Wilfredo Rollorata has over 20 years of experience in construction projects as a general builder. He has worked on numerous residential and commercial buildings, as well as public infrastructure projects. Some of the key projects he worked on include the construction of public school buildings, residential towers, and a public market. In these roles, he was responsible for supervising workers, ensuring project timelines were met, and reporting to project managers.
Originalbeschreibung:
STE
Originaltitel
AFFIDAVIT OF STE CONSTRUCTION WORK EXPERIENCE approved by DTI PCAB
Wilfredo Rollorata has over 20 years of experience in construction projects as a general builder. He has worked on numerous residential and commercial buildings, as well as public infrastructure projects. Some of the key projects he worked on include the construction of public school buildings, residential towers, and a public market. In these roles, he was responsible for supervising workers, ensuring project timelines were met, and reporting to project managers.
Wilfredo Rollorata has over 20 years of experience in construction projects as a general builder. He has worked on numerous residential and commercial buildings, as well as public infrastructure projects. Some of the key projects he worked on include the construction of public school buildings, residential towers, and a public market. In these roles, he was responsible for supervising workers, ensuring project timelines were met, and reporting to project managers.
Province of ______________) City/Municipality of ________) S.S
I, ______________Wilfredo Rollorata______________, single/married, Filipino, of legal age, with postal address at
_______________________Door 1, Ybanez Compund, Mambaling Cebu City _________________________, having been duly sworn in accordance with law depose and say that the projects enumerated below constitute my full & complete construction experience.
Name and Work Nature/Scope of Work Project Duration
Complete Address of Employer/ Classification Assignment (mm/dd/yyyy) Name & Location of Projects Undertaken (GE, GB, SP) (Proj. Engr.) From To 1.) Employeer: Taguibo Duties & Construction, Cebu City Responsibiliti es: Project: Construction of Type A Public Directly school buildings at San Fernando, supervised Cebu the workers Feb. 1993 Dec. 1993 GB from start of the project up to punchlisting & turnover. I checked that the work is not delayed compared to the time schedule. Supervised also the electrical works including the A/c installation and piping works. Make a daily report & submit to my project manager.
2.) Employeer: Taguibo Construction, Duties &
Cebu City Responsibiliti GB es: Project: Construction of 3-storey Directly May 1993 Oct. 1994 residential building in Mactan Cebu supervised City the workers from start of the project up to punchlisting & turnover. I checked that the work is not delayed compared to the time schedule. Supervised also the electrical works including the A/c installation and piping works. Make a daily report & submit to my project manager.
3.) Employeer: Taguibo Construction, Duties &
Cebu City Responsibiliti GB es: Project: Construction of 3-storey Directly Jan. 1995 Dec. 1995 residential building in Mactan Cebu supervised City the workers Owner: Napocor from start of the project up to punchlisting & turnover. I checked that the work is not delayed compared to the time schedule. Supervised also the electrical works including the A/c installation and piping works. Make a daily report & submit to my project manager.
4.) Employeer: Design Science Duties &
Incorporated (Construction Responsibilities March June 1997 Management and Supervision) , Managed and 1996 Quezon City, Philippines monitor on a GB weekly basis Project: Construction of Public Market the – Panabo, Davao. accomplishm Owner: Local Govt. Unit of Panabo, ents of the Davao. contractors at various projects. Projects that are loaned from the World Bank to the different municipalitie s that avail Of the loan. We the Design Science Inc. are the Consultants for the Government of the Phil. I am assigned as the Project Inspector. My duty is to checked the work of the contractor & make a report after my inspection of the site and send it to the DPWH main office in Manila. I checked the following: the progress of the project must not be delayed compared to the plan. I inspect also the materials used if its according to specifications . I check the quality of works. I checked the laboratory results of all materials used and all samples must meet the specs.
5.) Employeer: Design Science Duties &
Incorporated (Construction Responsibilities Management and Supervision) , Managed and Quezon City, Philippines monitor on a GB weekly basis the May 1997 May 1998 Name of Project: Construction of 2 accomplishment Storey Integrated Jeepney & Bus s of the Terminal & Lodging Houses in contractors at Surigao City, Mindanao. various projects. Projects that are loaned from the World Bank to the different municipalities that avail Of the loan. We the Design Science Inc. are the Consultants for the Government of the Phil. I am assigned as the Project Inspector. My duty is to checked the work of the contractor & make a report after my inspection of the site and send it to the DPWH main office in Manila. I checked the following: the progress of the project must not be delayed compared to the plan. I inspect also the materials used if its according to specifications. I check the quality of works. I checked the laboratory results of all materials used and all samples must meet the specs. 6.) Employeer: Design Science Duties & Incorporated (Construction Responsibilities Management and Supervision), Managed and Quezon City, Philippines monitor on a GE weekly basis the Project: Concreting of 10kilometers accomplishment National Highway Road, Manolo s of the February March 1997 Fortich, Bukidnon contractors at 1996 various projects. Projects that are loaned from the World Bank to the different municipalities that avail Of the loan. We the Design Science Inc. are the Consultants for the Government of the Phil. I am assigned as the Project Inspector. My duty is to checked the work of the contractor & make a report after my inspection of the site and send it to the DPWH main office in Manila. I checked the following: the Duties & 7.)Employeer : L.S. SARMIENTO & Responsibilities: SONS COMPANY INC. – I supervised all PHILIPPINES aspects of work June 1998 Sept. 1999 GE from layout , Project: Concreting of 10 kilometers plotting irrigation systems for rice farms in elevations at Davao area every points. Owner: LGU Davao I checked the work everyday if it is according to plan. Meeting with the municipal engineer to resolve any problem he see at the site. Visits the site regularly and resolve problems that occur during working on a project to avoid possible delays. I am incharge of all the works in the site from excavation to concreting. I checked the work everyday if it is according to plan. Meeting with the municipal engineer to resolve any problem he see 8.)Employeer: ROBLETT Duties & INTERNATIONAL CONSTRUCTION Responsibilities: CORP. - MANDALUYONG, I am incharge of PHILIPPINES GB all the works in the site from 10 May January 11, Project: Construction of Hazardous excavation of 2002 2003 Building footings, concreting of Owner: INTEL, General Trias, foundations, Cavite columns, flooring, up to finishing works like painting. I am always at the site daily giving instructions to workers what to do. I checked up their works if it is according to plan. I make concrete cylinder sample every pouring of concrete. I am also a safety officer at the site. Checking PPEs, permit to work, full body harnessed. I request to the manager tools, meterials, equipments needed at the site. I also checked the electrical & mechanical works if its ok. 9.) Employeer: ROBLETT Duties & INTERNATIONAL CONSTRUCTION Responsibilities: CORP. - MANDALUYONG, I am incharge of PHILIPPINES GB all the works in the site from Name of Project: Decon Chemical excavation of Storage Building Project footings, concreting of February May 15, Owner: INTEL, General Trias, 15, 2003 foundations, 2004 Cavite columns, flooring, up to finishing works like painting. I am always at the site daily giving instructions to workers what to do. I checked up their works if it is according to plan. I make concrete cylinder sample every pouring of concrete. I am also a safety officer at the site. Checking PPEs, permit to work, full body harnessed. I request to the manager tools, meterials, equipments needed at the site. I also checked the electrical & mechanical works if its ok. More than 400 10.) Employeer: Mobily steel towers 60 telecom Co. Saudi Telecom meters height Company & Zain Telecom Greenfield Company. All in Saudi GE, GB, sites Feb. 2007 Sept. Arabia CONSULTING & DESIGN SP constructed all 2014 over Saudi ENGINEERING (CDE) - SAUDI Arabia during ARABIA my 7 years Designer/Main Contractor worked.in the More than 600 steel towers 9 meters height Project: Construction of GSM constructed cellsites during my 7 years work for rooftop sites for GSM operators (STC, MOBILY, ZAIN.) Access roads going to unaccessible mountain sites also constructed. Also constructed were site enclosure fence & site developments for every sites. More than 1000 meters cable trays build ,installation of IBS equipments, antenna poles on rooftops . In charge for all Civil Works in 11.) Employeer: SAUDI the construction NETWORKERS SERVICES of steel towers (SNS) – SAUDI ARABIA GE, SP both Feb. 2005 Nov. 2006 greenfield & Contractor rooftops for Owner: Mobily Telecom Co. GSM operators in the kingdom of Saudi Arabia. 70 rooftop Name of Project: Construction of towers GSM Cellsites completed & 25- Owner: Mobily Telecom Co. 60meters Steel towers completed under my supervision. Access roads were also constructed for unaccessible mountain sites.Also the site fence & site Developments were also made for every sites. Duties & Responsibilities: 12.) Employeer: LEADCOM 1. Site Integrated Solutions, 18 Sept. 02 April Supervisor: Myanmar 2014 2016 - In charge of (Contractor) GB, SP all the constructio Project: Construction of GSM Cellsites n activities Owner: Telenor Telecom from Company layouting , excavation, concreting of Foundation s & Columns of the 60m. height steel towers, concreting of footings, columns of the equipments buildings. Also I supervised the concreting & installations Of the perimeter fences incl. gates for cars & pedestrians gate. I handled the subcons and instructed the workers what to do daily. I also supervises the erection of the 60 meter towers using mobile cranes. I am also responsible for the making of concrete samples ( concrete cylinder) during pouring of concrete and have them check in the laboratory for the compressiv e strength of concrete at 7, 14 & 28 days. I make the punchlist for the works not approved by the consultant & have it repair for the consultant to check & approved. I also make daily activity reports and email to my project manager & to the consultant. I am the safety inspector of the site also.