SITE VISIT OBSERVATION - CHECKLIST

CONSTRUCTION SITE VISITS


Pre-Construction Preparations: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Signing of Lease Contract
Singing of Franchise Contract (if Franchised outlet)
Completion of Construction Cost Estimate (CE)
Initial Rental payment
Update Operations Department of approved site (Sherlane Piscos & Area Manager)
Submission of Blueprints to Lessor for approval
Implementation of Revised and Approved Plans by Lessor
Checking & documentation of Lessor's Business Permits
Checking & documentation of Lessor's Tax Declaration Certificate
Checking of 3 Phase Electricity Availability
Check for Availability of Feeder Line
Check for Availability of Telephone Line
Check for Availability of Water Tapping Source
Check if LPG gas source is centralized or LPG Tanks shall be needed
Check if AliMalls, fabrication of Kitchen Hood must be Self Compensating
Check if Meter Base & Meter shall be provided by Lessor
Check if Water Meter shall be provided by Lessor
Completion of Timeline (Gantt Chart)
Awarding of Contracts to all Contractors & Sub-contractors
Signing of Contractors (Labor) contract
Request for payment for Down Payment
Ordering of Materials (include Hand Dryers, RCA Wires, Magnetic Starter, Meters)
Boarding-up of site
Installation of "Soon to Open" 8X8 sized tarpaulin
Administrative Tasks: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Payment of Construction Bond (if applicable)
Payment of CARI - Comprehensive All Risk Insurance (if applicable)
Payment of CGLI - Comprehensive General Liability Insurance (if applicable)
Payment of P8,000 fee for Lotus Notes (applicable to SM Stores)
Printing of As Built Plans
Hiring of Management Team & Service Crews
Request for payment for Balance payment

Quotations, Purchase Orders, & Request for Payment: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
3 Units Exhaust Blowers
Ducting Installation
Air-conditioning Units Installation
Sprinkler System Installation
Stainless Steel Equipment, Chillers, Freezers
Chest Type Freezers
Refrigerators
Glass Panel
Mirrors
Roll-up Shutter
Tables & Chairs (see blueprint for number of T&C)
Gas line Installation
LPG Supply
Air-conditioning Units
Wall Mounted Flat Screen TV
DVD System
Component with Speakers
Point of Sale System (EPOS)
Signage
Menu Board
Murals
Tools & Utensils
Droplights (see Blueprint for number & size of Droplights)
Tigbao Sticks

Construction Materials: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
First Delivery (Masonry Construction Materials)
Second Delivery (Carpentry Materials)
Third Delivery (Finishing Materials)
Hand Dryers
RCA Wires
Speaker Wires
Magnetic Starters
Electric Meter Base & Meter
Panel Board
Circuit Breakers
Feeder Line
Water Meter

Masonry Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
CHB (Concrete Hollow Blocks) laying for partitions
CHB (Concrete Hollow Blocks) plastering
Electrical Lines Provisions
Plumbing & Water Lines Provisions
Drainage Lines Provisions
Water Proofing of Floor Area (if applicable)
Kitchen Wall Tiles Installation
Kitchen Wall Tiles Grouting
Kitchen Floor Tiles Installation
Kitchen Floor Tiles Grouting
Installation of Pass Through Window at Kitchen wall area
Dining Walls Plastering
Dining Floor Tiles Installation
Dining Floor Tiles Grouting
Installation of Brick Wall at Grill Area
Grouting of Bricks at Grill Area
Installation of Bricks at Column Posts
Grouting of Bricks at Column Posts
Check all Floor Tiles for Loose Grouting
Check all Floor Tiles for Air Spaces (Do Re-tiling)

General Electrical Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Temporary Meter (for construction use)
Installation of Electric Feeder line (if applicable)
Telephone Line Installation
Electrical layout & provisions
Installation of Fixed Electric Meter Base
Installation of Fixed Electric Meter
Permanent Tapping of Electrical Lines
Electric Meter Accuracy Test Certificate
Installation of Electrical Panel Boards
Installation of Electrical Circuit Breakers
Labeling of Circuit Breakers
Electrical Loading Certificate
Installation of Electrical Sockets
Installation of Lights Switches

General Plumbing Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Laying of Water Lines
Laying of Drainage Lines
Floor Drainage Installation
Soft drink dispenser drainage
Testing of Sink & Floor Drainage for clogging
Water Meter Installation
Water Meter tapping
Water Meter accuracy test certificate
Wash Area Lavatory: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Granite Slabs at Wash Area Lavatory
Installation of Sinks & Faucets at Wash Area Lavatory
Grouting of Granite Slabs at Wash Area Lavatory

Comfort Room & Utility Room Area: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
CR wall & floor tiling
Installation of CR Wash Sink
Installation of CR Urinal
Installation of CR Toilet Bowl
Installation of CR Tissue Holder
Installation of CR Hand Soap Dispenser
Installation of Slop Sink

Carpentry Works (Counter Table): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of counter table
Fabrication of counter table shelves divisions
Sanding and Plastering of Counter Table shelves & cabinets
Painting of Counter Table with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs at Counter Table
Grouting of Granite Slabs at Counter Table
Punching of holes at Granite Slabs of Counter table for cabling of EPOS

Carpentry Works (Dispatch Table): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of dispatch table
Fabrication of dispatch table shelves divisions
Sanding and Plastering of Dispatch Table shelves & cabinets
Painting of Dispatch Table with Green paint using Air Compressor Spray
Installation of Granite Slabs at Dispatch Table
Grouting of Granite Slabs at Dispatch Table
Punching of holes at Granite Slabs of Dispatch table for cabling of EPOS

Carpentry Works (Office Shelves): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Office shelves and cabinets
Sanding and Plastering of Office shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Stockroom Shelves): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Stockroom shelves and cabinets
Sanding and Plastering of Stockroom shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Locker Cabinets): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Locker Cabinets
Sanding and Plastering of Locker Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Locks and Handles

Carpentry Works (Condiments Cabinets): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Condiments Cabinets
Sanding and Plastering of Condiments Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs on top of Condiments Cabinet
Grouting of Granite Slabs
Carpentry Works (False Windows): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of False Window
Sanding of False Window
Installation of False Window at wall area
Installation of Back Lighting at False Window
Varnishing of False Window using Air Compressor Spray

Carpentry Works (CR & Wash Area Mirror Frames): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors

Carpentry Works (Wooden Beams): 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Wooden Beams
Sanding of Wooden Beams
Installation of Wooden Beams at ceiling area
Varnishing of Wooden Beams with Brown paint using Air Compressor Spray

Ceiling: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of C-purlins
Plastering of C-purlins
Painting of C-purlins with Orange Enamel Paint
Ceiling Installation (if applicable)
Installation of Manholes at Ceiling (if applicable)
General Painting Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Painting of Ceiling with Black Flat enamel Paint
Painting of Ducting with Black Flat enamel paint
Painting of Walls Mango Orange & Green semi-gloss paint

Mechanical Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Ducting fabrication for Exhaust
Ducting installation for Exhaust
Ducting fabrication for Fresh Air
Ducting installation for Fresh Air
Installation of Manholes / Hand holes at exhaust for cleaning
Installation of CR Exhaust
Installation of Office Exhaust
Delivery of 3 units Blowers
Installation of Exhaust Blower
Installation of Fresh Air Blower
Installation of Back-up Blower
Installation of ducting Droppings to Hood
Installation Fresh Air Vents & Grills
Insulation of Exhaust with asbestos / fiberglass insulation
Painting of Ducting with Black Flat enamel paint
Delivery of 3 units Magnetic Starters
Installation of 3 Magnetic Starters (Exhaust, Fresh Air, & Back-up blower)
Tapping of electrical lines for Magnetic Starters
Testing of all 3 Blowers

Air-conditioning System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Aircon Delivery
Aircon Installation
Aircon drainage installation
Aircon drainage insulation
Aircon drainage painting
Testing of Air-conditioning units
Air Balancing Certificate (applicable to SM stores)

Sprinkler System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Draining of Sprinkler system to allow installation of heads
Installation of Sprinkler Heads
Installation of Sprinkler Caps
Installation of Sprinkler Heads with 200 degrees heads for Kitchen Area
Painting of Sprinkler Pipes and Heads with Black Flat enamel paint

Stainless Steel Works: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery of Grill & Kitchen Hoods
Installation of Hoods
Installation of Spark Arrestor
Installation of Baffle Filters
Installation of Stainless Steel Equipment
Installation of Chicken Holding Cabinet
Installation of Preparations Tables
Punching of soft drink dispenser hose area at stainless steel table
Installation of Sinks & drainage
Installation of Pass Through stainless steel sidings
Installation of Utensils Racks
Installation of Stainless Steel Racks
Lighting & toggle switch at stainless steel hood
Charcoal Bin installation underneath Grill Area

Chillers & Freezers: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery of Chest Type Freezer
Delivery of Refrigerator
Delivery of 4 Door Upright Chillers & Freezers
Installation of Upright Chillers & Freezers
Drainage installation of Chillers & Freezers

Gas line: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Gas line
Installation of Gas line Meter
Installation of Safety Device (1 pc. - Non SM site / 6 pcs. - SM branches)
Nitrogen Leak test
Bubble Leak Test
Welding of all gas line joints and treads
Tapping of LPG Gas line to main line (if centralized)
Painting of Yellow Paint for gas line
Gas Room Fabrication (if applicable)
LPG Gas Tanks delivery (if non centralized)

Glass Panel & Roll-up Shutter: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Glass Panel
Application of Silicon sealant at Glass Panel
Installation of Roll-up Shutter
Painting of Roll-up Shutter
Signage, Menu Board, & Murals 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Fabrication of Menu Board Hardiflex Back Boarding (c/o Contractor)
Measurement of Signage, Mural, & Menu Board as per approved signage plan
Installation of Signage
Installation of Menu Board
Installation of Murals
Installation of Glass Panel Sticker Strip

Point of Sale System: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Punching of Hole at Counter & Dispatch table for EPOS
Cabling of Counter & Dispatch table
Installation of POS Servers, Printers, & Touch Screens
BIR - COR for programming of EPOS (Company Name & TIN Number)
Tapping of Lotus Notes to POS (applicable to SM Stores)
Submission of Warranty Certificates (for SM Stores)

Lighting: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Wall Lamps
Installation of Prismatic Fluorescent Lights
Installation of Droplights
Installation of Counter Area Pin Lights
Installation of Counter Area Cove Lights
Installation of Lights Switches

Appliances Installation: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of TV RCA wiring
Installation of wall mounted Flat Screen TV
Installation of DVD & Component system at counter area
Installation of speakers at C-purlins area
Installation of Hand Dryers

Other Furniture & Fixtures: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Installation of Hand Soap Dispenser
Installation of Fire Extinguishers
Tables & Chairs Delivery
Delivery of Tools & Utensils (c/o Opening Team)

Beverage Dispensers: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Delivery & Installation of Pepsi / Coke refrigerator
Delivery & Installation of Soft drinks dispenser
Delivery & Installation of Soft drinks figals & CO2 tanks
Delivery & Installation of Pineapple Juice dispenser
Delivery & Installation of Iced Tea dispenser

Clearing & Hauling: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Hauling of Debris
Hauling of debris at ceiling (if applicable)
Return of Excess Construction Materials to Harrison branch storage room
Cleaning of Site by Contractor

Punch listing & Operations Turnover: 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Run-through of all equipment
Punch listing of deficiencies 5 days prior to Opening Day
Rectification of punch listed deficiencies
Request for payment for Labor Contractor's 10% retention fee (30 days)
DATE OF VISIT
PROJECT MANAGER
CONTRACTOR / FOREMAN
FRANCHISE MANAGING DIRECTOR

MANG INASAL BRANCH SM Rosales, Pangasinan

NOTE: Site should be visited by the Project Manager atleast once (1) a week.
provided by tk inc.
provided by tk inc.
PROJECT PROCESS REVIEW

TK Branch:
Project Manager:
Contractor:
Area Manager:
Starting Date of Project:
Turn-over Date:
Opening Date:

Evaluate the following Objectives:

1.) Performance was ON TARGET BELOW TARGET ABOVE TARGET

2.) Budget was ON TARGET OVER SPENT UNDER SPENT

3.) Schedule was ON TARGET BEHIND AHEAD

Overall, was the project a success? YES NO

If not, what factors contributed to a negative evaluation?

What was done really well?

What could have been done better?

What recommendations would you make for future project application?

What would you do differently if you could do it over?


What have you learned that can be applied to future projects?
PUNCH LIST TEMPLATE

PROJECT: ________________________________ DATE: ______________________

ITEMS FOR RECTIFICATION


(Please use another sheet if necessary)

Deficiency Target Date Person


_______________________ ______________________
PROJECT MANAGER CONTRACTOR

_______________________ ______________________
AREA MANAGER / FRANCHISEE
OPENING TEAM
PROJECT INFORMATION SHEET

Branch:
Address:

Starting Date of Project:


Turn-over Date:
Opening Date:

Project Cost:

Project Manager:
Lessor / Building Administrator:
Mang Inasal Architect:
Cad Operator Designer:
Business Permits Staff:
Franchisee:
Managing Director:
Opening Team Leader:
Area Manager:

Labor Contractor:
Construction Materials Supplier
Blowers Fabricators
Exhaust & Fresh Air Ducting Installation
Stainless Steel Fabricator & Installation
Spark Arrestor Fabricator
Upright Chillers & Freezers Fabricator
Chest Type Freezer & Refrigerator
Glass Works & Mirrors
Roll-up Shutter
Gas Line Installation
LPG Gas Supplier
Aircon Supplier
Aircon Installation
Sprinkler System
Water Proofing
Flat Screen TV
DVD Player
Component
Tables & Chairs
POS System
Signage, Menu Board, Murals
Drop Lights
Tigbao Sticks
Tools & Utensils
Project Management - Job Information

PROJECT MANAGEMENT

Job Scope (Step-by-step process flow):

1.) Conducts site ocular and measurements.


2.) Meets with building / Mall Lessor for coordination of needed requirements.
3.) Ensures availability of basic necessities prior to construction (3 phase electricity, feeder line,
water source, LPG gas source, telephone line, Lessor's business permits, etc.).
4.) Update BDG Project Management Head on status of initial site inspection.
5.) Coordinate with Design Department for planning of blueprints.
6.) Ensures completion of Construction Cost Estimate (CE).
7.) Ensures signing of Lease Contract & Payment of initial rent.
8.) Submission of Blueprints to Lessor / Mall admin for revisions and approval.
9.) Creates Gantt Chart for proper planning of construction timeline.
10.) Sets meeting with contractor / sub-contractors for signing of award notice / approval of quotations.
11.) Conducts meeting with contractor & construction materials supplier for proper ordering of materials.
12.) Conducts Pre-construction meeting with contractors, sub-contractors, Lessor, and franchisee.

Things to be discussed during the pre-construction meeting:


a.) Technical concerns based on Blueprint & ocular inspection.
b.) Bill of materials
c.) Project cost (contractor's fee)
d.) Gantt Chart & Timelines
e.) Signing of contracts
f.) Quotations of sub-contractors
g.) Coordination between sub-contractors & delivery / installation dates

13.) Prepares administrative tasks such as CARI, Construction Bond, CGLI, etc.
14.) Prepares quotations for approval & signing of BDG Project Management Head & BDG - VP.
15.) Prepares Purchase Orders (PO) for sub-contractors to begin work.
16.) Prepares request for payment for Down Payment of contractors & sub-contractors.
17.) Coordination with Human Resource Department for hiring of Management Team & Service Crews.
18.) Ensures timely delivery of construction materials (3 deliveries).
19.) Conducts construction site visits at least once (1) a week using SVO form.
20.) Coordinates with all the teams involved to resolve problems being encountered.
21.) Coordinates with sub-contractors to ensure that delivery & installation dates are on track.
22.) Coordinate with contractor's engineers & foreman to ensure timely construction of site.
23.) Coordinates with Operations Manager & Area Manager on status of the site.
24.) Updates BDG Project Management Head on status of the project.
25.) Updates Franchisee on the status of the project.
26.) Conducts Status Meeting upon 50% completion of the project with the Contractor, Franchisee,
Area Manager, & BDG Project Management Head

Things to be discussed during the 50% completion status meeting:


a.) Problems encountered.
b.) Deviations vs. Blueprint
c.) Possible delays
d.) Solutions offered to rectify such problems
27.) Schedules Turn-over date and coordinate it with Project Mgt Head, Contractor, Ops Dept., Franchisee
28.) Ensures that debris are hauled by contractor & site is cleaned by contractor's personnel
29.) Run through off all equipment and checking for defects during turn-over.
30.) Punchlisting of deficiencies during turn-over.
31.) Coordination with concerned personnel on rectification of punchlisted deficiencies.
32.) Coordinates signing of job completion report of all contractors & sub-contractors with Ops Dept.
33.) Releasing of Retention Fees and Balance Payment of contractors & sub-contractors.
BRANCH:
TEAM DIRECTORY:

Area of Concern Contact Person Contact Number


Project Manager
Lessor
Franchisee / Managing Director
Architect
Accounting
Human Resource Department
Labor Contractor / Foreman
Construction Materials Supplier
Operations Manager
Area Manager
Blowers Fabricators
Exhaust & Fresh Air Ducting Installation
Stainless Steel
Spark Arrestor Fabricator
Upright Chillers & Freezers
Chest Type Freezer & Refrigerator
Glass Works & Mirrors
Roll-up Shutter
Gas Line Installation
LPG Gas Supplier
Aircon Supplier
Aircon Installation
Sprinkler System
Water Proofing
Flat Screen TV
DVD Player
Component
Tables & Chairs
POS System
Signage, Menu Board, Murals
Drop Lights

Tools & Utensils


Meter Base & 3 Phase Meter
Electric Feeder Line
Magnetic Starter Supplier
Hand Dryers
DETAILED CONSTRUCT
PRE-CON
1 2 3 4 5 1
Pre-Construction Preparations:
Signing of Lease Contract
Completion of Construction Cost Estimate (CE)
Initial Rental payment
Update Operations Department of approved site
Submission of Blueprints to Lessor for approval
Implementation of Revised and Approved Plans by Lessor
Checking & documentation of Lessor's Business Permits
Checking & documentation of Lessor's Tax Declaration Certificate
Checking of 3 Phase Electricity Availability
Check for Availability of Feeder Line
Check for Availability of Telephone Line
Check for Availability of Water Tapping Source
Check if LPG gas source is centralized or LPG Tanks shall be needed
Check if Ali Mall, fabrication of Kitchen Hood must be Self Compensating
Check if Meter Base & Meter shall be provided by Lessor
Check if Water Meter shall be provided by Lessor
Completion of Timeline (Gantt Chart)
Awarding of Contracts to all Contractors & Sub-contractors
Signing of Contractors (Labor) contract
Request for payment for Down Payment
Ordering of Construction Materials
Boarding-up of site
Installation of "Soon to Open" 8X8 sized tarpaulin

Administrative Tasks:
Payment of Construction Bond (if applicable)
Payment of CARI - Comprehensive All Risk Insurance (if applicable)
Payment of CGLI - Comprehensive General Liability Insurance (if applicable)
Printing of As Built Plans
Hiring of Management Team & Service Crews
Request for payment for Balance payment

Quotations, Purchase Orders, & Request for Payment:


3 Units Exhaust Blowers
Ducting Installation
Air-conditioning Units Installation
Sprinkler System Installation
Stainless Steel Equipment, Chillers, Freezers
Chest Type Freezers
Refrigerators
Glass Panel
Mirrors
Roll-up Shutter
Tables & Chairs (see blueprint for number of T&C)
Gas line Installation
LPG Supply
Air-conditioning Units
Wall Mounted Flat Screen TV
DVD System
Component with Speakers
Point of Sale System (EPOS)
Signage
Menu Board
Murals
Tools & Utensils
Droplights (see Blueprint for number & size of Droplights)

PRE-CON
1 2 3 4 5 1
Construction Materials:
First Delivery (Masonry Construction Materials)
Second Delivery (Carpentry Materials)
Third Delivery (Finishing Materials)
Hand Dryers
RCA Wires
Speaker Wires
Magnetic Starters
Electric Meter Base & Meter
Panel Board
Circuit Breakers
Feeder Line
Water Meter

Masonry Works:
CHB (Concrete Hollow Blocks) laying for partitions
CHB (Concrete Hollow Blocks) plastering
Electrical Lines Provisions
Plumbing & Water Lines Provisions
Drainage Lines Provisions
Water Proofing of Floor Area (if applicable)
Kitchen Wall Tiles Installation
Kitchen Wall Tiles Grouting
Kitchen Floor Tiles Installation
Kitchen Floor Tiles Grouting
Installation of Pass Through Window at Kitchen wall area
Dining Walls Plastering
Dining Floor Tiles Installation
Dining Floor Tiles Grouting
Installation of Brick Wall at Grill Area
Grouting of Bricks at Grill Area
Installation of Bricks at Column Posts
Grouting of Bricks at Column Posts
Check all Floor Tiles for Loose Grouting
Check all Floor Tiles for Air Spaces (Do Re-tiling)

General Electrical Works:


Installation of Temporary Meter (for construction use)
Installation of Electric Feeder line (if applicable)
Telephone Line Installation
Electrical layout & provisions
Installation of Fixed Electric Meter Base
Installation of Fixed Electric Meter
Permanent Tapping of Electrical Lines
Electric Meter Accuracy Test Certificate
Installation of Electrical Panel Boards
Installation of Electrical Circuit Breakers
Labeling of Circuit Breakers
Electrical Loading Certificate
Installation of Electrical Sockets
Installation of Lights Switches

General Plumbing Works:


Laying of Water Lines
Laying of Drainage Lines
Floor Drainage Installation
Soft drink dispenser drainage
Testing of Sink & Floor Drainage for clogging
Water Meter Installation
Water Meter tapping
Water Meter accuracy test certificate
PRE-CON
1 2 3 4 5 1
Wash Area Lavatory:
Installation of Granite Slabs at Wash Area Lavatory
Installation of Sinks & Faucets at Wash Area Lavatory
Grouting of Granite Slabs at Wash Area Lavatory

Comfort Room & Utility Room Area:


CR wall & floor tiling
Installation of CR Wash Sink
Installation of CR Urinal
Installation of CR Toilet Bowl
Installation of CR Tissue Holder
Installation of CR Hand Soap Dispenser
Installation of Slop Sink

Carpentry Works (Counter Table):


Fabrication of counter table
Fabrication of counter table shelves divisions
Sanding and Plastering of Counter Table shelves & cabinets
Painting of Counter Table with Green paint using Air Compressor Spray
Installation of Granite Slabs at Counter Table
Grouting of Granite Slabs at Counter Table
Punching of holes at Granite Slabs of Counter table for cabling of EPOS

Carpentry Works (Dispatch Table):


Fabrication of dispatch table
Fabrication of dispatch table shelves divisions
Sanding and Plastering of Dispatch Table shelves & cabinets
Painting of Dispatch Table with Green paint using Air Compressor Spray
Installation of Granite Slabs at Dispatch Table
Grouting of Granite Slabs at Dispatch Table
Punching of holes at Granite Slabs of Dispatch table for cabling of EPOS

Carpentry Works (Office Shelves):


Fabrication of Office shelves and cabinets
Sanding and Plastering of Office shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Stockroom Shelves):


Fabrication of Stockroom shelves and cabinets
Sanding and Plastering of Stockroom shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Locker Cabinets):


Fabrication of Locker Cabinets
Sanding and Plastering of Locker Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Locks and Handles

Carpentry Works (Condiments Cabinets):


Fabrication of Condiments Cabinets
Sanding and Plastering of Condiments Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs on top of Condiments Cabinet
Grouting of Granite Slabs

Carpentry Works (False Windows):


Fabrication of False Window
Sanding of False Window
Installation of False Window at wall area
Installation of Back Lighting at False Window
Varnishing of False Window using Air Compressor Spray

PRE-CON
1 2 3 4 5 1
Carpentry Works (CR & Wash Area Mirror Frames):
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors

Carpentry Works (Wooden Beams):


Fabrication of Wooden Beams
Sanding of Wooden Beams
Installation of Wooden Beams at ceiling area
Varnishing of Wooden Beams with Brown paint using Air Compressor Spray
Ceiling:
Installation of C-purlins
Plastering of C-purlins
Painting of C-purlins with Orange Enamel Paint
Ceiling Installation (if applicable)
Installation of Manholes at Ceiling (if applicable)

General Painting Works:


Painting of Ceiling with Black Flat enamel Paint
Painting of Ducting with Black Flat enamel paint
Painting of Walls Mango Orange & Green semi-gloss paint

Mechanical Works:
Ducting fabrication for Exhaust
Ducting installation for Exhaust
Ducting fabrication for Fresh Air
Ducting installation for Fresh Air
Installation of Manholes / Hand holes at exhaust for cleaning
Installation of CR Exhaust
Installation of Office Exhaust
Delivery of 3 units Blowers
Installation of Exhaust Blower
Installation of Fresh Air Blower
Installation of Back-up Blower
Installation of ducting Droppings to Hood
Installation Fresh Air Vents & Grills
Insulation of Exhaust with asbestos / fiberglass insulation
Painting of Ducting with Black Flat enamel paint
Delivery of 3 units Magnetic Starters
Installation of 3 Magnetic Starters (Exhaust, Fresh Air, & Back-up blower)
Tapping of electrical lines for Magnetic Starters
Testing of all 3 Blowers

Air-conditioning System:
Aircon Delivery
Aircon Installation
Aircon drainage installation
Aircon drainage insulation
Aircon drainage painting
Testing of Air-conditioning units
Air Balancing Certificate (applicable to SM stores)

Sprinkler System:
Draining of Sprinkler system to allow installation of heads
Installation of Sprinkler Heads
Installation of Sprinkler Caps
Installation of Sprinkler Heads with 200 degrees heads for Kitchen Area
Painting of Sprinkler Pipes and Heads with Black Flat enamel paint

PRE-CON
1 2 3 4 5 1
Stainless Steel Works:
Delivery of Grill & Kitchen Hoods
Installation of Hoods
Installation of Spark Arrestor
Installation of Baffle Filters
Installation of Stainless Steel Equipment
Installation of Chicken Holding Cabinet
Installation of Preparations Tables
Punching of soft drink dispenser hose area at stainless steel table
Installation of Sinks & drainage
Installation of Pass Through stainless steel sidings
Installation of Utensils Racks
Installation of Stainless Steel Racks
Lighting & toggle switch at stainless steel hood
Charcoal Bin installation underneath Grill Area

Chillers & Freezers:


Delivery of Chest Type Freezer
Delivery of Refrigerator
Delivery of 4 Door Upright Chillers & Freezers
Installation of Upright Chillers & Freezers
Drainage installation of Chillers & Freezers

Gas line:
Installation of Gas line
Installation of Gas line Meter
Installation of Safety Device (1 pc. - Non SM site / 6 pcs. - SM branches)
Nitrogen Leak test
Bubble Leak Test
Welding of all gas line joints and treads
Tapping of LPG Gas line to main line (if centralized)
Painting of Yellow Paint for gas line
Gas Room Fabrication (if applicable)
LPG Gas Tanks delivery (if non centralized)

Glass Panel & Roll-up Shutter:


Installation of Glass Panel
Application of Silicon sealant at Glass Panel
Installation of Roll-up Shutter
Painting of Roll-up Shutter

Signage, Menu Board, & Murals


Fabrication of Menu Board Hardiflex Back Boarding (c/o Contractor)
Measurement of Signage, Mural, & Menu Board
Installation of Signage
Installation of Menu Board
Installation of Murals
Installation of Glass Panel Sticker Strip

Point of Sale System:


Punching of Hole at Counter & Dispatch table for EPOS
Cabling of Counter & Dispatch table
Installation of POS Servers, Printers, & Touch Screens
BIR - COR for programming of EPOS (Company Name & TIN Number)
Tapping of Lotus Notes to POS (applicable to SM Stores)
Submission of Warranty Certificates (for SM Stores)

Lighting:
Installation of Wall Lamps
Installation of Prismatic Fluorescent Lights
Installation of Droplights
Installation of Counter Area Pin Lights
Installation of Counter Area Cove Lights
Installation of Lights Switches

PRE-CON
1 2 3 4 5 1
Appliances Installation:
Installation of TV RCA wiring
Installation of wall mounted Flat Screen TV
Installation of DVD & Component system at counter area
Installation of speakers at C-purlins area
Installation of Hand Dryers

Other Furniture & Fixtures:


Installation of Hand Soap Dispenser
Installation of Fire Extinguishers
Tables & Chairs Delivery
Delivery of Tools & Utensils (c/o Opening Team)

Beverage Dispensers:
Delivery & Installation of Pepsi / Coke refrigerator
Delivery & Installation of Soft drinks dispenser
Delivery & Installation of Soft drinks figals & CO2 tanks
Delivery & Installation of Pineapple Juice dispenser
Delivery & Installation of Iced Tea dispenser

Clearing & Hauling:


Hauling of Debris
Hauling of debris at ceiling (if applicable)
Return of Excess Construction Materials to Harrison branch storage room
Cleaning of Site by Contractor

Punch listing & Operations Turnover:


Run-through of all equipment
Punch listing of deficiencies 5 days prior to Opening Day
Rectification of punch listed deficiencies
Request for payment for Labor Contractor's 10% retention fee

NOTE: Strictly follow Gantt Chart schedule… Any delay

Mang Inasal Branch:


Project Manager:
Contractor:
Managing Director:
Area Manager:
Starting Date of Project:
Turn-over Date:
Opening Date:
ILED CONSTRUCTION TIME FRAME - GANTT CHART
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CONSTRUCTION PROPER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
edule… Any delay cost shall be charged to contractor / sub-contractor who have caused the delay…
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
TURN-OVER
29 30 31 32 33 34 35 1 2 3 4 5 6 7 8
he delay…
PROJECT COST COMPAR

Awarded Items TK ALIMALL Site 2


Labor Contractor
Construction Materials
Blowers Fabrication
Exhaust Installation
Spark Arrestor Fabrication
Stainless Steel Quotation
Upright Chiller
4-Door Freezer
Sanyo Refrigerator
Chest Type Freezer
Glass Panel
Mirror Installation
Roll-up Shutter
Gas Line Installation
Air-conditioning Units
Aircon Installation
Sprinkler System
Flat Screen TV
DVD Player
Component
Tables & Chairs
POS System
Signage, Menu Board, Murals
Drop Lights
Tigbao Sticks
Tools & Utensils
PROJECT COST COMPARISON MATRIX

Site 3 Site 4 Site 5


PUNCH LIST TEMPLATE

PROJECT: ________________________________ DATE: ______________________

ITEMS FOR RECTIFICATION


(Please use another sheet if necessary)

Deficiency Target Date Person


_______________________ ______________________
PROJECT MANAGER CONTRACTOR

_______________________ ______________________
AREA MANAGER / FRANCHISEE
OPENING TEAM
PROJECT PROCESS REVIEW

Mang Inasal Branch:


Project Manager:
Contractor:
Area Manager:
Starting Date of Project:
Turn-over Date:
Opening Date:

Evaluate the following Objectives:

1.) Performance was ON TARGET BELOW TARGET ABOVE TARGET

2.) Budget was ON TARGET OVER SPENT UNDER SPENT

3.) Schedule was ON TARGET BEHIND AHEAD

Overall, was the project a success? YES NO

If not, what factors contributed to a negative evaluation?

What was done really well?

What could have been done better?

What recommendations would you make for future project application?

What would you do differently if you could do it over?


What have you learned that can be applied to future projects?
SITE VISIT OBSERVATION - CHECKLIST

CONSTRUCTIO
Pre-Construction Preparations: 1st 2nd 3rd
Signing of Lease Contract
Singing of Franchise Contract (if Franchised outlet)
Completion of Construction Cost Estimate (CE)
Initial Rental payment
Update Operations Department of approved site (Sherlane Piscos & Area Manager)
Submission of Blueprints to Lessor for approval
Implementation of Revised and Approved Plans by Lessor
Checking & documentation of Lessor's Business Permits
Checking & documentation of Lessor's Tax Declaration Certificate
Checking of 3 Phase Electricity Availability
Check for Availability of Feeder Line
Check for Availability of Telephone Line
Check for Availability of Water Tapping Source
Check if LPG gas source is centralized or LPG Tanks shall be needed
Check if SM Malls, fabrication of Kitchen Hood must be Self Compensating
Check if Meter Base & Meter shall be provided by Lessor
Check if Water Meter shall be provided by Lessor
Completion of Timeline (Gantt Chart)
Awarding of Contracts to all Contractors & Sub-contractors
Signing of Contractors (Labor) contract
Request for payment for Down Payment
Ordering of Materials (include Hand Dryers, RCA Wires, Magnetic Starter, Meters)
Boarding-up of site
Installation of "Soon to Open" 8X8 sized tarpaulin

Administrative Tasks: 1st 2nd 3rd


Payment of Construction Bond (if applicable)
Payment of CARI - Comprehensive All Risk Insurance (if applicable)
Payment of CGLI - Comprehensive General Liability Insurance (if applicable)
Payment of P8,000 fee for Lotus Notes (applicable to SM Stores)
Printing of As Built Plans
Hiring of Management Team & Service Crews
Request for payment for Balance payment

Quotations, Purchase Orders, & Request for Payment: 1st 2nd 3rd
3 Units Exhaust Blowers
Ducting Installation
Air-conditioning Units Installation
Sprinkler System Installation
Stainless Steel Equipment, Chillers, Freezers
Chest Type Freezers
Refrigerators
Glass Panel
Mirrors
Roll-up Shutter
Tables & Chairs (see blueprint for number of T&C)
Gas line Installation
LPG Supply
Air-conditioning Units
Wall Mounted Flat Screen TV
DVD System
Component with Speakers
Point of Sale System (EPOS)
Signage
Menu Board
Murals
Tools & Utensils
Droplights (see Blueprint for number & size of Droplights)
Tigbao Sticks

Construction Materials: 1st 2nd 3rd


First Delivery (Masonry Construction Materials)
Second Delivery (Carpentry Materials)
Third Delivery (Finishing Materials)
Hand Dryers
RCA Wires
Speaker Wires
Magnetic Starters
Electric Meter Base & Meter
Panel Board
Circuit Breakers
Feeder Line
Water Meter

Masonry Works: 1st 2nd 3rd


CHB (Concrete Hollow Blocks) laying for partitions
CHB (Concrete Hollow Blocks) plastering
Electrical Lines Provisions
Plumbing & Water Lines Provisions
Drainage Lines Provisions
Water Proofing of Floor Area (if applicable)
Kitchen Wall Tiles Installation
Kitchen Wall Tiles Grouting
Kitchen Floor Tiles Installation
Kitchen Floor Tiles Grouting
Installation of Pass Through Window at Kitchen wall area
Dining Walls Plastering
Dining Floor Tiles Installation
Dining Floor Tiles Grouting
Installation of Brick Wall at Grill Area
Grouting of Bricks at Grill Area
Installation of Bricks at Column Posts
Grouting of Bricks at Column Posts
Check all Floor Tiles for Loose Grouting
Check all Floor Tiles for Air Spaces (Do Re-tiling)

General Electrical Works: 1st 2nd 3rd


Installation of Temporary Meter (for construction use)
Installation of Electric Feeder line (if applicable)
Telephone Line Installation
Electrical layout & provisions
Installation of Fixed Electric Meter Base
Installation of Fixed Electric Meter
Permanent Tapping of Electrical Lines
Electric Meter Accuracy Test Certificate
Installation of Electrical Panel Boards
Installation of Electrical Circuit Breakers
Labeling of Circuit Breakers
Electrical Loading Certificate
Installation of Electrical Sockets
Installation of Lights Switches

General Plumbing Works: 1st 2nd 3rd


Laying of Water Lines
Laying of Drainage Lines
Floor Drainage Installation
Soft drink dispenser drainage
Testing of Sink & Floor Drainage for clogging
Water Meter Installation
Water Meter tapping
Water Meter accuracy test certificate

Wash Area Lavatory: 1st 2nd 3rd


Installation of Granite Slabs at Wash Area Lavatory
Installation of Sinks & Faucets at Wash Area Lavatory
Grouting of Granite Slabs at Wash Area Lavatory

Comfort Room & Utility Room Area: 1st 2nd 3rd


CR wall & floor tiling
Installation of CR Wash Sink
Installation of CR Urinal
Installation of CR Toilet Bowl
Installation of CR Tissue Holder
Installation of CR Hand Soap Dispenser
Installation of Slop Sink

Carpentry Works (Counter Table): 1st 2nd 3rd


Fabrication of counter table
Fabrication of counter table shelves divisions
Sanding and Plastering of Counter Table shelves & cabinets
Painting of Counter Table with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs at Counter Table
Grouting of Granite Slabs at Counter Table
Punching of holes at Granite Slabs of Counter table for cabling of EPOS

Carpentry Works (Dispatch Table): 1st 2nd 3rd


Fabrication of dispatch table
Fabrication of dispatch table shelves divisions
Sanding and Plastering of Dispatch Table shelves & cabinets
Painting of Dispatch Table with Green paint using Air Compressor Spray
Installation of Granite Slabs at Dispatch Table
Grouting of Granite Slabs at Dispatch Table
Punching of holes at Granite Slabs of Dispatch table for cabling of EPOS
Carpentry Works (Office Shelves): 1st 2nd 3rd
Fabrication of Office shelves and cabinets
Sanding and Plastering of Office shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Stockroom Shelves): 1st 2nd 3rd


Fabrication of Stockroom shelves and cabinets
Sanding and Plastering of Stockroom shelves & cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray

Carpentry Works (Locker Cabinets): 1st 2nd 3rd


Fabrication of Locker Cabinets
Sanding and Plastering of Locker Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Locks and Handles

Carpentry Works (Condiments Cabinets): 1st 2nd 3rd


Fabrication of Condiments Cabinets
Sanding and Plastering of Condiments Cabinets
Painting of Shelves with Green enamel paint using Air Compressor Spray
Installation of Granite Slabs on top of Condiments Cabinet
Grouting of Granite Slabs

Carpentry Works (False Windows): 1st 2nd 3rd


Fabrication of False Window
Sanding of False Window
Installation of False Window at wall area
Installation of Back Lighting at False Window
Varnishing of False Window using Air Compressor Spray

Carpentry Works (CR & Wash Area Mirror Frames): 1st 2nd 3rd
Fabrication of Mirror frames
Sanding of Mirror Frames
Installation of Mirror Frames at wall area
Varnishing of Mirror Frames using Air Compressor Spray
Installation of Mirrors

Carpentry Works (Wooden Beams): 1st 2nd 3rd


Fabrication of Wooden Beams
Sanding of Wooden Beams
Installation of Wooden Beams at ceiling area
Varnishing of Wooden Beams with Brown paint using Air Compressor Spray

Ceiling: 1st 2nd 3rd


Installation of C-purlins
Plastering of C-purlins
Painting of C-purlins with Orange Enamel Paint
Ceiling Installation (if applicable)
Installation of Manholes at Ceiling (if applicable)

General Painting Works: 1st 2nd 3rd


Painting of Ceiling with Black Flat enamel Paint
Painting of Ducting with Black Flat enamel paint
Painting of Walls Mango Orange & Green semi-gloss paint

Mechanical Works: 1st 2nd 3rd


Ducting fabrication for Exhaust
Ducting installation for Exhaust
Ducting fabrication for Fresh Air
Ducting installation for Fresh Air
Installation of Manholes / Hand holes at exhaust for cleaning
Installation of CR Exhaust
Installation of Office Exhaust
Delivery of 3 units Blowers
Installation of Exhaust Blower
Installation of Fresh Air Blower
Installation of Back-up Blower
Installation of ducting Droppings to Hood
Installation Fresh Air Vents & Grills
Insulation of Exhaust with asbestos / fiberglass insulation
Painting of Ducting with Black Flat enamel paint
Delivery of 3 units Magnetic Starters
Installation of 3 Magnetic Starters (Exhaust, Fresh Air, & Back-up blower)
Tapping of electrical lines for Magnetic Starters
Testing of all 3 Blowers

Air-conditioning System: 1st 2nd 3rd


Aircon Delivery
Aircon Installation
Aircon drainage installation
Aircon drainage insulation
Aircon drainage painting
Testing of Air-conditioning units
Air Balancing Certificate (applicable to SM stores)

Sprinkler System: 1st 2nd 3rd


Draining of Sprinkler system to allow installation of heads
Installation of Sprinkler Heads
Installation of Sprinkler Caps
Installation of Sprinkler Heads with 200 degrees heads for Kitchen Area
Painting of Sprinkler Pipes and Heads with Black Flat enamel paint

Stainless Steel Works: 1st 2nd 3rd


Delivery of Grill & Kitchen Hoods
Installation of Hoods
Installation of Spark Arrestor
Installation of Baffle Filters
Installation of Stainless Steel Equipment
Installation of Chicken Holding Cabinet
Installation of Preparations Tables
Punching of soft drink dispenser hose area at stainless steel table
Installation of Sinks & drainage
Installation of Pass Through stainless steel sidings
Installation of Utensils Racks
Installation of Stainless Steel Racks
Lighting & toggle switch at stainless steel hood
Charcoal Bin installation underneath Grill Area

Chillers & Freezers: 1st 2nd 3rd


Delivery of Chest Type Freezer
Delivery of Refrigerator
Delivery of 4 Door Upright Chillers & Freezers
Installation of Upright Chillers & Freezers
Drainage installation of Chillers & Freezers

Gas line: 1st 2nd 3rd


Installation of Gas line
Installation of Gas line Meter
Installation of Safety Device (1 pc. - Non SM site / 6 pcs. - SM branches)
Nitrogen Leak test
Bubble Leak Test
Welding of all gas line joints and treads
Tapping of LPG Gas line to main line (if centralized)
Painting of Yellow Paint for gas line
Gas Room Fabrication (if applicable)
LPG Gas Tanks delivery (if non centralized)

Glass Panel & Roll-up Shutter: 1st 2nd 3rd


Installation of Glass Panel
Application of Silicon sealant at Glass Panel
Installation of Roll-up Shutter
Painting of Roll-up Shutter

Signage, Menu Board, & Murals 1st 2nd 3rd


Fabrication of Menu Board Hardiflex Back Boarding (c/o Contractor)
Measurement of Signage, Mural, & Menu Board as per approved signage plan
Installation of Signage
Installation of Menu Board
Installation of Murals
Installation of Glass Panel Sticker Strip

Point of Sale System: 1st 2nd 3rd


Punching of Hole at Counter & Dispatch table for EPOS
Cabling of Counter & Dispatch table
Installation of POS Servers, Printers, & Touch Screens
BIR - COR for programming of EPOS (Company Name & TIN Number)
Tapping of Lotus Notes to POS (applicable to SM Stores)
Submission of Warranty Certificates (for SM Stores)

Lighting: 1st 2nd 3rd


Installation of Wall Lamps
Installation of Prismatic Fluorescent Lights
Installation of Droplights
Installation of Counter Area Pin Lights
Installation of Counter Area Cove Lights
Installation of Lights Switches

Appliances Installation: 1st 2nd 3rd


Installation of TV RCA wiring
Installation of wall mounted Flat Screen TV
Installation of DVD & Component system at counter area
Installation of speakers at C-purlins area
Installation of Hand Dryers

Other Furniture & Fixtures: 1st 2nd 3rd


Installation of Hand Soap Dispenser
Installation of Fire Extinguishers
Tables & Chairs Delivery
Delivery of Tools & Utensils (c/o Opening Team)

Beverage Dispensers: 1st 2nd 3rd


Delivery & Installation of Pepsi / Coke refrigerator
Delivery & Installation of Soft drinks dispenser
Delivery & Installation of Soft drinks figals & CO2 tanks
Delivery & Installation of Pineapple Juice dispenser
Delivery & Installation of Iced Tea dispenser

Clearing & Hauling: 1st 2nd 3rd


Hauling of Debris
Hauling of debris at ceiling (if applicable)
Return of Excess Construction Materials to Harrison branch storage room
Cleaning of Site by Contractor

Punch listing & Operations Turnover: 1st 2nd 3rd


Run-through of all equipment
Punch listing of deficiencies 5 days prior to Opening Day
Rectification of punch listed deficiencies
Request for payment for Labor Contractor's 10% retention fee (30 days)

DATE OF VISIT
PROJECT MANAGER
CONTRACTOR / FOREMAN
FRANCHISE MANAGING DIRECTOR

NOTE: Site should be visited by the Project Manager atleast once (1) a week.
LIST

CONSTRUCTION SITE VISITS


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th


4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

4th 5th 6th 7th 8th 9th 10th

Das könnte Ihnen auch gefallen