting with Black Flat enamel paint
Delivery of 3 units Magnetic Starters
Installation of 3 Magnetic Starters (Exhaust, Fresh Air, & Back-up blower)
Tapping of electrical lines for Magnetic Starters
Testing of all 3 Blowers
Air-conditioning System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Aircon Delivery
Aircon Installation
Aircon drainage installation
Aircon drainage insulation
Aircon drainage painting
Testing of Air-conditioning units
Air Balancing Certificate (applicable to SM stores)
Sprinkler System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Draining of Sprinkler system to allow installation of heads
Installation of Sprinkler Heads
Installation of Sprinkler Caps
Installation of Sprinkler Heads with 200 degrees heads for Kitchen Area
Painting of Sprinkler Pipes and Heads with Black Flat enamel paint
Stainless Steel Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery of Grill & Kitchen Hoods
Installation of Hoods
Installation of Spark Arrestor
Installation of Baffle Filters
Installation of Stainless Steel Equipment
Installation of Chicken Holding Cabinet
Installation of Preparations Tables
Punching of soft drink dispenser hose area at stainless steel table
Installation of Sinks & drainage
Installation of Pass Through stainless steel sidings
Installation of Utensils Racks
Installation of Stainless Steel Racks
Lighting & toggle switch at stainless steel hood
Charcoal Bin installation underneath Grill Area
Chillers & Freezers: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery of Chest Type Freezer
Delivery of Refrigerator
Delivery of 4 Door Upright Chillers & Freezers
Installation of Upright Chillers & Freezers
Drainage installation of Chillers & Freezers
Gas line: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Gas line
Installation of Gas line Meter
Installation of Safety Device (1 pc. - Non SM site / 6 pcs. - SM branches)
Nitrogen Leak test
Bubble Leak Test
Welding of all gas line joints and treads
Tapping of LPG Gas line to main line (if centralized)
Painting of Yellow Paint for gas line
Gas Room Fabrication (if applicable)
LPG Gas Tanks delivery (if non centralized)
Glass Panel & Roll-up Shutter: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Glass Panel
Application of Silicon sealant at Glass Panel
Installation of Roll-up Shutter
Painting of Roll-up Shutter
Signage, Menu Board, & Murals 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Menu Board Hardiflex Back Boarding (c/o Contractor)
Measurement of Signage, Mural, & Menu Board as per approved signage plan
Installation of Signage
Installation of Menu Board
Installation of Murals
Installation of Glass Panel Sticker Strip
Point of Sale System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Punching of Hole at Counter & Dispatch table for EPOS
Cabling of Counter & Dispatch table
Installation of POS Servers, Printers, & Touch Screens
BIR - COR for programming of EPOS (Company Name & TIN Number)
Tapping of Lotus Notes to POS (applicable to SM Stores)
Submission of Warranty Certificates (for SM Stores)
Lighting: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Wall Lamps
Installation of Prismatic Fluorescent Lights
Installation of Droplights
Installation of Counter Area Pin Lights
Installation of Counter Area Cove Lights
Installation of Lights Switches
Appliances Installation: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of TV RCA wiring
Installation of wall mounted Flat Screen TV
Installation of DVD & Component system at counter area
Installation of speakers at C-purlins area
Installation of Hand Dryers
Other Furniture & Fixtures: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Hand Soap Dispenser
Installation of Fire Extinguishers
Tables & Chairs Delivery
Delivery of Tools & Utensils (c/o Opening Team)
Beverage Dispensers: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery & Installation of Pepsi / Coke refrigerator
Delivery & Installation of Soft drinks dispenser
Delivery & Installation of Soft drinks figals & CO2 tanks
Delivery & Installation of Pineapple Juice dispenser
Delivery & Installation of Iced Tea dispenser
Clearing & Hauling: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Hauling of Debris
Hauling of debris at ceiling (if applicable)
Return of Excess Construction Materials to Harrison branch storage room
Cleaning of Site by Contractor
Punch listing & Operations Turnover: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Run-through of all equipment
Punch listing of deficiencies 5 days prior to Opening Day
Rectification of punch listed deficiencies
Request for payment for Labor Contractor's 10% retention fee (30 days)
DATE OF VISIT
PROJECT MANAGER
CONTRACTOR / FOREMAN
FRANCHISE MANAGING DIRECTOR
NOTE: Site should be visited by the Project Manager atleast once (1) a week.
provided by tk inc.
provided by tk inc.
PROJECT PROCESS REVIEW
TK Branch:
Project Manager:
Contractor:
Area Manager:
Starting Date of Project:
Turn-over Date:
Opening Date:
_______________________ ______________________
AREA MANAGER / FRANCHISEE
OPENING TEAM
PROJECT INFORMATION SHEET
Branch:
Address:
Project Cost:
Project Manager:
Lessor / Building Administrator:
Mang Inasal Architect:
Cad Operator Designer:
Business Permits Staff:
Franchisee:
Managing Director:
Opening Team Leader:
Area Manager:
Labor Contractor:
Construction Materials Supplier
Blowers Fabricators
Exhaust & Fresh Air Ducting Installation
Stainless Steel Fabricator & Installation
Spark Arrestor Fabricator
Upright Chillers & Freezers Fabricator
Chest Type Freezer & Refrigerator
Glass Works & Mirrors
Roll-up Shutter
Gas Line Installation
LPG Gas Supplier
Aircon Supplier
Aircon Installation
Sprinkler System
Water Proofing
Flat Screen TV
DVD Player
Component
Tables & Chairs
POS System
Signage, Menu Board, Murals
Drop Lights
Tigbao Sticks
Tools & Utensils
Project Management - Job Information
PROJECT MANAGEMENT
13.) Prepares administrative tasks such as CARI, Construction Bond, CGLI, etc.
14.) Prepares quotations for approval & signing of BDG Project Management Head & BDG - VP.
15.) Prepares Purchase Orders (PO) for sub-contractors to begin work.
16.) Prepares request for payment for Down Payment of contractors & sub-contractors.
17.) Coordination with Human Resource Department for hiring of Management Team & Service Crews.
18.) Ensures timely delivery of construction materials (3 deliveries).
19.) Conducts construction site visits at least once (1) a week using SVO form.
20.) Coordinates with all the teams involved to resolve problems being encountered.
21.) Coordinates with sub-contractors to ensure that delivery & installation dates are on track.
22.) Coordinate with contractor's engineers & foreman to ensure timely construction of site.
23.) Coordinates with Operations Manager & Area Manager on status of the site.
24.) Updates BDG Project Management Head on status of the project.
25.) Updates Franchisee on the status of the project.
26.) Conducts Status Meeting upon 50% completion of the project with the Contractor, Franchisee,
Area Manager, & BDG Project Management Head
Administrative Tasks:
Payment of Construction Bond (if applicable)
Payment of CARI - Comprehensive All Risk Insurance (if applicable)
Payment of CGLI - Comprehensive General Liability Insurance (if applicable)
Printing of As Built Plans
Hiring of Management Team & Service Crews
Request for payment for Balance payment
PRE-CON
1 2 3 4 5 1
Construction Materials:
First Delivery (Masonry Construction Materials)
Second Delivery (Carpentry Materials)
Third Delivery (Finishing Materials)
Hand Dryers
RCA Wires
Speaker Wires
Magnetic Starters
Electric Meter Base & Meter
Panel Board
Circuit Breakers
Feeder Line
Water Meter
Masonry Works:
CHB (Concrete Hollow Blocks) laying for partitions
CHB (Concrete Hollow Blocks) plastering
Electrical Lines Provisions
Plumbing & Water Lines Provisions
Drainage Lines Provisions
Water Proofing of Floor Area (if applicable)
Kitchen Wall Tiles Installation
Kitchen Wall Tiles Grouting
Kitchen Floor Tiles Installation
Kitchen Floor Tiles Grouting
Installation of Pass Through Window at Kitchen wall area
Dining Walls Plastering
Dining Floor Tiles Installation
Dining Floor Tiles Grouting
Installation of Brick Wall at Grill Area
Grouting of Bricks at Grill Area
Installation of Bricks at Column Posts
Grouting of Bricks at Column Posts
Check all Floor Tiles for Loose Grouting
Check all Floor Tiles for Air Spaces (Do Re-tiling)
PRE-CON
1 2 3 4 5 1
Carpentry Works (CR & Wash Area Mirror Frames):
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors
Mechanical Works:
Ducting fabrication for Exhaust
Ducting installation for Exhaust
Ducting fabrication for Fresh Air
Ducting installation for Fresh Air
Installation of Manholes / Hand holes at exhaust for cleaning
Installation of CR Exhaust
Installation of Office Exhaust
Delivery of 3 units Blowers
Installation of Exhaust Blower
Installation of Fresh Air Blower
Installation of Back-up Blower
Installation of ducting Droppings to Hood
Installation Fresh Air Vents & Grills
Insulation of Exhaust with asbestos / fiberglass insulation
Painting of Ducting with Black Flat enamel paint
Delivery of 3 units Magnetic Starters
Installation of 3 Magnetic Starters (Exhaust, Fresh Air, & Back-up blower)
Tapping of electrical lines for Magnetic Starters
Testing of all 3 Blowers
Air-conditioning System:
Aircon Delivery
Aircon Installation
Aircon drainage installation
Aircon drainage insulation
Aircon drainage painting
Testing of Air-conditioning units
Air Balancing Certificate (applicable to SM stores)
Sprinkler System:
Draining of Sprinkler system to allow installation of heads
Installation of Sprinkler Heads
Installation of Sprinkler Caps
Installation of Sprinkler Heads with 200 degrees heads for Kitchen Area
Painting of Sprinkler Pipes and Heads with Black Flat enamel paint
PRE-CON
1 2 3 4 5 1
Stainless Steel Works:
Delivery of Grill & Kitchen Hoods
Installation of Hoods
Installation of Spark Arrestor
Installation of Baffle Filters
Installation of Stainless Steel Equipment
Installation of Chicken Holding Cabinet
Installation of Preparations Tables
Punching of soft drink dispenser hose area at stainless steel table
Installation of Sinks & drainage
Installation of Pass Through stainless steel sidings
Installation of Utensils Racks
Installation of Stainless Steel Racks
Lighting & toggle switch at stainless steel hood
Charcoal Bin installation underneath Grill Area
Gas line:
Installation of Gas line
Installation of Gas line Meter
Installation of Safety Device (1 pc. - Non SM site / 6 pcs. - SM branches)
Nitrogen Leak test
Bubble Leak Test
Welding of all gas line joints and treads
Tapping of LPG Gas line to main line (if centralized)
Painting of Yellow Paint for gas line
Gas Room Fabrication (if applicable)
LPG Gas Tanks delivery (if non centralized)
Lighting:
Installation of Wall Lamps
Installation of Prismatic Fluorescent Lights
Installation of Droplights
Installation of Counter Area Pin Lights
Installation of Counter Area Cove Lights
Installation of Lights Switches
PRE-CON
1 2 3 4 5 1
Appliances Installation:
Installation of TV RCA wiring
Installation of wall mounted Flat Screen TV
Installation of DVD & Component system at counter area
Installation of speakers at C-purlins area
Installation of Hand Dryers
Beverage Dispensers:
Delivery & Installation of Pepsi / Coke refrigerator
Delivery & Installation of Soft drinks dispenser
Delivery & Installation of Soft drinks figals & CO2 tanks
Delivery & Installation of Pineapple Juice dispenser
Delivery & Installation of Iced Tea dispenser
_______________________ ______________________
AREA MANAGER / FRANCHISEE
OPENING TEAM
PROJECT PROCESS REVIEW
CONSTRUCTIO
Pre-Construction Preparations: 1st 2nd 3rd
Signing of Lease Contract
Singing of Franchise Contract (if Franchised outlet)
Completion of Construction Cost Estimate (CE)
Initial Rental payment
Update Operations Department of approved site (Sherlane Piscos & Area Manager)
Submission of Blueprints to Lessor for approval
Implementation of Revised and Approved Plans by Lessor
Checking & documentation of Lessor's Business Permits
Checking & documentation of Lessor's Tax Declaration Certificate
Checking of 3 Phase Electricity Availability
Check for Availability of Feeder Line
Check for Availability of Telephone Line
Check for Availability of Water Tapping Source
Check if LPG gas source is centralized or LPG Tanks shall be needed
Check if SM Malls, fabrication of Kitchen Hood must be Self Compensating
Check if Meter Base & Meter shall be provided by Lessor
Check if Water Meter shall be provided by Lessor
Completion of Timeline (Gantt Chart)
Awarding of Contracts to all Contractors & Sub-contractors
Signing of Contractors (Labor) contract
Request for payment for Down Payment
Ordering of Materials (include Hand Dryers, RCA Wires, Magnetic Starter, Meters)
Boarding-up of site
Installation of "Soon to Open" 8X8 sized tarpaulin
Quotations, Purchase Orders, & Request for Payment: 1st 2nd 3rd
3 Units Exhaust Blowers
Ducting Installation
Air-conditioning Units Installation
Sprinkler System Installation
Stainless Steel Equipment, Chillers, Freezers
Chest Type Freezers
Refrigerators
Glass Panel
Mirrors
Roll-up Shutter
Tables & Chairs (see blueprint for number of T&C)
Gas line Installation
LPG Supply
Air-conditioning Units
Wall Mounted Flat Screen TV
DVD System
Component with Speakers
Point of Sale System (EPOS)
Signage
Menu Board
Murals
Tools & Utensils
Droplights (see Blueprint for number & size of Droplights)
Tigbao Sticks
Carpentry Works (CR & Wash Area Mirror Frames): 1st 2nd 3rd
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors
DATE OF VISIT
PROJECT MANAGER
CONTRACTOR / FOREMAN
FRANCHISE MANAGING DIRECTOR
NOTE: Site should be visited by the Project Manager atleast once (1) a week.
LIST