Sie sind auf Seite 1von 78

PARTNERS FOR

A RCHITECTURE

BUILDING ASSESSMENT REPORT

for the

EXISTING ELEMENTARY SCHOOL BUILDINGS

of

NORWALK PUBLIC SCHOOLS


125 EAST AVENUE
NORWALK, CT 06852

Presented by:
PARTNERS FOR ARCHITECTURE, INC
Architects

APPLIED DATA SERVICES


Enrollment Projections

Presented to:
NORWALK PUBLIC SCHOOLS
125 East Avenue
Norwalk, CT 06852

Report Date:
July 16th, 2010
48 UNION STREET
STAMFORD, CT 06906
P 203\708.0047 F 203\348.4165
WWW.PFARCH.NET
EXISTING BUILDING ASSESSMENT REPORT
for the
NORWALK PUBLIC SCHOOLS
125 EAST AVENUE
NORWALK, CT

AUTHORED BY:

PARTNERS FOR ARCHITECTURE, INC


ARCHITECTURE & PLANNING
48 Union Street
Stamford, CT 06906
(203) 708 0047
Contact: Rainer Schrom, rschrom@pfarch.net
www.pfarch.net

IN ASSOCIATION WITH

APPLIED DATA SERVICES


ENROLLMENT PROJECTIONS
19 Park Place
Flanders, NJ 07836
(973) 584 5578
Contact: Wayne Verderber, ads2@optonline.net
www.applieddataservices.com

1
REPORT CONTENTS

PART 1 PROJECT BACKGROUND

PART 2 SUMMAR OF FINDINGS

PART 3 ARCHITECTURAL

3.1 BROOKSIDE ELEMENTARY SCHOOL


3.2 COLUMBUS MAGNET SCHOOL
3.3 CRANBURY ELEMENTARY SCHOOL
3.4 FOX RUN ELEMENTARY SCHOOL
3.5 JEFFERSON ELEMENTARY SCHOOL
3.6 KENDALL ELEMENTARY SCHOOL
3.7 MARVIN ELEMENTARY SCHOOL
3.8 NARAMAKE ELEMENTARY SCHOOL
3.9 ROWAYTON ELEMENTARY SCHOOL
3.10 SILVERMINE ELEMENTARY SCHOOL
3.11 TRACEY ELEMENTARY SCHOOL
3.12 WOLFPIT ELEMENTARY SCHOOL

3.13 SPACE ASSESSMENT MATRIX


3.14 PROJECTS BUDGET SUMMARY
3.15 MAP OF ELEMENTARY SCHOOLS

PART 4 ELEMENTARY ENROLLMENT PROJECTIONS

2
PART 1
PROJECT BACKGROUND

The City of Norwalk engaged Partners for Architecture to perform a comprehensive


assessment of the Norwalk Public Schools (NPS) as it relates to space utilization,
building capacity, and projected enrollment impact at NPS twelve elementary schools.
The purpose of the assessment is to assist NPS with short and long term facility
planning for better utilization of space within and/or among the buildings to support
the educational and academic goals and requirements established by NPS. This
assessment will be used in part to inform the capital improvement process.

Partners for Architecture (PFA) conducted a comprehensive space utilization and


building capacity review of each of the twelve elementary schools. PFA reviewed all
existing documents and conducted on-site visits of each facility with district officials.
PFA reviewed existing blueprints; schematics; and prior facility assessment reports to
the extent available. To inform our findings and recommendations, PFA prepared floor
plans for all 12 elementary schools reflecting existing spaces as utilized currently by
school personnel. Applied Data Services (ADS) reviewed current elementary enrollment
figures as of March 2010 and prepared enrollment projections to 2014/15 for pre-
kindergarten through 5th grade.

This report will provide an analysis of how the twelve NPS elementary schools are
currently utilizing space; enrollment projections and their impact on space utilization;
and propose recommendations to address space utilization issues to support the
academic and instructional programs. In addition to the narrative below, there are
attached graphical depictions of building floor plans showing current use and
recommended changes with classroom and enrollment distribution box charts;
detailed space utilization grids; and facility deficiencies notes. In addition, you will find
attached Enrollment Projections by school, grade, & year, both historical from 2004 to
projected 2014.

3
PART 2
SUMMARY OF FINDINGS

The scope of the assessment included twelve elementary schools with a total K-5
enrollment of 5,048 students as of March 2010. (See attached Enrollment Projections
by school, grade, & year, both historical from 2004 to projected 2014). Below is a
quick “snapshot” of our findings in table form; and a detailed summary, by school of
current space utilization; enrollment projections impact space; and proposed efficient
space utilization.

School Overall Enrollment Reconfiguration Additional New Addition


Adequately Impact on Proposed Classroom(s) Proposed
Supports Space Needed
Educational
Programs
Brookside No Yes Yes Yes No

Columbus No None Yes Yes Yes


Cranbury No Yes Yes Yes Yes
Fox Run No Yes Yes Yes No
Jefferson No Yes Yes Yes Yes
Kendall No Yes No Yes No
Marvin No Yes No Yes No
Naramake No Yes Yes Yes Yes
Rowayton No Yes Yes Yes Yes
Silvermine Yes None Yes No No
Tracey Yes None No No No
Wolfpit No Yes Yes Yes No

4
BROOKSIDE ELEMENTARY SCHOOL

Overview
Building Area: 58,335 SF
Current Enrollment: 438 students; 22 classrooms
2014 Projected Enrollment: 448; 22 classrooms
Facility Deficiencies: None

Current Space Utilization Analysis


Presently, Brookside has 22 classrooms with dedicated spaces for art, music, strings,
cafeteria, gymnasium, and computer lab. There are dedicated spaces for special
education services, speech, ELL, literacy, psychologist, OT/PT, and social worker. The
school also houses a pre-school program (3 classes) and the “Welcome Center”. (For
additional detail see attached current floor plan, classroom & enrollment distribution
chart, and detailed space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 20 students by
2014. To accommodate this enrollment growth, the following additional classroom(s)
will be required: 2012 (one); 2013 (one); and 2014 (two). (For additional detail see
attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Given enrollment projections, Brookside Elementary School will not adequately
support its educational and academic programs in 2012 and beyond. We
recommend relocating the Welcome Center to an alternative facility.

5
COLUMBUS MAGNET SCHOOL

Overview
Building Area: 63,160 SF
Current Enrollment: 343 students; 17 classrooms
2014 Projected Enrollment: 343; 17 classrooms
Facility Deficiencies: No meeting rooms/conference rooms; gymnasium floor beyond
useful life; ADA deficiencies; lighting in hallways and classrooms inadequate; resource
rooms in closets; psychologist office in elevator shaft; electrical infrastructure
inadequate; parking deficient; bus loading on street.

Current Space Utilization Analysis


Presently, the Columbus Magnet School has 17 classrooms; dedicated art room,
music room, and computer lab. There is a shared cafeteria/gymnasium and the
Academically Talented program (AT), strings, intervention, and ESL share one room.
Also Literacy and ESL share spaces. There are dedicated spaces for the psychologist
and social workers. However, we observed that the resource and psychologist rooms
are located in spaces that were previously used as closets and elevator shaft.
Moreover, the electrical infrastructure does not fully support the current technology
needs. Finally, there are a lack of meeting and conference rooms for teacher group
discussions of student academic needs and for faculty professional development and
training. (For additional detail see attached current floor plan, classroom & enrollment
distribution chart, and detailed space utilization grid and notes.)

Enrollment Projections Impact


Given that this school is a magnet school, enrollment can be controlled. Therefore
enrollment projections over the next five years reveal no student enrollment growth by
2014 and therefore no impact on space utilization. (For additional detail see attached
Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


In effort to improve space utilization, we propose constructing an addition that would
include a cafeteria with kitchen to alleviate the overuse of an already worn
gymnasium, and a second floor addition with two classrooms, allows the school to
add an additional Kindergarten class to balance out all grade levels and create a
cohesive learning environment from K-5th grades. This portion will also include a
much needed resource room and literacy rooms.

6
CRANBURY ELEMENTARY SCHOOL

Overview
Building Area: 45,796 SF
Current Enrollment: 447 students; 22 classrooms
2014 Projected Enrollment: 463; 22 classrooms
Facility Deficiencies: no art room; no music room; no computer lab; shared cafeteria
& gymnasium; inadequate library; lack of storage; lighting in hallways & classrooms
inadequate; ADA deficient; bus/parking/drop off deficiencies

Current Space Utilization Analysis


Cranbury Elementary School has 22 classrooms; no art or music room or computer
lab; shared cafeteria/gymnasium; AT, strings, E-care share a space; special education
services, speech, ESL, literacy, OT/PT, and social worker have dedicated spaces; pre-k
program has 2 classrooms. (For additional detail see attached current floor plan,
classroom & enrollment distribution chart, and detailed space utilization grid and
notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 16 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2010 (one); 2012 (one); 2013 (one); and 2014 (two). (For additional
detail see attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Cranbury Elementary School does not adequately support its educational and
academic programs and the current space utilization is inefficient. We propose to
mitigate these space utilization challenges as follows: 1) relocate the existing pre-k
program to Silvermine Elementary School, which would provide two classroom spaces;
2) relocate the 2nd grade adjacent to the library to the newly vacated pre-k classroom
and some of the resource services to the second newly vacated pre-k classroom; 3)
expand existing library with a new computer lab into the newly vacated 2nd grade and
partially into the courtyard; and 4) construct a new addition to include a music room,
art room, cafeteria, and expanded kitchen.

7
FOX RUN ELEMENTARY SCHOOL

Overview
Building Area: 53,336 SF
Current Enrollment: 449 students; 23 classrooms
2014 Projected Enrollment: 488; 23 classrooms
Facility Deficiencies: No dedicated music room, held on stage; strings held in service
hallway; OT/PT & Project Excel spaces located in cafeteria; storage deficiency
throughout building; lighting in hallways inadequate; and acoustical issues in
cafeteria.

Current Space Utilization Analysis


Fox Run Elementary School has 23 classrooms; dedicated art room and computer lab;
dedicated cafeteria and gymnasium; pre-k program (1 classroom); family resource
room; psychologist and social worker have dedicated spaces; AT, ESL, ELL, Literacy,
OT/PT, and Project Excel share spaces; and no dedicated music room, which currently
takes place on the stage. The strings program is conducted in the service hallway near
the kitchen. The OT/PT and Project Excel program are located in the cafeteria, which
must relocate during lunch hours. (For additional detail see attached current floor
plan, classroom & enrollment distribution chart, and detailed space utilization grid and
notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 39 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2011(one); 2013 (one) and 2014 (one). (For additional detail see
attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Fox Run Elementary School does not adequately support its educational and academic
programs and the current space utilization is inefficient. We would recommend the
following: 1) utilizing the existing empty classroom for expected enrollment growth.

8
JEFFERSON ELEMENTARY SCHOOL

Overview
Building Area: 53,150 SF
Current Enrollment: 538 students; 28 classrooms
2014 Projected Enrollment: 582; 28 classrooms
Facility Deficiencies: 8 temporary classrooms; inadequate interior partitions; resource
services located in inadequate spaces; lack of meeting rooms; parking deficiency;
building entrance insecure; poor ventilation; unsafe operable windows; asphalt
kindergarten playground.

Current Space Utilization Analysis


The Jefferson Magnet School has 28 classrooms; dedicated art and music rooms;
dedicated science room; dedicated spaces for special education services, ESL/ELL,
literacy, and social worker; dedicated “small” computer lab; shared
cafeteria/gymnasium; strings/AT shared on stage; kindergarten located on 2nd floor
without direct egress; intervention located in former bathroom; ESL located in former
closet; speech/psychologist shared and access through kindergarten classroom only;
no meeting rooms for faculty; and an eight classroom temporary modular building.
Built in 1971, the interior building configuration was constructed to accommodate the
“open classroom” educational model, which espoused classrooms with “no walls” To
create individual classroom spaces, temporary dividers and bookcases are being
utilized. (For additional detail see attached current floor plan, classroom & enrollment
distribution chart, and detailed space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 44 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2011 (one) and in 2012 (two). (For additional detail see attached
Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Jefferson Elementary School facility does not adequately support its educational and
academic programs and the current space utilization is inefficient. We recommend
the following: 1) remove temporary dividers/bookcases and replacing with permanent
walls to create individual classrooms; 2) relocate the temporary classroom building;
and 3) construct an addition to include 9 classrooms, cafeteria, kitchen, and
boys/girls lavatory. Please note the temporary classroom building can be re-utilized to
accommodate district-wide programs, including self-contained special education
programs.

9
KENDALL ELEMENTARY SCHOOL

Overview
Building Area: 54,450 SF
Current Enrollment: 489 students; 23 classrooms
2014 Projected Enrollment: 487; 23 classrooms
Facility Deficiencies: No computer lab; no restrooms in the 4th/5th grade wing of the
facility.

Current Space Utilization Analysis


Kendall has 23 classrooms with dedicated spaces for art, music, cafeteria, and
gymnasium. There are dedicated spaces for special education services, speech,
ESL/ELL, psychologist, and social worker. Strings is held on the stage. Kendall also
houses a pre-k program. (For additional detail see attached current floor plan,
classroom & enrollment distribution chart, and detailed space utilization grid and
notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal a decrease of 2 students by
2014. However, an additional classroom will be needed in 2014 to accommodate
the 4th section of 5th grade. (For additional detail see attached Assessment Matrix and
Enrollment Projections.)

Proposed Efficient Space Utilization


No recommendation.

10
MARVIN ELEMENTARY SCHOOL

Overview
Building Area: 53,440 SF
Current Enrollment: 446 students; 21 classrooms
2014 Projected Enrollment: 466; 21 classrooms
Facility Deficiencies: None

Current Space Utilization Analysis


Marvin Elementary has 21 classrooms; dedicated art and music rooms; dedicated
cafeteria and gymnasium; and, dedicated spaces for special education services, AT,
ESL/ELL, literacy, psychologist, OT/PT, and social worker. The school also houses a
pre-k program (1 classroom.). (For additional detail see attached current floor plan,
classroom & enrollment distribution chart, and detailed space utilization grid and
notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 20 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2010 (two); 2011 (two) and 2012 (two); 2013 (two); and 2014 (two). (For
additional detail see attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


No recommendation.

11
NARAMAKE ELEMENTARY SCHOOL

Overview
Building Area: 44,466 SF
Current Enrollment: 404 students; 19 classrooms
2014 Projected Enrollment: 435; 19 classrooms
Facility Deficiencies: 1 temporary classroom; psychologist in electrical closet;
insufficient ELL space; literacy, social worker, AT spaces have sound issues; drop-off
area needs new curb cuts

Current Space Utilization Analysis


Naramake Elementary has 19 classrooms; dedicated art room; shared music and
strings room; shared cafeteria/gymnasium; pre-k program (2 classrooms); family
resource room; and 1 temporary classroom. The media center will be reconfigured
this year to add an additional classroom. ELL, ESL, social worker, AT, and psychologist
share spaces. (For additional detail see attached current floor plan, classroom &
enrollment distribution chart, and detailed space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 31 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2010 (one); 2011 (two); 2012 (three); 2013 (three); and 2014 (three).
(For additional detail see attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


We propose relocating the Family Resource Center to an alternate facility, which will
allow additional space for the psychologist and the ELL programs. We also propose
an addition of four classrooms to replace the existing temporary classroom and to
accommodate enrollment growth over the next five years.

12
ROWAYTON ELEMENTARY SCHOOL

Overview
Building Area: 51,139 SF
Current Enrollment: 469 students; 24 classrooms
2014 Projected Enrollment: 488; 24 classrooms
Facility Deficiencies: 4 temporary classrooms; non ADA classroom on 2nd floor; AT in
a closet; insufficient size gymnasium; electrical infrastructure deficiency

Current Space Utilization Analysis


Rowayton Elementary has 24 classrooms; dedicated art and music room; dedicated
undersized gymnasium; dedicated cafeteria; self-contained special education
classrooms (3); dedicated speech and ELL; share AT and strings; insufficient size
library. There are four temporary classrooms. A classroom and the academically
talented program is located on the second floor of the facility without required ADA
access. The cafeteria, gymnasium and library are insufficient size to accommodate the
enrollment levels. The electrical infrastructure is not sufficient to support the technology
program. . (For additional detail see attached current floor plan, classroom &
enrollment distribution chart, and detailed space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal an increase of 19 students by
2014. To accommodate this enrollment growth, additional classrooms will be
required in 2010 (one); 2012 (one); 2013 (one); and 2014 (one). (For additional detail
see attached Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Rowayton Elementary School’s current space utilization does not fully support all of its
educational and academic programs. In order to address the space utilization issues,
we recommend the following: 1) discontinue use of second floor classroom and AT
room; 2) expand the cafeteria into the stage area; 3) relocate the strings to the current
music room, allowing the academically talented program to have a dedicated space;
4) remove the four temporary classrooms, and 5) construct a new addition with four
classrooms, music room, art room, and an expanded gymnasium with a new stage.

13
SILVERMINE ELEMENTARY SCHOOL

Overview
Building Area: 48,626 SF
Current Enrollment: 341 students; 19 classrooms
2014 Projected Enrollment: 339; 17 classrooms
Facility Deficiencies: Some Restrooms not ADA and no lift to stage

Current Space Utilization Analysis


Silvermine Elementary has 19 classrooms with dedicated space for art, music, and
strings. Gymnasium and cafeteria are shared. Speech, literacy, OT/PT have dedicated
spaces. Pyschologist, social worker, ESL, and AT share spaces. (For additional detail
see attached current floor plan, classroom & enrollment distribution chart, and detailed
space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal a decrease of 2 students by
2014 and therefore no impact on space utilization. (For additional detail see attached
Assessment Matrix and Enrollment Projections.)

Proposed Efficient Space Utilization


Silvermine Elementary has adequate space to support its educational and academic
programs. Given the ample space, Silvermine could potentially accept the pre-k
program from Cranbury Elementary School.

14
TRACEY ELEMENTARY SCHOOL

Overview
Building Area: 54,374 SF
Current Enrollment: 380 students; 20 classrooms
2014 Projected Enrollment: 384; 18 classrooms
Facility Deficiencies: No computer lab; special education room in former restroom; no
restrooms near cafeteria; heating deficiency; electrical infrastructure deficiency;
lighting in hallways and classrooms inadequate; insufficient parking.

Current Space Utilization Analysis


Tracy Elementary School has 20 classrooms with a dedicated art, music, strings,
cafeteria, and gymnasium. There is a pre-k program (1 classroom). Psychologist,
social worker, ELL, literacy, AT all share spaces. There is no computer lab. Some
special education services are located in former restrooms. (For additional detail see
attached current floor plan, classroom & enrollment distribution chart, and detailed
space utilization grid and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal increase of 4 students by 2014.
Therefore no impact is expected on space utilization.

Proposed Efficient Space Utilization


Tracey Elementary has adequate space to support its educational and academic
programs. No recommendation.

15
WOLFPIT ELEMENTARY SCHOOL

Overview
Building Area: 50,560 SF
Current Enrollment: 304 students; 15 classrooms
2014 Projected Enrollment: 333; 18 classrooms
Facility Deficiencies: Non-ADA

Current Space Utilization Analysis


Wolfpit Elementary has 15 classrooms; dedicated art room; shared music and strings;
shared cafeteria/gymnasium; dedicated space for social worker, psychologist, speech,
literacy and ELL; AT shared with literacy. (For additional detail see attached current
floor plan, classroom & enrollment distribution chart, and detailed space utilization grid
and notes.)

Enrollment Projections Impact


Enrollment projections over the next five years reveal increase of 29 students by 2014.
To accommodate enrollment, additional classrooms will be required in 2010 (one);
2011 (two); 2012 (two); 2013 (three); and 2014 (three). (For additional detail see
attached current floor plan, classroom & enrollment distribution chart, and detailed
space utilization grid and notes.)

Proposed Efficient Space Utilization


Wolfpit Elementary School’s current space utilization will not fully support all of its
educational and academic programs in the future. In order to address the space
utilization issues, we recommend the following: 1) relocate the existing computer lab
to the lower level allowing this space to be used as a classroom; 2) relocate the AT
and Literacy programs from the classroom that they currently occupy to open up the
space to be used as a classroom.

16
LEGEND

CLASSROOMS

ART + MUSIC

RESOURCE

CAFETERIA

GYMNASIUM

LIBRARY + COMPUTER LAB

ADMINISTRATIVE

STORAGE

BATHROOMS

MAIN ENTRANCE

ADDITIONS + ALTERATIONS

SHARED SPACES

# OF STUDENTS PER CLASSROOM 20

CLASSROOM W/ ASSISTANT 25

ADDITIONAL CLASSROOM REQUIRED

ADDITIONAL CLASSROOM AVAILABLE

PARTNERS FOR
8 UNION STREET STAMFORD, CT 06906
203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A NORWALK PUBLIC SCHOOLS
BROOKSIDE ELEMENTARY SCHOOL
382 HIGHLAND AVENUE, NORWALK, CONNECTICUT 06854

2009-2010 ENROLLMENT 433


AGE : ORIGINAL: AGE : ADDITION:
BUILDING AREA: 58,335 SF SITE: 8 ACRES

STREET

SO
K 1 2 3 4 5
EL
MICHA
21 18 20 17 21 19 ART

UN
FIELD
BASEBALL

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


21 18 20 17 20 19 MUSIC

DVI
21 18 20 17 20 18 STRINGS
21 17 20 17 18 CAFETERIA

EW
GYMNASIUM

AVE
K 1 2 3 4 5 COMPUTER LAB
LL FIELD
BASEBA 21 21 18 20 23 20 PRE-SCHOOL

NU

2010-2011
20 20 17 20 23 20 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
E
20 20 17 19 22 20 SELF-CONT. SPED
20 20 17 19
SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
20 20 20 23 20 23 SPEECH

2011-2012
20 20 20 22 20 22 ESL
20 20 20 22 19 22 ELL
20 19 19 19 LITERACY
PLAY AREAS
SOCCER / OPEN AREA PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
20 20 20 20 23 20
SOCIAL WORKER

2012-2013
20 20 19 19 22 19
19 19 19 19 22 19 WELCOME CENTER
5 19 19 19 19 19 FAMILY RESOURCE
5
4 PROJECT EXCEL
4 K 1 2 3 4 5
3
3 5
20 19 19 19 20 22
3

2013-2014
M 3 20 19 19 19 20 22
2
4 20 19 19 19 19 22
1 20 19 19 18 19
A 1

SITE FACILITIES
1 K 1 2 3 4 5 PLAY AREA K-2
PK 2 20 20 19 19 19 20 PLAY AREA 3-5
2

2014-2015
COURTYARD 1 20 20 19 19 19 19 BASKETBALL COURT
2 20 19 18 18 19 19 BASEBALL FIELD
L 19 19 18 18 19 19 SOCCER FIELD
GYM CAFE PC OPEN PLAY AREA

PK
PK
+ RELOCATE WELCOME CENTER TO ALTERNATIVE FACILITY TO MAKE SPACE FOR CLASSROOM
K

BROOKSIDE ELEMENTARY SCHOOL FACILITY DEFICIENCIES


K + (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013


K
K + (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014
ASPHALT
K-PLAY AREA

HIGHLAN
D AVENUE

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN BROOKSIDE ELEMENTARY SCHOOL
RELOCATE TO
ALTERNATE FACILITY

M 450
Music
655 SF
3 431
Third Grade
665 SF
3432
Third Grade
673 SF
3433
Third Grade
857 SF
4434
Fourth Grade
682 SF
4435
Fourth Grade
662 SF
5436
Fifth Grade
710 SF
5 437
Fifth Grade
694 SF

A 4 2 3 5
448 525
528
Stage 524 Custodian 527 533 438
775 SF Phys. Ed. Office 100 SF 451 ELL 440 439
Welcome Center/ELL 312 SF Fourth Grade Second Grade Third Grade Fifth Grade
175 SF
799 SF
Art 715 SF 699 SF
687 SF 663 SF
523 1022 SF
Office
64 SF

537
531
Kitchen Faculty Lounge
579 SF
627 SF

GYM
529 530
Work Room Office
447 196 SF 217 SF

PK 1 1 1
Gymnasium
4088 SF 423 424 425 426

CAFE
Pre-K First Grade First Grade First Grade
449 851 SF 845 SF 862 SF 856 SF
Cafeteria
1576 SF

L
462
Library
1749 SF

452
Strings
187 SF
485
Table Storage
189 SF
461
Literacy Literacy
263 SF
460

257 SF
PC 463
Computer Lab
700 SF 534
Specialist
2 430
Second Grade
707 SF 1 429
First Grade
723 SF 2 428
Second Grade
728 SF 2427
Second Grade
720 SF

51 SF

455
Psych.

PK PK
177 SF 477
PTO
301 SF 457 458 459 539 446
476 Language Speech Special Ed. Pre-K Pre-K
Work Room 473 SF 236 SF 286 SF 966 SF 779 SF
257 SF
475
456
Nurse
224 SF Social Worker
311 SF
471

K K
General Office
359 SF 442 536
474
Kindergarten Kindergarten
Asst. Principal 1031 SF 1015 SF
472
349 SF
Principal
262 SF

473
Small Conference
140 SF

453
Mentor
454
137 SF
OT/PT

K K
215 SF
441 444
Kindergarten Kindergarten
1033 SF 1021 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN BROOKSIDE ELEMENTARY SCHOOL
COLUMBUS MAGNET SCHOOL
46 CONCORD STREET, NORWALK, CONNECTICUT 06854

2009-2010 ENROLLMENT: 348


AGE : ORIGINAL: 1938 AGE : ADDITION: 1980
BUILDING AREA: 63,150 SF SITE: 4 ACRES

K 1 2 3 4 5
22 19 18 21 23 21 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


21 18 18 20 23 21 MUSIC
18 18 20 22 20 STRINGS
CAFETERIA
GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
22 19 19 19 21 24 PRE-SCHOOL

2010-2011
22 19 19 18 21 23 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
19 18 18 21 23 SELF-CONT. SPED

SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
21 20 20 19 20 22 SPEECH

2011-2012
21 20 20 19 19 22 ESL
20 19 19 19 21 ELL
LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
20 21 21 21 20 20
STREET

SOCIAL WORKER

2012-2013
20 20 20 21 20 20
20 20 20 20 19 WELCOME CENTER
FAMILY RESOURCE
PROJECT EXCEL
K 1 2 3 4 5
21 20 20 21 17 20
MULVOY

2013-2014
21 20 20 20 17 20
20 20 20 17 19

SITE FACILITIES
K 1 2 3 4 5 PLAY AREA K-2
20 21 20 20 21 21 PLAY AREA 3-5

STREET

2014-2015
20 20 20 20 20 21 BASKETBALL COURT
20 19 20 20 20 BASEBALL FIELD
SOCCER FIELD
OPEN PLAY AREA

CHESTNUT
K
+ PARKING DEFICIENCY
1

COLUMBUS MAGNET SCHOOL FACILITY DEFICIENCIES


PLAY AREA
GYM CAFE + BUS LOADING ON STREET
1 K + SHARED GYMNASIUM & CAFETERIA

+ NO MEETING ROOMS / CONFERENCE ROOMS FOR FACULTY


OPEN AREA
BASKETBALL M A 2 + GYMNASIUM FLOOR IS BEYOND USEFUL LIFE

+ ADA DEFICIENCIES (WHEELCHAIR ACCESS THROUGH CUSTODIAN SPACE, DOOR HARDWARE)

+ LIGHTING IN HALLWAYS & CLASSROOMS INADEQUATE

+ RESOURCE ROOMS IN CLOSETS

+ PSYCHOLOGIST OFFICE IN ELEVATOR SHAFT

+ ELECTRICAL INFRASTRUCTURE DEFICIENCY

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN COLUMBUS MAGNET SCHOOL
126
Social Worker
169 SF

117 121
Custodian AT/Strings/Intervention/ESL
135 SF 333 SF

1
113
First Grade

K
687 SF
101
114 120 124 Kindergarten
Resource Kitchen Telco. 1127 SF
641 SF 525 SF 122 80 SF
115
112 Family
Phys. Ed.
Work Room 111 SF
381 SF
196 SF

1
111
First Grade
675 SF

GYM CAFE 128


Gymnasium/Cafeteria
126
Stage

K
4978 SF 651 SF
102

1
Kindergarten
110 1009 SF
First Grade
697 SF

108
Conf./Social Worker

M A 2
109 347 SF 107
104 103
Music Admin. 106 Art Second Grade
384 SF 105
673 SF Nurse Principal 742 SF 1139 SF
175 SF 239 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN COLUMBUS MAGNET SCHOOL
216
Psych.
98 SF

219

PC
217
Faculty

3
562 SF

4
215
P.C. Room

L
499 SF 201
Third Grade 218 Fourth Grade
713 SF
Library 735 SF
1848 SF
220
Literacy/ESL
90 SF
214 202
Work Room Work Room
220 SF 212 SF
221
Literacy/ESL
128 SF

3 4
213 203
Third Grade Fourth Grade
686 SF 729 SF

3 4
212
204
Third Grade Fourth Grade
716 SF
734 SF

210

2 2 5 5 5
Work Room
211 226 SF 209 208 207 206 205
Second Grade Second Grade Fifth Grade Fifth Grade Work Room Fifth Grade
891 SF 731 SF 722 SF 732 SF 200 SF 861 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SECOND FLOOR PLAN COLUMBUS MAGNET SCHOOL
513
Social Worker
169 SF

556 526
Custodian AT/Strings/Intervention/ESL
135 SF 333 SF

1
520
First Grade

K
687 SF
525
527 557 554 Kindergarten
Resource Kitchen Telco. 1127 SF
641 SF 525 SF 543 80 SF
544
551 Family
Phys. Ed.
Work Room 111 SF
381 SF
196 SF

1
521
First Grade
675 SF

Kitchen GYM CAFE 560


Gymnasium/Cafeteria
561
Stage

K
4978 SF 651 SF
524

1
Kindergarten
522 1009 SF
First Grade
697 SF

Cafeteria

539
Conf./Social Worker

M A 2
109 347 SF 540
505 501
Music Admin. 541 Art Second Grade
384 SF 542
673 SF Nurse Principal 742 SF 1139 SF
175 SF 239 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN COLUMBUS MAGNET SCHOOL
563
Psych.
98 SF

487

PC
502
Faculty

3
562 SF

4
528
P.C. Room

L
499 SF 538
Third Grade 500 Fourth Grade
713 SF
Library 735 SF
1848 SF
492
Literacy/ESL
90 SF
491 490
Work Room Work Room
220 SF 212 SF
562
Literacy/ESL
128 SF

3 4
529 537
Third Grade Fourth Grade
686 SF 729 SF

Classroom

3 4
530
536
Third Grade Fourth Grade
716 SF
734 SF
Literary Literary
Resource

488

2 2 5 5 5
Work Room
Classroom 531 226 SF 532 533 534 535
489
Second Grade Second Grade Fifth Grade Fifth Grade Work Room Fifth Grade
621 SF 731 SF 722 SF 732 SF 200 SF 861 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SECOND FLOOR PLAN COLUMBUS MAGNET SCHOOL
CRANBURY ELEMENTARY SCHOOL
10 KNOWALOT LANE, NORWALK, CONNECTICUT 06851

2009-2010 ENROLLMENT: 451


AGE : ORIGINAL: 1961 AGE : ADDITION: 1991
BUILDING AREA: 45,796 SF SITE: 12 ACRES

K 1 2 3 4 5
18 19 20 21 21 21 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


18 18 20 21 21 20 MUSIC
18 18 19 21 21 20 STRINGS
18 18 19 20 CAFETERIA
17 GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
21 22 18 19 21 21 PRE-SCHOOL

2010-2011
20 22 18 19 21 21 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
20 22 18 19 21 20 SELF-CONT. SPED
20 21 17 19 20
SPECIAL ED.
D
IEL ACADEM. TALENTED
LF K 1 2 3 4 5
BAL 20 20 21 23 19 21 SPEECH
SE
BA

2011-2012
20 20 21 23 19 21 ESL
20 20 21 23 19 20 ELL
20 19 21 19 LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
4 20 20 20 21 23 19
SOCIAL WORKER

2012-2013
4 20 20 19 21 23 19
SOCCER / OPEN AREA 19 19 19 20 23 19 WELCOME CENTER
PK 19 19 19 20 18 FAMILY RESOURCE
PROJECT EXCEL
5 K 1 2 3 4 5
5 PK 20 19 19 19 21 23
5

2013-2014
20 19 19 19 21 23
20 19 19 19 21 22
3 4
20 19 19 18 20
3 4

SITE FACILITIES
3 K 1 2 3 4 5 PLAY AREA K-2
20 20 19 19 19 21 PLAY AREA 3-5

2014-2015
GARDEN 20 20 19 19 19 21 BASKETBALL COURT
BASKETBALL 20 19 18 18 19 20 BASEBALL FIELD
19 19 18 18 19 20 SOCCER FIELD
2 OPEN PLAY AREA

1
1
2 1
PLAY AREAS
GYM 2 1
L + BUS / PARKING / DROP-OFF DEFICIENCIES, SHOULD BE SEPARATED

CRANBURY ELEMENTARY SCHOOL FACILITY DEFICIENCIES


CAFE 2
K + NO COMPUTER LAB

K + NO ART ROOM
K + NO MUSIC ROOM
K
+ SHARED GYMNASIUM & CAFETERIA

+ INADEQUATE LIBRARY

+ STORAGE DEFICIENCY THROUGHOUT FACILITY

+ LIGHTING IN HALLWAYS & CLASSROOMS INADEQUATE

+ ADA DEFICIENCIES (DOOR HARDWARE)

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2010

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013

+ (2) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

+ PRE-K TO POTENTIALLY MOVE TO SILVERMINE E.S. TO PROVIDE ADDITIONAL CLASSROOMS


KNOWALO
T LANE

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN CRANBURY ELEMENTARY SCHOOL
1
101
First Grade

1
800 SF 103

K
First Grade

K
105 109
884 SF

K
ESL 107 Kindergarten
699 SF Kindergarten 111
1236 SF

K
859 SF Kindergarten
1201 SF 113
Kindergarten
1240 SF

2 1
102
Second Grade 104

1
836 SF First Grade 106

2
869 SF
First Grade 108

2
785 SF
Second Grade 110

2
803 SF
Second Grade 112
818 SF
Second Grade
766 SF

L
116
Library
1079 SF

SILVERMINE
ELEMENTARY 117
SCHOOL General Office
487 SF

118
119 Storage
Principal 84 SF
147 SF

120
Asst. Principal
137 SF

GYM CAFE
121
Nurse 124 125
276 SF Stage Gymnasium/Auditorium
849 SF 4614 SF

122
Faculty
356 SF
146
Pre-K P.T. 123
153 SF Storage
150 82 SF
Pre-K P.T.

PK PK 5 4 4 3
198 SF 129
151 147 145 143 141 137 135
Pre-K Pre-K Fifth Grade Fourth Grade Fourth Grade Third Grade Special Ed./Resource Boiler Room
861 SF 157 156 127
923 SF 968 SF 983 SF 868 SF 841 SF 851 SF 863 SF
130 Social Worker
Literacy Office 128
Speech 60 SF 136 SF 80 SF Kitchen
126 672 SF
121 SF 155 154
AT/Strings/E-Care
317 SF
Literacy Storage 153
218 SF 342 SF
Office
97 SF

4 4 5 5 3 3
152 148 144 142 140 136 134
Fourth Grade Fourth Grade Conf./Psych./AT Fifth Grade Fifth Grade Third Grade Third Grade
853 SF 680 SF 629 SF 974 SF 860 SF 843 SF 864 SF
133
Yard Strorage
292 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN CRANBURY ELEMENTARY SCHOOL
1
672
First Grade

1
800 SF 673

K
First Grade

K
674 676
884 SF

K
ESL 675 Kindergarten
699 SF Kindergarten 677
1236 SF

K
859 SF Kindergarten
1201 SF 678
Kindergarten
1240 SF

2 1
722
Second Grade 679

1
836 SF First Grade 680

2
869 SF
First Grade 681

2
785 SF
Second Grade 682
803 SF
Second Grade
818 SF

L
Library / Computer Lab

SILVERMINE
ELEMENTARY 745
SCHOOL General Office
487 SF

699
718 Storage
Principal 84 SF
147 SF

710
Asst. Principal
137 SF

GYM CAFE
717
Nurse 712 713
276 SF Stage Gymnasium/Auditorium
849 SF 4614 SF

711
Faculty
356 SF
738
Pre-K P.T. 714
153 SF Storage
737 82 SF
Pre-K P.T.

PK PK 5 4 4 3
198 SF 685 700
684 686 687 688 689 690
Pre-K Pre-K Fifth Grade Fourth Grade Fourth Grade Third Grade Special Ed./Resource Boiler Room
861 SF 732 730 727
923 SF 968 SF 983 SF 868 SF 841 SF 851 SF 863 SF
701 Social Worker
Literacy Office 723
Speech 60 SF 136 SF 80 SF Kitchen
733 672 SF
121 SF 729 728
AT/Strings/E-Care
317 SF
Literacy Storage 724
218 SF 342 SF
Office
97 SF

Kitchen

4 4 5 5 3 3
691 692 693 694 695 696 697
Fourth Grade Fourth Grade Conf./Psych./AT Fifth Grade Fifth Grade Third Grade Third Grade
853 SF 680 SF 629 SF 974 SF 860 SF 843 SF 864 SF
704
Yard Strorage Music
292 SF

Cafeteria

Art
Storage

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN CRANBURY ELEMENTARY SCHOOL
FOX RUN ELEMENTARY SCHOOL
228 FILLOW STREET, NORWALK, CONNECTICUT 06850

RUN ROAD 2009-2010 ENROLLMENT: 447


FOX AGE : ORIGINAL:
BUILDING AREA:
1961
53,336 SF
AGE : ADDITION:
SITE:
1988 | 1991 | 1996
17 ACRES

K 1 2 3 4 5
20 20 17 19 20 19 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


20 20 16 19 19 19 MUSIC
20 19 16 18 19 18 STRINGS
20 19 16 18 18 CAFETERIA
20 GYMNASIUM
IELD
LL F K 1 2 3 4 5 COMPUTER LAB
ASEBA 22 20 19 22 19 19
B PRE-SCHOOL

2010-2011
21 20 19 21 19 19 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
21 19 19 21 18 19 SELF-CONT. SPED
21 19 19 18
19 SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
21 21 19 19 22 19 SPEECH

2011-2012
21 21 19 19 21 18 ESL
21 20 19 18 21 18 ELL
21 20 19 18 18 LITERACY
FIELD
BASEBALL 18
PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
21 21 20 23 19 21
SOCIAL WORKER

2012-2013
20 20 20 23 19 21
20 20 20 23 18 21 WELCOME CENTER
OPEN AREA 20 20 20 23 18 FAMILY RESOURCE
PROJECT EXCEL
K 1 2 3 4 5
21 20 20 20 24 19

ET

2013-2014
21 20 20 20 23 18

RE
21 20 20 19 23 18
2 2
20 19 19 19 23 18

ST
PK K

SITE FACILITIES
K K K K 1 2 3 4 5 PLAY AREA K-2
K 21 20 20 20 20 23 PLAY AREA 3-5
2

W
BASKETBALL

2014-2015
2 1
21 20 19 19 20 23 BASKETBALL COURT
1

LO
21 20 19 19 20 23 BASEBALL FIELD
1 PC
1 20 20 19 19 19 23 SOCCER FIELD

FIL
OPEN PLAY AREA

L
PLAY AREAS
COMMUNITY GARDEN
+ NO DEDICATED MUSIC SPACE, CURRENTLY ON STAGE

FOX RUN ELEMENTARY SCHOOL FACILITY DEFICIENCIES


M GYM + NO STRINGS SPACE, CURRENTLY USING SERVICE HALLWAY NEAR KITCHEN

+ OT/PT & PROJECT EXCEL SPACES LOCATED IN CAFETERIA

A 5 4 4 3 3 + STORAGE DEFICIENCY THROUGHOUT FACILITY

+ LIGHTING IN HALLWAYS INADEQUATE

5 5 4 3 3 + ACOUSTICAL ISSUES IN CAFETERIA

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2011


CAFE
+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

+ CURRENTLY (1) EMPTY CLASSROOM CAN ACCOMMODATE FUTURE ENROLLMENT

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN FOX RUN ELEMENTARY SCHOOL
CURRENTLY EMPTY

2
101

2
Second Grade
1024 SF 103
Second Grade
1011 SF 105

PK
Classroom
731 SF 107

K K
Pre-K 109

K
884 SF 115

K
Kindergarten 111 Kindergarten
788 SF 117
Kindergarten 1236 SF

K
771 SF
Kindergarten
1201 SF 118
Kindergarten
1240 SF

2
102

2
Second Grade
1036 SF 104

1
Second Grade
1032 SF 106

1
First Grade
108

1
851 SF
First Grade 110
869 SF

PC
First Grade 112

1
785 SF Family Resource 116
556 SF 114 Computer Lab
113 120
Speech First Grade 546 SF
818 SF
Work Room
211 SF 119 73 SF
Office
63 SF

L
121
Library
1974 SF

122
General Office
505 SF

123
Principal
256 SF

M GYM
124
Nurse 126 127
283 SF Stage/Music Gymnasium
849 SF 4614 SF

125
Faculty
368 SF

A 5 4 4 3 3
155 142
157 153 151 149 147 145
Art Resource/Special Ed. Boiler Room
698 SF
Fifth Grade Fourth Grade Fourth Grade Third Grade Third Grade 139
861 SF
766 SF 983 SF 868 SF 841 SF 851 SF 863 SF Intervention 137
143 140 179 SF Psych.
Work Room/IT AT/ESL 138 190 SF 134
128
114 SF 184 SF Literacy/Special Ed. Strings
326 SF Kitchen 288 SF
141 136 135 442 SF
Asst. Principal Social Worker Office
117 SF 190 SF 97 SF

5 5 4 3 3
156 154 152 150 148 146
Resource/Project Excel Fifth Grade Fifth Grade Fourth Grade Third Grade Third Grade
758 SF 758 SF 974 SF 860 SF 843 SF 864 SF
144 133
Strorage Receiving
292 SF 382 SF 132
OT/PT
159 SF
131

CAFE
Storage 129
147 SF
Cafeteria
2856 SF

130
Project Excel
97 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN FOX RUN ELEMENTARY SCHOOL
JEFFERSON ELEMENTARY SCHOOL
75 VAN BUREN AVENUE, NORWALK, CONNECTICUT 06850

2009-2010 ENROLLMENT: 539


AGE : ORIGINAL: 1971 AGE : ADDITION: ---
BUILDING AREA: 53,150 SF SITE: 6 ACRES

E
CT AVENU
PROSPE
TEMP. CLASSROOMS
K 1 2 3 4 5
22 21 20 16 20 19 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


22 21 20 15 20 19 MUSIC
22 20 20 15 19 18 STRINGS
21 20 20 15 19 18 CAFETERIA
21 20 19 15 GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
21 21 20 20 19 20 PRE-SCHOOL

2010-2011
21 21 20 20 19 19 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
21 21 20 20 19 19 SELF-CONT. SPED
20 21 20 19 19 19
20 21 19 19 SPECIAL ED.
OPEN AREA ACADEM. TALENTED
K 1 2 3 4 5
21 20 21 20 20 19 SPEECH

2011-2012
21 20 21 20 20 19 ESL
5 20 20 20 19 20 19 ELL

UE
20 20 20 19 19 18 LITERACY
5 5 20 20 20 19 19
PSYCHOLOGIST

EN
4 5 K 1 2 3 4 5
OT/PT
20 20 20 20 20 20

AV
SOCIAL WORKER

2012-2013
4 4 20 20 19 20 20 20
COMMUNITY GARDEN 20 20 19 20 19 19 WELCOME CENTER
4 20 19 19 20 19 19 FAMILY RESOURCE

IEW
19 19 19 20 19 19 PROJECT EXCEL
K 1 2 3 4 5
21 20 20 24 21 24

DV

2013-2014
20 19 19 24 20 24
20 19 19 24 20 24

AN
20 19 19 23 20 24
PLAY AREAS

GR
20 19 19 20

SITE FACILITIES
K 1 2 3 4 5 PLAY AREA K-2
21 20 19 24 24 20 PLAY AREA 3-5
L
2

2014-2015
20 20 19 24 24 20 BASKETBALL COURT
20 20 19 23 24 20 BASEBALL FIELD
20 19 19 23 24 20 SOCCER FIELD
2 2 3 3 20 19 18 19 OPEN PLAY AREA

2 2 3 3

ASPHALT BUS DROP-OFF


+ PARKING DEFICIENCY

JEFFERSON ELEMENTARY SCHOOL FACILITY DEFICIENCIES


PLAY AREA
+ 8 TEMPORARY CLASSROOMS

+ BUILDING ENTRANCE INSECURE

E
NU + COMPUTER LAB INADEQUATE IN SIZE
AVE
EN + NO SPACE FOR STRINGS & ACADEMICALLY TALENTED, CURRENTLY SHARE STAGE
BUR
VAN + SHARED GYMNASIUM & CAFETERIA

+ KINDERGARTEN LOCATED ON SECOND FLOOR WITHOUT DIRECT EGRESS

+ INTERIOR RECONFIGURATION OF CLASSROOMS NECESSARY

+ INTERVENTION LOCATED IN FORMER BATHROOM

+ ESL LOCATED IN FORMER CLOSET

+ SPEECH / PSYCH. ONLY ACCESSIBLE THROUGH KINDERGARTEN CLASSROOM

+ NO MEETING ROOMS / CONFERENCE ROOMS FOR FACULTY

+ ASPHALT KINDERGARTEN PLAYGROUND

+ UNSAFE OPERABLE WINDOWS / POOR VENTILATION

+TEMPORARY CLASSROOMS BUILDING POTENTIALLY RELOCATED TO ACCOMMODATE DISTRICT


WIDE SPECIAL EDUCATION PROGRAM

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2011

+ (2) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN JEFFERSON ELEMENTARY SCHOOL
107
106 Equipment Room 108
Intervention 148 SF Mechanical Equipment
157 SF

K
1365 SF
101
Kindergarten
994 SF

K
105
Kindergarten

K
1331 SF
102
Kindergarten
1259 SF

K
103
Kindergarten 104
1314 SF Speech/Psych.
583 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN JEFFERSON ELEMENTARY SCHOOL
223
Kitchen

GYM CAFE
225 224 987 SF
Stage/Strings/AT Auditorium/Cafeteria/Gymnasium
873 SF 5791 SF

222
221
212
Intervention Science

A
Language 214 237 SF
312 SF
450 SF 213 Art

K
Storage 835 SF
201 211 387 SF 220
Kindergarten Pantry Office
1164 SF 144 SF 114 SF

208
General Office
549 SF
210 219

1 1
Special Ed. Literacy

M
202 215
498 SF 478 SF
First Grade 207 First Grade 218
836 SF Music
988 SF Principal
160 SF 525 SF
209
Break
82 SF
206

1 1
Conference

1
319 SF 216 217
203 First Grade First Grade
First Grade 204 951 SF 888 SF
739 SF
Nurse 205
245 SF Asst. Principal
208 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SECOND FLOOR PLAN JEFFERSON ELEMENTARY SCHOOL
MOVE TEMPORARY BUILDING
[DISTRICT WIDE SPECIAL EDUCATION]

5
324
Fifth Grade
655 SF

5 5
322
325
Fifth Grade Fifth Grade
655 SF
655 SF

4 5
320
Fourth Grade 323
655 SF Fifth Grade
655 SF

4 4
318
321
Fourth Grade Fourth Grade
655 SF
655 SF

4
319
Fourth Grade
655 SF

Gymnasium
(Open to Below)

308 316

L
Storage Computer Lab/Classroom
309 315 573 SF
320 SF
OT/Storage Library

2
262 SF 2003 SF 317
301
Second Grade 307 Work Room
1142 SF Social Worker 114 SF
88 SF

306 314

2 2 3 3
302 ESL 305 Special Ed. 313
310
478 SF 474 SF
Second Grade Second Grade Third Grade Third Grade
895 SF 849 SF 864 SF 668 SF

2 2 3 3
303 304 311 312
Second Grade Second Grade Third Grade Third Grade
917 SF 954 SF 949 SF 957 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A THIRD FLOOR PLAN JEFFERSON ELEMENTARY SCHOOL
Classroom Classroom

Classroom Classroom Kitchen

Cafeteria

Classroom Classroom Loading

Classroom Classroom

Gymnasium
(Open to Below)
Boys Girls

Classroom

699 696

L
Storage Computer Lab/Classroom
700 695 573 SF
320 SF
OT/Storage Library

2
262 SF 2003 SF 697
681
Second Grade 692 Work Room
1142 SF Social Worker 114 SF
88 SF

690 691

2 2 3 3
682 ESL 685 Special Ed. 689
686
478 SF 474 SF
Second Grade Second Grade Third Grade Third Grade
895 SF 849 SF 864 SF 668 SF

2 2 3 3
683 684 687 688
Second Grade Second Grade Third Grade Third Grade
917 SF 954 SF 949 SF 957 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A THIRD FLOOR PLAN JEFFERSON ELEMENTARY SCHOOL
KENDALL ELEMENTARY SCHOOL
57 FILLOW STREET, NORWALK, CONNECTICUT 06850

2009-2010 ENROLLMENT: 471


AGE : ORIGINAL: 1951 AGE : ADDITION: 1966 | 1989
BUILDING AREA: 54,450 SF SITE: 9 ACRES

BA
SEB
ALL
FIE
LD
K 1 2 3 4 5
22 18 21 21 19 23 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


22 18 21 21 18 22 MUSIC
22 18 21 21 18 22 STRINGS
22 18 20 21 18 22 CAFETERIA
GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
22 22 18 21 21 24 PRE-SCHOOL

2010-2011
22 21 18 20 21 24 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
22 21 17 20 21 24 SELF-CONT. SPED
21 21 17 20 21
SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
22 21 21 23 21 21 SPEECH

2011-2012
22 21 21 23 20 21 ESL
22 21 21 22 20 21 ELL
21 21 20 20 20 LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
21 21 21 21 23 20
SOCIAL WORKER

2012-2013
OPEN AREA 21 21 21 20 23 20
21 21 20 20 22 20 WELCOME CENTER
21 21 20 20 20 FAMILY RESOURCE
BASKETBALL PROJECT EXCEL
K 1 2 3 4 5
22 21 21 20 21 23

2013-2014
22 20 21 20 21 22
PLAY AREA
2 CAFE 21 20 20 20 20 22
21 20 20 20 20
5 2 2

SITE FACILITIES
K 1 2 3 4 5 PLAY AREA K-2
5 2 1 GYM 21 21 20 20 21 21 PLAY AREA 3-5
5

2014-2015
21 21 20 20 20 20 BASKETBALL COURT
5 1 1 21 20 19 20 20 20 BASEBALL FIELD
4 21 20 19 20 20 20 SOCCER FIELD
1
4 OPEN PLAY AREA

ET
4

RE
4
L

ST
3 M
+ NO COMPUTER LAB
A

KENDALL ELEMENTARY SCHOOL FACILITY DEFICIENCIES


OW
3 PK + NO STRINGS SPACE, CURRENTLY USES STAGE

3 K + NO RESTROOMS IN 4TH/5TH GRADE WING OF FACILITY

LL
3 K

FI
+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

K
PLAY AREA

ET
STRE
FIL LOW

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN KENDALL ELEMENTARY SCHOOL
5 390
Fifth Grade

5
719 SF
389
Fifth Grade
719 SF

5 149
Fifth Grade

5
719 SF
388
Fifth Grade
719 SF

4147
Fourth Grade

2
4
719 SF 126
148
Second Grade
Fourth Grade 760 SF
719 SF

2127
Second Grade

4
833 SF
145

2
Fourth Grade

4
719 SF 125
146 Second Grade
Fourth Grade 743 SF
719 SF

2128
Second Grade
834 SF

3 101
Third Grade
719 SF

1 124
First Grade
753 SF

L
109
Library 1129
First Grade
806 SF

3
1990 SF

1
104
Third Grade 123
736 SF First Grade
742 SF

1
105
Copy Room 109 130
79 SF First Grade
Asst. Principal
247 SF 815 SF

110 135

3 CAFE
106
Intervention 133 Kitchen
82 SF Faculty 134 306 SF

3
Third Grade 537 SF Cafeteria
738 SF 107 1904 SF
131
Third Grade 132
707 SF 108 Copy Room Nurse 136
138 SF 287 SF
Special Ed. Custodian Office
771 SF 140 SF

A
144
112 122
377 Psych.
Art Speech
798 SF 134 SF Social Worker 152 SF
144 SF

PK 113
Preschool
508 SF
M 120
Music
871 SF
142
Reception GYM 139
Auditorium/Gymnasium
4620 SF
138
Stage/Strings
1084 SF
295 SF

143 141
119 Principal Conf.
ESL 80 SF 130 SF

K
596 SF
114
Kindergarten
968 SF

K 118
Kindergarten
1009 SF

K 115
Kindergarten
1020 SF

K 116
Kindergarten
1243 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN KENDALL ELEMENTARY SCHOOL
MARVIN ELEMENTARY SCHOOL
15 CALF PASTURE BEACH ROAD, NORWALK, CONNECTICUT 06855

2009-2010 ENROLLMENT: 444


AGE : ORIGINAL: 1971 AGE : ADDITION: 1996
BUILDING AREA: 53,440 SF SITE: 11 ACRES

K 1 2 3 4 5
20 22 21 19 23 21 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


19 21 20 18 23 20 MUSIC
19 21 20 18 23 20 STRINGS
19 21 20 18 CAFETERIA
PLAY AREA GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
21 19 21 20 19 23 PRE-SCHOOL

2010-2011
21 19 21 20 18 23 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
21 19 21 20 18 22 SELF-CONT. SPED
21 18 20 19 18
5 SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
BASKETBALL 5 3 3 21 21 19 21 20 24 SPEECH

2011-2012
21 20 18 20 20 24 ESL
5 21 20 18 20 20 24 ELL
21 20 18 20 19 LITERACY

3 3 PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
4 4 A 21 21 20 24 21 20
SOCIAL WORKER

2012-2013
20 20 20 24 20 20
BA

20 20 20 23 20 19 WELCOME CENTER
1 M PK
SE

4
BA

20 20 19 20 19 FAMILY RESOURCE
LL
FIE

PROJECT EXCEL
LD

2 2 2 K 1 2 3 4 5
1 1 1 L 21 20 20 20 24 20

2013-2014
21 20 20 19 24 20
2 21 20 20 19 24 20
20 19 19 19 20

K K

SITE FACILITIES
CAFE K 1 2 3 4 5 PLAY AREA K-2
21 20 20 20 20 24 PLAY AREA 3-5
K K

2014-2015
21 20 19 19 20 24 BASKETBALL COURT
21 20 19 19 19 23 BASEBALL FIELD
20 20 19 19 19 SOCCER FIELD
GYM OPEN PLAY AREA

PLAY AREA

+ NO STRINGS SPACE, CURRENTLY SHARING STAGE

CRANBURY ELEMENTARY SCHOOL FACILITY DEFICIENCIES


+ GROWING ENROLLMENT FOR THE NEXT 5 YEARS

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2010

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2011

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

H ROAD
BEAC
URE
PAST
CALF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN MARVIN ELEMENTARY SCHOOL
5
117
Fifth Grade
792 SF

5 3 3
116 118 119
Fifth Grade Third Grade Third Grade
773 SF 785 SF 782 SF

121
Literacy
122

5
196 SF
120 Special Ed.
115
Special Ed. 218 SF
Fifth Grade 179 SF
766 SF

3 3
114 124 123
Special Ed. Third Grade Third Grade
763 SF 743 SF 748 SF

A
106
ESL 125

4 4
228 SF Art
101 109 769 SF
Fourth Grade 107 Fourth Grade
825 SF Speech/Language 790 SF
190 SF

112 126

1 M PK
Literacy Faculty

4
110 111 113
428 SF 355 SF
102 First Grade Music Pre-K
Fourth Grade 818 SF 754 SF 818 SF
795 SF 108
ESL
169 SF

165 166 167


ReadingLibrarian Office Storage

2 2 2
118 SF 168 SF 163 SF
130 131 132
164 127
Second Grade Second Grade Second Grade
Social Worker Storage

1 1 1
761 SF 757 SF 754 SF
163 104 SF 390 SF
103 104 105
Conference

L
First Grade First Grade First Grade 289 SF
783 SF 781 SF 794 SF 168
Library
1758 SF
162
Principal
290 SF 128 139
Asst. Principal OT/PT

2
153 SF 138 127 SF 133
Storage
161 129 149 SF Second Grade
Copy/File Psych. 750 SF
135 SF 154 SF

153 160
152
Food Storage 154 155 Office

K K
Janitor 80 SF Storage Storage 544 SF 137 134
130 SF 266 SF 94 SF
Kindergarten Kindergarten

CAFE
1100 SF 1133 SF
150 156
Cafeteria 151 Book Storage 159
241 SF Nurse
2946 SF Kitchen 140
435 SF 157 307 SF Office
AT 121 SF
306 SF

K K
136 135
Kindergarten Kindergarten
1127 SF 1131 SF
149
Janitor Office
103 SF

147
Transformer

GYM
239 SF 141
144 Stage/Strings
Gymnasium 702 SF
4685 SF
146
Mechanical Equipment
464 SF

143 142
145 Storage Storage
Storage 161 SF 105 SF
134 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN MARVIN ELEMENTARY SCHOOL
NARAMAKE ELEMENTARY SCHOOL
16 KING STREET, NORWALK, CONNECTICUT 06851

2009-2010 ENROLLMENT: 400


AGE : ORIGINAL: 1961 AGE : ADDITION: 1996
BUILDING AREA: 44,466 SF SITE: 13 ACRES

TEMP. CLASSROOMS
K 1 2 3 4 5
18 17 21 21 22 19 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


18 17 21 21 22 19 MUSIC
18 17 21 20 21 19 STRINGS
18 17 CAFETERIA
17 GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
19 22 22 21 21 22 PRE-SCHOOL

2010-2011
19 22 22 21 21 21 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
19 21 22 20 20 21 SELF-CONT. SPED
18 21
SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
19 19 21 22 21 21 SPEECH

2011-2012
19 18 21 22 21 20 ESL
19 18 21 21 20 20 ELL
18 18 21 LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
18 19 18 21 22 21
SOCIAL WORKER

2012-2013
18 18 18 21 22 20
18 18 18 20 21 20 WELCOME CENTER
18 18 17 20 FAMILY RESOURCE

4 5 PROJECT EXCEL

5 5 LD
K 1 2 3 4 5
A FIE 19 18 18 23 21 22
LL
4

2013-2014
BA 19 18 18 23 21 21
UE

SE
BA 18 17 18 23 21 21
EN

4 18 17 17 20

SITE FACILITIES
AV

K 1 2 3 4 5 PLAY AREA K-2


3 19 18 17 23 24 21 PLAY AREA 3-5
L

2014-2015
19 18 17 23 23 21 BASKETBALL COURT
LL

18 18 17 23 23 20 BASEBALL FIELD
18 18 17 20 SOCCER FIELD
HI

CAFE OPEN PLAY AREA


PLAY AREA 3
M
RY

2 3 GYM
ER

2 + DROP-OFF AREA NEEDS NEW CURB CUTS


WB

NARAMAKE ELEMENTARY SCHOOL FACILITY DEFICIENCIES


+ 1 TEMPORARY CLASSROOM
PK
RA

+ ADDITIONAL CLASSROOM CARVED OUT OF MEDIA CENTER TO ACCOMMODATE ENROLLMENT


PK
ST

PLAY AREA
+ MUSIC & STRINGS SHARE SPACE WITH STORAGE FOR FAMILY RESOURCE CENTER

1 + PSYCHOLOGIST IN ELECTRICAL CLOSET


2
1 + LITERACY COACH, ASST. PRINCIPAL, SOCIAL WORKER & ACAD. TALENTED: SOUND ISSUES

K + SHARED GYMNASIUM & CAFETERIA


K
1 ET
RE
+ MORE RESOURCE SPACE NEEDED FOR ELL INFLUX
K ST + POTENTIAL RELOCATION OF FAMILY RESOURCE CENTER TO ALTERNATE FACILITY
G
K KIN + (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2010

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2011

+ (3) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

+ (3) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013

KING STREET
+ (3) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN NARAMAKE ELEMENTARY SCHOOL
RELOCATE TO
ALTERNATE FACILITY

2 L
122
Media Center/Library

4
2
116

4
128
3388 SF
Second Grade 119 127 Fourth Grade
804 SF Second Grade 797 SF
Fourth Grade
751 SF 757 SF

PK A 5
115 117 123 124 129 131

3 3
Pre-K Resource Literacy Coach AV/Psych. Art Fifth Grade

3
121

4
756 SF 239 SF 242 SF 125 599 SF
606 SF 755 SF
120 Third Grade Third Grade 126
Third Grade 553 SF 559 SF Fourth Grade
147 654 SF 632 SF 130

1
Social Worker
102 118 193 SF
Asst. Principal 148
Speech 164 SF
First Grade AT/ELL
936 SF 168 SF 190 SF

1 PK 5
101 114 132
First Grade Pre-K 142 139 Fifth Grade
945 SF 681 SF Family Resource Center Storage 645 SF

M
462 SF 416 SF
143

1
113 Music/Strings/Family Resource Storage 140 138
108 Office 1137 SF 141
Storage Kitchen 137
First Grade 390 SF
HVAC/Storage
145 SF 328 SF

K
702 SF
Custodian
106 112 182 SF 252 SF
134
Kindergarten 111 Principal 136
Nurse 331 SF Boiler Room Meter Room
896 SF
878 SF 104 SF
306 SF

K 5
110 135 133
103 200
Faculty Transformer Storage
Kindergarten 584 SF
Temp. Classroom
1050 SF 203 SF 346 SF 728 SF

2 GYM CAFE
109
107 Work Room 144
146
Second Grade 260 SF Stage Auditorium/Gymnasium/Cafeteria
875 SF 793 SF
4679 SF

K
105
Kindergarten
1046 SF

K
104
Kindergarten 145
1007 SF Storage
119 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN NARAMAKE ELEMENTARY SCHOOL
RELOCATE TO
ALTERNATE FACILITY

2 L
597
Media Center/Library

4
2
607

4
3388 SF 564
Second Grade 569 571 Fourth Grade Classroom
804 SF Second Grade 797 SF
Fourth Grade
751 SF 757 SF

PK A 5
567 593 592 565
608 573

3 3
Pre-K Resource Literacy Coach AV/Psych. Art Fifth Grade

3
562

4
756 SF 239 SF 242 SF 563 599 SF
606 SF 755 SF
570 Third Grade Third Grade 572
Third Grade 553 SF 559 SF Fourth Grade
555 654 SF 632 SF 591 Classroom

1
Social Worker
559 561 193 SF
Asst. Principal 558
Speech 164 SF
First Grade AT/ELL
936 SF 168 SF 190 SF

1 PK 5
600 568 574
First Grade Pre-K 594 548 Fifth Grade
945 SF 681 SF Family Resource Center Storage 645 SF

M
462 SF 416 SF
566

1
609 Music/Strings/Family Resource Storage 546 545
605 Office 1137 SF 547
Storage Kitchen 544 Classroom
First Grade 390 SF
HVAC/Storage
145 SF 328 SF

K
702 SF
Custodian
604 556 182 SF 252 SF
541
Kindergarten 590 Principal 543
Nurse 331 SF Boiler Room Meter Room
896 SF
878 SF 104 SF
306 SF

K
612 542 599
601
Faculty Transformer Storage
Kindergarten 584 SF
1050 SF 203 SF 346 SF

2 GYM CAFE
589
Classroom
606 Work Room 595
596
Second Grade 260 SF Stage Auditorium/Gymnasium/Cafeteria
875 SF 793 SF
4679 SF

K
603
Kindergarten
1046 SF

K
602
Kindergarten 598
1007 SF Storage
119 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN NARAMAKE ELEMENTARY SCHOOL
ROWAYTON ELEMENTARY SCHOOL
1 ROTON AVENUE, NORWALK, CONNECTICUT 06853

2009-2010 ENROLLMENT: 470


AGE : ORIGINAL: 1939 AGE : ADDITION: 1950 | 1957 | 1968 | 1992
BUILDING AREA: 51,139 SF SITE: 14 ACRES

TEMP. CLASSROOMS
K 1 2 3 4 5
22 20 20 17 19 22 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


21 20 20 17 19 22 MUSIC
21 20 20 17 18 22 STRINGS
21 19 19 16 18 CAFETERIA
19 GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
22 21 19 20 23 19 PRE-SCHOOL

2010-2011
22 21 19 19 22 18 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
22 20 19 19 22 18 SELF-CONT. SPED
22 20 19 19 18
19 SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
22 22 20 24 20 22 SPEECH

2011-2012
22 21 20 23 19 22 ESL
22 21 20 23 19 22 ELL
BASKETBALL
21 21 20 23 19 LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
2 2 21 21 21 20 24 19
OT/PT
SOCIAL WORKER

2012-2013
5 21 21 21 20 23 19
3 3 21 21 21 19 23 19 WELCOME CENTER
5
4 21 21 20 19 23 19 FAMILY RESOURCE
4 PROJECT EXCEL

ET
5 GYM 3 K 1 2 3 4 5
4 22 21 21 21 20 23

STRE

2013-2014
22 20 21 20 20 23
L
M PLAY AREA
21 20 20 20 20 23

K 21 20 20 20 19 23
A SOCCER / OPEN AREA

SITE FACILITIES
K 1 2 3 4 5 PLAY AREA K-2

EY
CAFE
K 22 21 20 20 21 20 PLAY AREA 3-5

2014-2015
KINL
22 21 20 20 21 20 BASKETBALL COURT
21 21 20 20 20 19 BASEBALL FIELD
1 2 2 K 21 20 19 20 20 19 SOCCER FIELD
OPEN PLAY AREA

MC
PLAY AREA
1 1 1 1 K

LD
ALL FIE
BASEB + BUS / PARKING / DROP-OFF DEFICIENCIES

ROWAYTON ELEMENTARY SCHOOL FACILITY DEFICIENCIES


+ 4 TEMPORARY CLASSROOMS

+ NON ADA CLASSROOM ON 2ND FLOOR (NO ELEVATOR)

+ ACADEMICALLY TALENTED IN CLOSET ON 2ND FLOOR (NO ELEVATOR)

+ GYMNASIUM TOO SMALL TO ACCOMMODATE ENTIRE STUDENT ENROLLMENT

+ ELECTRICAL INFRASTRUCTURE DEFICIENCIES

+ ADDITIONAL SELF-CONTAINED SPECIAL ED. CURRICULUM PLANNED


ROTO
N AVENU + (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2010
E
+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013

+ (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN ROWAYTON ELEMENTARY SCHOOL
2 2
148
Special Ed. P.T. 147 148
389 SF Temp. Classroom Temp. Classroom
625 SF 625 SF
101 102
Self-Contained Special Ed. Self-Contained Special Ed.
921 SF 937 SF

5
146
Fifth Grade 103

3
Work Room

3
767 SF
144 140 SF
149
Third Grade

5
759 SF Temp. Classroom
142 625 SF
Fifth Grade

4
104
773 SF
140 Resource
Fourth Grade 287 SF
767 SF

4
145
Fourth Grade 105
107

5 3
Electrical/Storage

GYM
762 SF Storage
143 126 SF 150
106 78 SF
Fifth Grade 147 Temp. Classroom

4
754 SF Library Work Room Gymnasium 625 SF
141 109 2416 SF
303 SF 108
Fourth Grade Office Storage
769 SF 80 SF 78 SF

110
111 Speech

L
ELL 174 SF
112 103 SF
Library

M
1420 SF
139
Music
481 SF

K
113
Kindergarten
138
939 SF

A
Office/Storage
137 SF 115 114
STRINGS TO MOVE TO EXISTING Art AT/Strings
MUSIC. ACADEMICALLY TALENTD TO 688 SF 259 SF
HAVE DEDICATED SPACE.
137

CAFE
Kitchen
135
439 SF
Auditorium/Cafeteria

K
2238 SF CAFETERIA TO EXPAND INTO
117 116
EXISTING STAGE AREA Kindergarten
Self-Contained Special Ed.
654 SF 1082 SF

136
Receiving
110 SF

1 2 2
127 126 125 123

K
134 First Grade Asst. PrincipalSecond Grade Second Grade 118
668 SF 188 SF 673 SF 119
133 Stage 808 SF
Resource Kindergarten
Social Worker/Psych. 698 SF 136 SF 813 SF
240 SF

1 1 1 1
132
Faculty/Work Room 130 128 122 121
129

K
428 SF 124
Office First Grade First Grade First Grade
131 Nurse 818 SF First Grade 120
350 SF 681 SF 832 SF
169 SF 787 SF
Principal Kindergarten
118 SF 835 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN ROWAYTON ELEMENTARY SCHOOL
644
Special Ed. P.T.
389 SF

643 645
Self-Contained Special Ed. Self-Contained Special Ed. Classroom Classroom Classroom Classroom
921 SF 937 SF

5
666
Fifth Grade 704

3
767 SF Work Room
667 140 SF
Third Grade

5
759 SF
668
Fifth Grade

4
703
773 SF
669 Resource
Fourth Grade 287 SF
767 SF

4
670
Fourth Grade 626

5
Electrical/Storage

GYM
762 SF
671 126 SF Gymnasium Music Art
Fifth Grade 642

4
672
754 SF Library Work Room
303 SF 615
Fourth Grade Office
769 SF 80 SF

616
617 Speech

L
ELL 174 SF
641 103 SF
Library

M
1420 SF
623
Stage
Music
481 SF

K
624
Kindergarten
630
939 SF

A
Office/Storage
137 SF 700 618
STRINGS TO MOVE TO EXISTING Art AT/Strings
MUSIC. ACADEMICALLY TALENTD TO 688 SF 259 SF
HAVE DEDICATED SPACE.
631

CAFE
Kitchen
635
439 SF
Auditorium/Cafeteria

K
2238 SF CAFETERIA TO EXPAND INTO
701 678
EXISTING STAGE AREA Kindergarten
Self-Contained Special Ed.
654 SF 1082 SF

632
Receiving
110 SF

1 2 2
680 619 679 646

K
634 First Grade Asst. PrincipalSecond Grade Second Grade 629
668 SF 188 SF 673 SF 633
640 Stage 808 SF
Resource Kindergarten
Social Worker/Psych. 698 SF 136 SF 813 SF
240 SF

1 1 1 1
659
Faculty/Work Room 621 673 675 676
620

K
428 SF 674
Office First Grade First Grade First Grade
622 Nurse 818 SF First Grade 677
350 SF 681 SF 832 SF
169 SF 787 SF
Principal Kindergarten
118 SF 835 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN ROWAYTON ELEMENTARY SCHOOL
SILVERMINE ELEMENTARY SCHOOL
157 PERRY AVENUE, NORWALK, CONNECTICUT 06850

2009-2010 ENROLLMENT: 338


AGE : ORIGINAL: 1965 AGE : ADDITION: 1996
BUILDING AREA: 48,626 SF SITE: 11 ACRES

K 1 2 3 4 5
19 17 19 17 18 15 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


19 17 19 17 18 15 MUSIC
18 17 18 16 17 15 STRINGS
16 14 CAFETERIA
GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
21 18 22 19 17 18 PRE-SCHOOL

2010-2011
E
20 18 22 18 17 17 SCIENCE

PROGRAM SPACES
U

CLASSROOM & ENROLLMENT DISTRIBUTION


20 18 21 18 16 17

EN
SELF-CONT. SPED

AV
SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
21 20 18 22 19 17 SPEECH

RY

2011-2012
20 20 18 21 18 16 ESL

R
20 19 17 21 18 16 ELL

PE
LITERACY

SOCCER / OPEN AREA PSYCHOLOGIST


K 1 2 3 4 5
OT/PT
CAFE 20 20 19 18 22 18
SOCIAL WORKER

2012-2013
20 20 19 17 21 18
19 19 19 17 21 18 WELCOME CENTER
FAMILY RESOURCE
PROJECT EXCEL
K 1 2 3 4 5
20 19 19 19 18 21
GYM

2013-2014
20 19 19 19 18 21
K ASPHALT
20 19 19 18 17 21
PLAY AREA

SITE FACILITIES
PLAY AREA K-2
K K 1 2 3 4 5
20 20 19 19 19 18 PLAY AREA 3-5
1 K M

2014-2015
20 19 19 19 19 17 BASKETBALL COURT
LD
ALL FIE
BASEB 20 19 18 18 19 17 BASEBALL FIELD
1 SOCCER FIELD
OPEN PLAY AREA
2
L
2
3
3 + NO LIFT TO STAGE

SILVERMINE ELEMENTARY SCHOOL FACILITY DEFICIENCIES


4
A + SHARED GYMNASIUM & CAFETERIA
3 2
PLAY AREA 4 + SOME RESTROOMS ARE NOT ADA

4 5 + AMPLE SPACE TO ACCOMMODATE EXPANDED ENROLLMENT

+ CAN POTENTIALLY ACCEPT PRE-K FROM CRANBURY E.S.


5
BASKETBALL 5
5

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN SILVERMINE ELEMENTARY SCHOOL
(2) CRANBURY ELEMENTARY
SCHOOL PRE-K CLASSROOMS

135
Stage
788 SF

134
P.E. Office

GYM
152 SF

133
Strings
339 SF 136
Gymnasium/Cafeteria

5 4 1
5006 SF

3 3 1 1
102

CAFE
101 119 114
Special Ed. 120 121 122 123 124 125
Fifth Grade Fourth Grade Work Room 137
843 SF 193 SF Third Grade Third Grade Reading/Literacy First Grade First Grade First Grade
910 SF 72 SF
857 SF 859 SF 847 SF 784 SF 1009 SF Cafeteria
1015 SF
2276 SF

5 4 A 3
103 118 117 116 144

K
140

K
Fifth Grade Fourth Grade Art Third Grade AT/ESL/Math 138
622 SF 131 132 Copy Room
788 SF 704 SF 704 SF 675 SF 126 General Office
Social Worker/Psych. Kindergarten Kindergarten 367 SF
192 SF 139
592 SF 1075 SF 1249 SF Kitchen

L
445 SF
115 142 141
143
Library Principal Conference Nurse

5 2 K
2040 SF 200 SF 230 SF
111 112 128 119 SF
104 Kindergarten
Second Grade Health/Flex
Fifth Grade 726 SF 690 SF 127 718 SF
822 SF Intervention
292 SF

145
OT
116 SF

2 2 M
113

5 4
Speech 108 109 110 129 130
105 107
106 131 SF Second Grade Second Grade Faculty Music Special Ed.
Fifth Grade Asst. Principal Fourth Grade 846 SF 746 SF 417 SF 833 SF 791 SF
843 SF 883 SF
190 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN SILVERMINE ELEMENTARY SCHOOL
TRACEY ELEMENTARY SCHOOL
20 CAMP STREET, NORWALK, CONNECTICUT 06851

2009-2010 ENROLLMENT: 391


AGE : ORIGINAL: 1939 AGE : ADDITION: 1966 | 1998
BUILDING AREA: 54,374 SF SITE: 6 ACRES

K 1 2 3 4 5
19 21 18 15 21 23 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


19 21 17 15 20 22 MUSIC
19 21 17 15 20 22 STRINGS
18 17 CAFETERIA
GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
17 19 21 23 23 20 PRE-SCHOOL

2010-2011
17 18 20 22 22 20 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
17 18 20 22 20 SELF-CONT. SPED
16 18
SPECIAL ED.
K 1 2 3 4 5 ACADEM. TALENTED
17 22 18 20 23 22 SPEECH

2011-2012
17 22 18 20 22 22 ESL
17 21 18 20 22 ELL
16 17 LITERACY

PSYCHOLOGIST
EET

K 1 2 3 4 5
OT/PT
22 22 21 23 20 22
M SOCIAL WORKER
GYM

2012-2013
21 22 21 23 20 22
STR

LD 21 21 21 23 20 22 WELCOME CENTER
ALL FIE
BASEB FAMILY RESOURCE
PROJECT EXCEL
K 1 2 3 4 5
P

22 21 21 21 24 20
CAM

2013-2014
22 21 21 21 23 20
1
22 20 21 20 23 19

CAFE

SITE FACILITIES
1 L
K 1 2 3 4 5 PLAY AREA K-2
22 22 20 21 21 23 PLAY AREA 3-5

2014-2015
22 21 20 21 21 23 BASKETBALL COURT
22 21 20 20 21 23 BASEBALL FIELD
PK SOCCER FIELD
1 OPEN PLAY AREA

K K
K K

+ INSUFFICIENT PARKING

TRACEY ELEMENTARY SCHOOL FACILITY DEFICIENCIES


PLAY AREA + NO COMPUTER LAB
SOCCER
+ ACCESS TO STRINGS & AT/ELL THOUGH GYMNASIUM

+ NO RESTROOMS CLOSE TO CAFETERIA

+ SPECIAL EDUCATION ROOM IN FORMER RESTROOM

+ HEATING DEFICIENCY (VARIATIONS IN TEMPERATURE)

+ ELECTRICAL INFRASTRUCTURE & TELE/DATA DEFICIENCIES

+ LIGHTING IN HALLWAYS & CLASSROOMS INADEQUATE

+ ADA DEFICIENCIES (DOOR HARDWARE, NO LIFT TO STAGE, ENTRANCE TO BUILDING)

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN TRACEY ELEMENTARY SCHOOL
1
Mechanical Room
1504 SF

2 3
Custodian Room Storage
634 SF 611 SF

4
Storage
182 SF

6
Meeting Room/PTO
750 SF

5
Storage
7 1203 SF
Mechanical Room
493 SF

9
8 Storage
Boiler Room 764 SF
1358 SF

10
Electrical
200 SF

11
Storage
218 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A BASEMENT FLOOR PLAN TRACEY ELEMENTARY SCHOOL
129
Kitchen

CAFE
560 SF
101 104 130
Storage Storage Cafeteria
94 SF 102 103 94 SF 3217 SF
AT/ELL Strings
197 SF 202 SF

K
128
Kindergarten
1045 SF

105
131
Stage

L
967 SF
Flex/Mentor
622 SF 132
Library

K
2198 SF
127
135 134 Kindergarten
Bi-Lingual Office 1073 SF
317 SF 154 SF

126
Special Ed.

GYM
654 SF
106
Gymnasium
5658 SF

112
Office

1 1 PK K
173 SF 116 118 120 122
First Grade Work Room First Grade Pre-K 124
114
973 SF 296 SF 927 SF 937 SF Kindergarten
Copy Room
553 1247 SF
Work Room 129 SF
155 SF

108 119
Asst. Principal Meeting Room

M 1 K
156 SF 642 SF
107 110 583
115 121 123
Music Office Nurse 117 Work Room First Grade Kindergarten
869 SF 109 477 SF
358 SF Social Worker/Psych. 133 262 SF 853 SF 1150 SF
Principal 294 SF Speech
212 SF 225 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN TRACEY ELEMENTARY SCHOOL
5 5
219
218
Fifth Grade
Fifth Grade 1239 SF
1342 SF

4
215
Fourth Grade
1043 SF

5 4
217
Fifth Grade 216

A
1275 SF Fourth Grade 214
1087 SF
Art
1018 SF

213
Intervention 220
112 SF OT
212 350 SF
Copy Room
57 SF
222
Special Ed./Storage

2 3
265 SF 205 207 209
221
Second Grade Work Room Third Grade Literacy/Bi-lingual
895 SF 274 SF 837 SF 842 SF
211
Teachers Lounge
1070 SF
221
Resource
345 SF

3 2 2 3 2 4
201 202 203 204 206 208 210
223
Third Grade Second Grade Work Room Second Grade Storage Third Grade Second Grade Fourth Grade
864 SF 830 SF 331 SF 1017 SF 1118 SF 871 SF 1015 SF
296 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SECOND FLOOR PLAN TRACEY ELEMENTARY SCHOOL
WOLFPIT ELEMENTARY SCHOOL
1 STARLIGHT DRIVE, NORWALK, CONNECTICUT 06851

2009-2010 ENROLLMENT: 317


AGE : ORIGINAL: 1964 AGE : ADDITION: ---
BUILDING AREA: 50,560 SF SITE: 11 ACRES

K 1 2 3 4 5
22 19 18 20 23 21 ART

2009-2010

ADDITIONAL CLASSROOMS REQUIREMENT PER PROJECTED ENROLLMENT


22 19 18 20 22 21 MUSIC
21 19 19 STRINGS
CAFETERIA
GYMNASIUM
K 1 2 3 4 5 COMPUTER LAB
20 21 19 18 20 22 PRE-SCHOOL

2010-2011
19 21 19 17 20 22 SCIENCE

PROGRAM SPACES
CLASSROOM & ENROLLMENT DISTRIBUTION
19 21 18 19 SELF-CONT. SPED

SPECIAL ED.
ACADEM. TALENTED
BASEBALL FIELD K 1 2 3 4 5
19 19 21 19 18 20 SPEECH

2011-2012
19 19 20 18 17 19 ESL
19 18 20 18 19 ELL
LITERACY

PSYCHOLOGIST
K 1 2 3 4 5
OT/PT
19 19 19 20 19 17
SOCIAL WORKER

2012-2013
19 18 18 20 18 17
18 18 18 20 18 WELCOME CENTER
FAMILY RESOURCE
PROJECT EXCEL
K 1 2 3 4 5
19 18 18 18 21 18

2013-2014
19 18 18 18 20 18
19 18 18 18 20 18

SITE FACILITIES
K 1 2 3 4 5 PLAY AREA K-2
19 19 18 18 19 20 PLAY AREA 3-5

2014-2015
PLAY AREA 19 18 18 18 18 20 BASKETBALL COURT
19 18 17 17 18 20 BASEBALL FIELD
SOCCER FIELD
OPEN PLAY AREA

5 5 4 4 3 + NON-ADA SCHOOL

WOLFPIT ELEMENTARY SCHOOL FACILITY DEFICIENCIES


+ SHARED GYMNASIUM & CAFETERIA
A 3 2 3 + ADA DEFICIENCIES (DOOR HARDWARE, RESTROOMS, CATWALK RAILING, NO LIFT TO STAGE)
STA

CAFE GYM
M + (1) ADDITIONAL CLASSROOM WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2010
PC K
RL

L + (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2011


IGH

+ (2) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2012

K + (3) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2013


T

BASKETBALL + (3) ADDITIONAL CLASSROOMS WILL BE REQUIRED TO ACCOMMODATE ENROLLMENT IN 2014


K
DRI

+ POTENTIAL CONVERSION OF LOWER LEVEL STORAGE AREA TO COMPUTER LAB


VE

WOLFPIT AVENUE

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A SITE PLAN WOLFPIT ELEMENTARY SCHOOL
1 1 1 2 2
114

PK
101 102 103 104 105 PT/OT
106
First Grade First Grade First Grade Second Grade Second Grade 252 SF
883 SF 907 SF 867 SF 911 SF 879 SF
Pre-K
552 SF

PK
113 111 109 107
Fan Room Storage Storage Pre-K
564 SF 112 1456 SF 110 1464 SF 108 801 SF
Storage Custodian Storage
197 SF 196 SF 196 SF

CONVERT STORAGE SPACE


TO NEW COMPUTER LAB

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A BASEMENT FLOOR PLAN WOLFPIT ELEMENTARY SCHOOL
5 5 4 4 3
201 203 205 207 209 211
Special Ed. Fifth Grade Fifth Grade Fourth Grade Fourth Grade Third Grade
860 SF 834 SF 802 SF 848 SF 846 SF 778 SF
242
241 Mech. 245
243 244
47 SF
Custodian Work Room Literacy OT/PT
320 SF 268 SF 547 SF 217 SF

240
Storage

A 3 2 3
106 SF
202 204 206 208 210 212
239 Art AT/Literacy Third Grade Second Grade ELL Third Grade
Kitchen 227 833 SF 799 SF 768 SF 812 SF 810 SF 745 SF
254 SF
Asst. Principal
229 130 SF
228
238 Faculty Nurse
Storage 353 SF 214 SF
122 SF

CAFE GYM
231 224 217 216
237 234

M
Stage General Office Psych. Speech
Boiler Room Cafeteria/Gymnasium 550 SF 219 218 236 SF 223 SF
764 SF 438 SF 220
5351 SF
Librarian Office Music/Strings Social Worker

PC K
739 SF 237 SF
255 SF 215 213
Computer Lab Kindergarten
1056 SF 1060 SF

L
236
221
Storage 246
374 SF Principal Library
2314 SF
190 SF

K
BASEMENT
222
Kindergarten
1052 SF

K
223
Kindergarten
1249 SF

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A FIRST FLOOR PLAN WOLFPIT ELEMENTARY SCHOOL
NORWALK PUBLIC SCHOOLS : ELEMENTARY SCHOOLS SPACE ASSESSMENT MATRIX

2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 Change in Classroom Needs Temp. Program Spaces Building Infrastructure Site Facilities
Total K 1 2 3 4 5 Total K 1 2 3 4 5 Total K 1 2 3 4 5 Total K 1 2 3 4 5 Total K 1 2 3 4 5 Total K 1 2 3 4 5 10-'11 11-'12 12-'13 13-'14 14-'15 Art Music Strings Café. Gym PC Lab Pre-K Science SC Sped SPED AT Speech ESL ELL Literacy Psych. OT/PT Soc.W. W.Ctr. Family Excel A/C Elect. H/C Lift Play K-2 Play 3-5 Basketball Baseball Soccer Open Area

BROOKSIDE 438 21 18 20 17 21 19 437 21 21 18 20 23 20 450 20 20 20 23 20 23 454 20 20 20 20 23 20 451 20 19 19 19 20 22 458 20 20 19 19 19 20 BROOKSIDE


21 18 20 17 20 19 20 20 17 20 23 20 20 20 20 22 20 22 20 20 19 19 22 19 20 19 19 19 20 22 20 20 19 19 19 19
21 18 20 17 20 18 20 20 17 19 22 20 20 20 20 22 19 22 19 19 19 19 22 19 20 19 19 19 19 22 20 19 18 18 19 19 +1 +1 +1
21 17 20 17 18 20 20 17 19 20 19 19 19 19 19 19 19 19 20 19 19 18 19 19 19 18 18 19 19 +2

COLUMBUS 343 22 19 18 21 23 21 345 22 19 19 19 21 24 341 21 20 20 19 20 22 343 20 21 21 21 20 20 343 21 20 20 21 17 20 343 20 21 20 20 21 21 COLUMBUS


1938 21 18 18 20 23 21 22 19 19 18 21 23 21 20 20 19 19 22 20 20 20 21 20 20 21 20 20 20 17 20 20 20 20 20 20 21
1980 18 18 20 22 20 19 18 18 21 23 20 19 19 19 21 20 20 20 20 19 20 20 20 17 19 20 19 20 20 20

CRANBURY 447 18 19 20 21 21 21 459 21 22 18 19 21 21 450 20 20 21 23 19 21 459 20 20 20 21 23 19 458 20 19 19 19 21 23 463 20 20 19 19 19 21 CRANBURY


1961 18 18 20 21 21 20 20 22 18 19 21 21 20 20 21 23 19 21 20 20 19 21 23 19 20 19 19 19 21 23 20 20 19 19 19 21
1991 18 18 19 21 21 20 20 21 18 19 21 20 20 20 21 23 19 20 19 19 19 20 23 19 20 19 19 19 21 22 20 19 18 18 19 20 +1 +1 +1 +1
18 18 19 20 20 21 17 19 20 20 19 21 19 19 19 19 20 18 20 19 19 18 20 19 19 18 18 19 20 +2
17

FOX RUN 449 20 20 17 19 20 19 453 22 20 19 22 19 19 471 21 21 19 19 22 19 471 21 21 20 23 19 21 485 21 20 20 20 24 19 488 21 20 20 20 20 23 FOX RUN
1961 20 20 16 19 19 19 21 20 19 21 19 19 21 21 19 19 21 18 20 20 20 23 19 21 21 20 20 20 23 18 21 20 19 19 20 23
20 19 16 18 19 18 21 19 19 21 18 19 21 20 19 18 21 18 20 20 20 23 18 21 21 20 20 19 23 18 21 20 19 19 20 23 +1 +1 +1
20 19 16 18 18 21 19 19 18 21 20 19 18 18 20 20 20 23 18 20 19 19 19 23 18 20 20 19 19 19 23
20 19 18

JEFFERSON 538 22 21 20 16 20 19 558 21 21 20 20 19 20 574 21 20 21 20 20 19 587 20 20 20 20 20 20 585 21 20 20 24 21 24 582 21 20 19 24 24 20 JEFFERSON


1971 22 21 20 15 20 19 21 21 20 20 19 19 21 20 21 20 20 19 20 20 19 20 20 20 20 19 19 24 20 24 20 20 19 24 24 20
22 20 20 15 19 18 21 21 20 20 19 19 20 20 20 19 20 19 20 20 19 20 19 19 20 19 19 24 20 24 20 20 19 23 24 20 +1 +1
21 20 20 15 19 18 20 21 20 19 19 19 20 20 20 19 19 18 20 19 19 20 19 19 20 19 19 23 20 24 20 19 19 23 24 20 +2
21 20 20 15 20 21 19 19 20 20 20 19 19 19 19 19 20 19 19 20 19 19 20 20 19 18 19

KENDALL 489 22 18 21 21 19 23 479 22 22 18 21 21 24 486 22 21 21 23 21 21 479 21 21 21 21 23 20 478 22 21 21 20 21 23 487 22 21 20 20 21 21 KENDALL


1951 22 18 21 21 18 22 22 21 18 20 21 24 22 21 21 23 20 21 21 21 21 20 23 20 22 20 21 20 21 22 21 21 20 20 20 20
1966 22 18 21 21 18 22 22 21 17 20 21 24 22 21 21 22 20 21 21 21 20 20 22 20 21 20 20 20 20 22 21 20 19 20 20 20 +1
1989 22 18 20 21 18 22 21 21 17 20 21 21 21 20 20 20 21 21 20 20 20 21 20 20 20 20 21 20 19 20 20 20

MARVIN 446 20 22 21 19 23 21 462 21 19 21 20 19 23 470 21 21 19 21 20 24 471 21 21 20 24 21 20 470 21 20 20 20 24 20 466 21 20 20 20 20 24 MARVIN


1971 19 21 20 18 23 20 21 19 21 20 18 23 21 20 18 20 20 24 20 20 20 24 20 20 21 20 20 19 24 20 21 20 19 19 20 24
1996 19 21 20 18 23 20 21 19 21 20 18 22 21 20 18 20 20 24 20 20 20 23 20 19 21 20 20 19 24 20 21 20 19 19 19 23 +1 +1 +1 +1 +1
19 21 20 18 21 18 20 19 18 21 20 18 20 19 20 20 19 20 19 20 19 19 19 20 20 20 19 19 19 +2 +2 +2 +2 +2

NARAMAKE 404 18 17 21 21 22 19 415 19 22 22 21 21 22 420 19 19 21 22 21 21 424 18 19 18 21 22 21 431 19 18 18 23 21 22 435 19 18 17 23 24 21 NARAMAKE


1961 18 17 21 21 22 19 19 22 22 21 21 21 19 18 21 22 21 20 18 18 18 21 22 20 19 18 18 23 21 21 19 18 17 23 23 21
1996 18 17 21 20 21 19 19 21 22 20 20 21 19 18 21 21 20 20 18 18 18 20 21 20 18 17 18 23 21 21 18 18 17 23 23 20 +1 +1 +1 +1 +1
18 17 18 21 18 18 21 18 18 17 20 18 17 17 20 18 18 17 20 +2 +2 +2 +2
17 +3 +3 +3

ROWAYTON 469 22 20 20 17 19 22 482 22 21 19 20 23 19 488 22 22 20 24 20 22 498 21 21 21 20 24 19 501 22 21 21 21 20 23 488 22 21 20 20 21 20 ROWAYTON


1950 21 20 20 17 19 22 22 21 19 19 22 18 22 21 20 23 19 22 21 21 21 20 23 19 22 20 21 20 20 23 22 21 20 20 21 20
1957 21 20 20 17 18 22 22 20 19 19 22 18 22 21 20 23 19 22 21 21 21 19 23 19 21 20 20 20 20 23 21 21 20 20 20 19 +1 +1 +1 +1
1968 21 19 19 16 18 22 20 19 19 18 21 21 20 23 19 21 21 20 19 23 19 21 20 20 20 19 23 21 20 19 20 20 19
1992 19 19

SILVERMINE 341 19 17 19 17 18 15 337 21 18 22 19 17 18 341 21 20 18 22 19 17 345 20 20 19 18 22 18 346 20 19 19 19 18 21 339 20 20 19 19 19 18 SILVERMINE


1965 19 17 19 17 18 15 20 18 22 18 17 17 20 20 18 21 18 16 20 20 19 17 21 18 20 19 19 19 18 21 20 19 19 19 19 17 -1 -1 -1 -1 -1
1996 18 17 18 16 17 15 20 18 21 18 16 17 20 19 17 21 18 16 19 19 19 17 21 18 20 19 19 18 17 21 20 19 18 18 19 17
16 14

TRACEY 380 19 21 18 15 21 23 373 17 19 21 23 23 20 374 17 22 18 20 23 22 387 22 22 21 23 20 22 382 22 21 21 21 24 20 384 22 22 20 21 21 23 -2 -2 -2 TRACEY


1939 19 21 17 15 20 22 17 18 20 22 22 20 17 22 18 20 22 22 21 22 21 23 20 22 22 21 21 21 23 20 22 21 20 21 21 23 -1 -1 -1 -1 -1
1966 19 21 17 15 20 22 17 18 20 22 20 17 21 18 20 22 21 21 21 23 20 22 22 20 21 20 23 19 22 21 20 20 21 23
1998 18 17 16 18 16 17

WOLFPIT 304 22 19 18 20 23 21 315 20 21 19 18 20 22 322 19 19 21 19 18 20 315 19 19 19 20 19 17 334 19 18 18 18 21 18 333 19 19 18 18 19 20 WOLFPIT


1964 22 19 18 20 22 21 19 21 19 17 20 22 19 19 20 18 17 19 19 18 18 20 18 17 19 18 18 18 20 18 19 18 18 18 18 20
21 19 19 19 21 18 19 19 18 20 18 19 18 18 18 20 18 19 18 18 18 20 18 19 18 17 17 18 20 +1 +1 +1 +1 +1
+2 +2 +2 +2
+3 +3

BROOKSIDE COLUMBUS CRANBURY FOX RUN JEFFERSON KENDALL MARVIN NARAMAKE ROWAYTON SILVERMINE TRACEY WOLFPIT

NORWALK PUBLIC SCHOOLS


NORWALK PUBLIC SCHOOLS : ELEMENTARY SCHOOLS PROJECTS BUDGET SUMMARY

NEW CONSTRUCTION INTERIOR RENOVATIONS SITE WORK DEMO. & TEMP. CLASSROOM RELOC. BUDGET TOTALS COMMENTS
Building * Cost *** Spaces Cost Areas Cost Scope Cost**** Total Const. Costs Total Soft Costs** Total Project Budget

Columbus Cafeteria 2,070 SF


2 Classrooms 1,800 SF
Resource/Literacy 550 SF
Kitchen 580 SF
Total 5,000 SF
Circulation 20% 1,000 SF
Grand Total 6,000 SF $1,920,000 $1,920,000 $326,400 $2,246,400

Cranbury Cafeteria 2,800 SF


Art 1,800 SF
Music 1,100 SF
Expanded Library 730 SF Library 800 SF
Expanded Kitchen 350 SF
Total 6,780 SF
Circulation 20% 1,356 SF
Grand Total 8,136 SF $2,603,520 Grand Total 800 SF $60,000 $2,663,520 $452,798 $3,116,318

Jefferson 9 Classrooms 8,100 SF Loading Lot & Access 6,500 SF Relocate 8 classrooms $120,000
Cafeteria 3,550 SF
Restrooms 575 SF
Kitchen 1,000 SF
Total 13,225 SF
Circulation 25% 3,306 SF
Grand Total 16,531 SF $5,290,000 Grand Total 6,500 SF $65,000 Grand Total $120,000 $5,475,000 $930,750 $6,405,750

Naramake 4 Classrooms 3,600 SF Relocate 1 classroom $15,000


Total 3,600 SF
Circulation 20% 720 SF
Grand Total 4,320 SF $1,382,400 Grand Total $15,000 $1,397,400 $237,558 $1,634,958

Rowayton 4 Classrooms 3,600 SF Library 700 SF Relocate 4 classrooms $60,000


Art 1,800 SF Demolition $15,000
Music 1,100 SF
Expanded Gym/Stage 3,300 SF Gymnasium 2,416 SF
Total 9,800 SF
Circulation 20% 1,960 SF
Grand Total 11,760 SF $3,763,200 Grand Total 3,116 SF $233,700 Grand Total 75,000 $4,071,900 $692,223 $4,764,123

* Space square footages from the State of Connecticut Department of Education Space Guildines for School Construction

** Soft Costs are based on the following breakdown:


Architectural and Design Fees = 5%
Owner Staffing costs (project oversight) = 3%
Moving and Move Management = 1%
Builder's Risk Insurance = 0.5%
Buiding Permit Fees = 1.5%
Other Costs (Security Services, Utility Company Charges, Environmental Monitoring, etc.) = 0.5%
Furniture Costs = 1%
Owner Contingency = 4.5%
Total: 17%

*** Construction Costs are based on the following breakdown:


Cost of Construction: $250 /SF
+
General Conditions: 8%
Insurance: 2%
Overhead & Profit: 12%
Total: 22%
+
Contingency: 5%

Total Construction Cost: $320 /SF

**** Temporary Classroom relocation assumed cost:


$15,000 /Classroom

NORWALK PUBLIC SCHOOLS


CRANBURY

SILVERMINE

WOLFPIT

TRACEY

KENDALL

FOX RUN

NARAMAKE

JEFFERSON

BROOKSIDE

MARVIN

COLUMBUS

ROWAYTON

PARTNERS FOR
48 UNION STREET STAMFORD, CT 06906
P. 203.708.0047 F. 203.348.4165 WWW.PFARCH.NET
P
ARCHITECTURE F A MAP OF NORWALK, CT NORWALK PUBLIC SCHOOLS
NORWALK SCHOOL DISTRICT

ELEMENTARY ENROLLMENT
PROJECTIONS
March 4, 2010 Elementary Enrollments

FINAL REPORT

Prepared by:
Applied Data Services
19 Park Place
Flanders, NJ 07836
(973) 584-5578

May 12, 2010


Updated June 8, 2010
TABLE OF CONTENTS

Introduction ……………………………………………………………………………...2
Districtwide Enrollment Projections By Grade & Year............................................3
Summary of Enrollment Projections By School & Year..........................................4
Districtwide Enrollment History By Grade & Year ..................................................5
Districtwide Enrollment History By School & Year ………………..….....................6

ENROLLMENT PROJECTIONS BY BUILDING BY GRADE .......................................... 7


Individual School Enrollment Projections......................................................................... 8

Feeder Structure ………………………………………………………………………………20

Revised 6/8/10
Introduction

The following projected enrollments were performed using the March 4, 2010
enrollments for the elementary schools. A three year enrollment history was used to
calculate the survival ratios for each grade pair.

The projected enrollments for the Columbus Magnet school was adjusted each year to
ensure a total enrollment of approximately 345 with a maximum of 2 Kindergarten
classes. These projected enrollments (years 2010/11 through 2014/15) were adjusted
by drawing students from each of the elementary schools, as described in the table
below.

Year District Draw (Lottery)


10-11 Columbus receives 1 student via the lottery from each elementary school,
increasing its enrollment by 11.
11-12 Columbus receives 2 students via the lottery from each elementary school,
increasing its enrollment by 22.
12-13 Columbus receives 3 students via the lottery from each elementary school,
increasing its enrollment by 33.
13-14 Columbus receives 3 students via the lottery from each elementary school,
increasing its enrollment by 33.
14-15 Columbus receives 3 students via the lottery from each elementary school,
increasing its enrollment by 33.

Note that the Tracey elementary school projected enrollments by grade indicated a
decline in the Kindergarten enrollment in 2010-11. There after it remains ‘flat’ at an
average of 65 students for each year though 2014/15. This is a result of the
methodology used to distribute kindergarten students to each elementary school.

The calculation of the percentage of Kindergarten students assigned to an elementary


school is based on averaging the grades 1 through 3 for each school. Note that the
third grade enrollment for 2009-11 was 45 lowering the average of the three grades.
This low enrollment for the third grade was verified against the April 5, 2010
enrollments, which indicated 46 students in grade 3.

Based on the kindergarten enrollment history for Tracey, an upward adjustment


should be made to the projected kindergarten enrollments, which will increase
the projected enrollment, for Tracey through 2015.

Prepared by Applied Data Services 6/08/10 -2-


NORWALK PUBLIC SCHOOLS
DISTRICTWIDE ENROLLMENT PROJECTION
BY GRADE AND YEAR (3 YEAR SURVIVAL RATIO)
Based on March 2010 Enrollments

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


PreK 191 186 185 179 183 182
KINDERGARTEN 959 927 920 889 912 907
FIRST 889 940 910 903 876 895
SECOND 844 865 916 887 880 855
THIRD 782 825 846 895 867 860
FOURTH 788 782 825 846 895 867
FIFTH 786 776 770 813 834 882
SUB TOTAL K-5 5048 5115 5187 5233 5264 5266
TOTAL PreK-5 5239 5301 5372 5412 5447 5448
Notes: Special Education students are included in above figures.
Pre-K projections were calculated using the year to year Kindergarten
percentage of Increase or decrease.

Prepared by Applied Data Services 05/12/10 -3-


NORWALK PUBLIC SCHOOLS
SUMMARY OF ENROLLMENT PROJECTION
BY SCHOOL AND YEAR (3 YEAR SURVIVAL RATIO)
(ENROLLMENT ADJUSTED FOR COLUMBUS –BASED ON MARCH 2010)

YEAR
SCHOOL

09-10 10-11 11-12 12-13 13-14 14-15


PreK 191 186 185 179 183 182
BROOKSIDE ELEM 438 437 450 454 451 458
COLUMBUS ELEM 343 345 341 343 343 343
CRANBURY ELEM 447 459 450 459 458 463
FOX RUN ELEM 449 453 471 471 485 488
JEFFERSON ELEM 538 558 574 587 585 582
KENDALL ELEM 489 479 486 479 478 487
MARVIN ELEM 446 462 470 471 470 466
NARAMAKE ELEM 404 415 420 424 431 435
ROWAYTON ELEM 469 482 488 498 501 488
SILVERMINE ELEM 341 337 341 345 346 339
TRACY ELEM 380 373 374 387 382 384
WOLFPIT ELEM 304 315 322 315 334 333
SUB TOTAL K-5 5048 5115 5187 5233 5264 5266
TOTAL PreK - 5 5239 5301 5372 5412 5447 5448
Notes: Special Education Students are included in above figures.
Columbus enrollments have been adjusted by reassigning students from each
elementary school for the projected years to achieve an approximate enrollment
of 345 students.
Pre-K projections were calculated using the year to year Kindergarten percentage of
increase/decrease.

Prepared by Applied Data Services 05/12/10 -4-


NORWALK PUBLIC SCHOOLS
SUMMARY OF ENROLLMENT HISTORIES
BY SCHOOL BY YEAR (MARCH 2010)

YEAR
SCHOOL

04-05 05-06 06-07 07-08 08-09 09-10


PreK 135 126 146 158 155 191
BROOKSIDE ELEM 411 421 411 386 414 438
COLUMBUS ELEM 363 356 351 356 340 343
CRANBURY ELEM 486 474 443 439 444 447
FOX RUN ELEM 471 431 434 431 442 449
JEFFERSON ELEM 420 412 444 494 518 538
KENDALL ELEM 530 489 475 468 455 489
MARVIN ELEM 510 479 461 456 434 446
NARAMAKE ELEM 398 357 357 357 366 404
ROWAYTON ELEM 382 396 385 424 444 469
SILVERMINE ELEM 462 439 419 371 352 341
TRACY ELEM 467 409 399 403 423 380
WOLFPIT ELEM 350 306 307 284 290 304
SUB TOTAL K-5 5250 4969 4886 4869 4922 5048
TOTAL PreK-5 5385 5095 5032 5027 5077 5239
Notes: Special Education Students are included in above figures.

Prepared by Applied Data Services 05/12/10 -5-


NORWALK PUBLIC SCHOOLS
DISTRICTWIDE ENROLLMENT HISTORY
BY GRADE AND YEAR (MARCH 2010)

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


PreK 135 126 146 158 155 191
KINDERGARTEN 898 856 852 866 902 959
FIRST 896 848 825 819 864 889
SECOND 902 822 807 798 802 844
THIRD 871 847 788 784 788 782
FOURTH 846 802 839 776 800 788
FIFTH 837 794 775 826 766 786
SUB TOTAL K-5 5250 4969 4886 4869 4922 5048
TOTAL PreK-5 5385 5095 5032 5027 5077 5239
Note: Special Education students are included in above figures.

Prepared by Applied Data Services 05/12/10 -6-


ENROLLMENT PROJECTIONS
AND HISTORIES

BY BUILDING BY GRADE

Based on March 2010 Enrollments

Prepared by Applied Data Services 05/12/10 -7-


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

BROOKSIDE ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 84 81 80 78 80 79
FIRST 71 81 79 78 76 78
SECOND 80 69 79 77 76 74
THIRD 68 78 67 77 75 74
FOURTH 61 68 78 67 78 76
FIFTH 74 60 67 77 66 77
TOTAL 438 437 450 454 451 458

BROOKSIDE ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 68 83 72 66 74 84
FIRST 68 70 76 64 63 71
SECOND 62 65 69 73 72 80
THIRD 72 55 63 65 70 68
FOURTH 77 72 61 60 75 61
FIFTH 64 76 70 58 60 74
TOTAL 411 421 411 386 414 438

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 -8-


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments
COLUMBUS ELEMENTARY
ADJUSTED

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 43 44 42 40 42 40
FIRST 55 57 60 61 60 61
SECOND 54 56 59 61 60 59
THIRD 61 55 57 62 61 60
FOURTH 68 63 58 60 51 61
FIFTH 62 70 65 59 59 62
TOTAL 343 345 341 343 343 343
Note: Special Education Students are included in above figures.
COLUMBUS ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 44 42 45 43 40 43
FIRST 65 64 55 59 56 55
SECOND 66 64 65 63 56 54
THIRD 67 62 64 63 65 61
FOURTH 61 62 62 66 62 68
FIFTH 60 62 60 62 61 62
TOTAL 363 356 351 356 340 343

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 -9-


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

CRANBURY ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 89 81 80 78 80 79
FIRST 73 86 79 78 76 78
SECOND 78 71 84 77 76 74
THIRD 63 76 69 82 75 74
FOURTH 83 63 76 69 83 76
FIFTH 61 82 62 75 68 82
TOTAL 447 459 450 459 458 463

CRANBURY ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 90 107 79 87 77 89
FIRST 80 72 94 71 82 73
SECOND 78 64 66 85 69 78
THIRD 79 73 61 65 87 63
FOURTH 84 78 67 63 67 83
FIFTH 75 80 76 68 62 61
TOTAL 486 474 443 439 444 447

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 10 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

FOX RUN ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 100 85 84 81 83 83
FIRST 78 97 82 81 79 80
SECOND 65 76 94 80 79 77
THIRD 74 64 74 92 78 77
FOURTH 58 74 64 74 93 79
FIFTH 74 57 73 63 73 92
TOTAL 449 453 471 471 485 488
Note: Special Education Students are included in above figures.

FOX RUN ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 88 65 90 83 90 100
FIRST 80 79 65 81 77 78
SECOND 88 69 75 54 84 65
THIRD 73 82 60 71 57 74
FOURTH 70 68 77 62 73 58
FIFTH 72 68 67 80 61 74
TOTAL 471 431 434 431 442 449

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 11 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments
JEFFERSON ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 108 103 102 99 101 101
FIRST 102 105 100 98 96 98
SECOND 100 99 102 96 96 94
THIRD 76 98 97 100 95 94
FOURTH 78 76 98 97 101 96
FIFTH 74 77 75 97 96 99
TOTAL 538 558 574 587 585 582

JEFFERSON ELEMENTARY – HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 75 69 82 104 108 108
FIRST 77 70 70 85 99 102
SECOND 81 75 73 72 79 100
THIRD 68 79 72 74 75 76
FOURTH 60 61 81 78 80 78
FIFTH 59 58 66 81 77 74
TOTAL 420 412 444 494 518 538

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 12 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

KENDALL ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 88 87 87 84 86 85
FIRST 72 85 84 84 81 82
SECOND 83 70 83 82 82 78
THIRD 84 81 68 81 80 80
FOURTH 73 84 81 68 82 81
FIFTH 89 72 83 80 67 81
TOTAL 489 479 486 479 478 487
Note: Special Education Students are included in above figures.

KENDALL ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 88 72 78 77 72 88
FIRST 97 84 73 78 78 72
SECOND 89 81 85 70 72 83
THIRD 89 89 77 85 71 84
FOURTH 85 82 82 79 81 73
FIFTH 82 81 80 79 81 89
TOTAL 530 489 475 468 455 489

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 13 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

MARVIN ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 77 84 84 81 83 83
FIRST 85 75 81 81 79 80
SECOND 81 83 73 79 79 77
THIRD 73 79 81 71 77 77
FOURTH 69 73 79 81 72 78
FIFTH 61 68 72 78 80 71
TOTAL 446 462 470 471 470 466

MARVIN ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 87 84 80 89 78 77
FIRST 84 80 78 76 89 85
SECOND 92 79 70 70 70 81
THIRD 86 94 72 60 64 73
FOURTH 86 72 90 73 62 69
FIFTH 75 70 71 88 71 61
TOTAL 510 479 461 456 434 446

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 14 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments

NARAMAKE ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 89 75 75 72 74 74
FIRST 68 86 73 73 70 72
SECOND 63 66 84 71 71 68
THIRD 62 62 65 82 69 69
FOURTH 65 62 62 65 83 70
FIFTH 57 64 61 61 64 82
TOTAL 404 415 420 424 431 435
Note: Special Education Students are included in above figures.

NARAMAKE ELEMENTARY – HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 62 70 67 62 71 89
FIRST 67 62 60 57 62 68
SECOND 70 58 55 59 58 63
THIRD 69 56 58 59 61 62
FOURTH 62 58 62 58 55 65
FIFTH 68 53 55 62 59 57
TOTAL 398 357 357 357 366 404

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 15 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments
ROWAYTON ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 85 88 87 84 86 86
FIRST 98 82 85 84 81 83
SECOND 79 95 80 83 82 79
THIRD 67 77 93 78 81 80
FOURTH 74 67 77 93 79 82
FIFTH 66 73 66 76 92 78
TOTAL 469 482 488 498 501 488

ROWAYTON ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 64 80 73 88 91 85
FIRST 57 61 70 75 87 98
SECOND 76 66 63 80 69 79
THIRD 66 75 59 64 80 67
FOURTH 58 59 72 55 64 74
FIFTH 61 55 48 62 53 66
TOTAL 382 396 385 424 444 469

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 16 -


NORWALK PUBLIC SCHOOLS
INDIVIDUAL SCHOOL PROJECTIONS
BY SCHOOL AND YEAR
Based on March 2010 Enrollments
SILVERMINE ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 56 61 61 59 60 60
FIRST 67 54 59 59 57 58
SECOND 56 65 53 57 57 56
THIRD 50 55 64 52 56 56
FOURTH 53 50 55 64 53 57
FIFTH 59 52 49 54 63 52
TOTAL 341 337 341 345 346 339
Note: Special Education Students are included in above figures.
Silvermine has been adjusted for the Columbus enrollments. See page 6.

SILVERMINE ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 79 58 65 56 59 56
FIRST 81 75 63 62 56 67
SECOND 65 79 72 56 58 56
THIRD 80 62 73 67 51 50
FOURTH 77 86 66 64 68 53
FIFTH 80 79 80 66 60 59
TOTAL 462 439 419 371 352 341

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 17 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments
TRACEY ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 75 67 67 64 66 66
FIRST 63 73 65 65 62 64
SECOND 69 61 71 63 63 60
THIRD 45 67 60 69 62 62
FOURTH 61 45 67 60 70 63
FIFTH 67 60 44 66 59 69
TOTAL 380 373 374 387 382 384

TRACEY ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 93 67 64 68 76 75
FIRST 75 78 69 58 78 63
SECOND 75 63 64 69 59 69
THIRD 73 68 70 68 70 45
FOURTH 71 63 73 66 69 61
FIFTH 80 70 59 74 71 67
TOTAL 467 409 399 403 423 380

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 18 -


NORWALK PUBLIC SCHOOLS

INDIVIDUAL SCHOOL PROJECTIONS


BY SCHOOL AND YEAR
Based on March 2010 Enrollments
WOLFPIT ELEMENTARY

YEAR
GRADE

09-10 10-11 11-12 12-13 13-14 14-15


KINDER 65 58 57 56 57 57
FIRST 57 63 56 55 54 55
SECOND 36 56 61 55 54 53
THIRD 59 35 55 60 54 53
FOURTH 45 59 35 55 61 55
FIFTH 42 44 58 34 54 60
TOTAL 304 315 322 315 334 333
Note: Special Education Students are included in above figures.

WOLFPIT ELEMENTARY - HISTORIES

YEAR
GRADE

04-05 05-06 06-07 07-08 08-09 09-10


KINDER 60 59 57 43 66 65
FIRST 65 53 52 53 37 57
SECOND 60 59 50 47 56 36
THIRD 49 52 59 43 37 59
FOURTH 55 41 46 52 44 45
FIFTH 61 42 43 46 50 42
TOTAL 350 306 307 284 290 304

Revised 6/8/10

Prepared by Applied Data Services 05/12/10 - 19 -


NORWALK PUBLIC SCHOOLS
FEEDER STRUCTURE

Schools Grade Feeds Percentage

BROOKSIDE K-5 ROTON 100.0% of its grade 5 enrollment

COLUMBUS K-5 NATHAN HALE 28.0% of its grade 5 enrollment


K-5 WEST ROCKS 28.0% of its grade 5 enrollment
K-5 PONUS RIDGE 28.0% of its grade 5 enrollment
K-5 ROTON 16.0% of its grade 5 enrollment

CRANBURY K-5 WEST ROCKS 100.0% of its grade 5 enrollment

FOX RUN K-5 PONUS RIDGE 100.0% of its grade 5 enrollment

JEFFERSON K-5 PONUS RIDGE 100.0% of its grade 5 enrollment

KENDALL K-5 PONUS RIDGE 100.0% of its grade 5 enrollment

MARVIN K-5 NATHAN HALE 100.0% of its grade 5 enrollment

NARAMAKE K-5 NATHAN HALE 100.0% of its grade 5 enrollment

ROWAYTON K-5 ROTON 100.0% of its grade 5 enrollment

SILVERMINE K-5 WEST ROCKS 100.0% of its grade 5 enrollment

TRACEY K-5 WEST ROCKS 100.0% of its grade 5 enrollment

WOLFPIT K-5 NATHAN HALE 100.0% of its grade 5 enrollment

NATHAN HALE 6-8 NORWALK 100.0% of its grade 8 enrollment

PONUS RIDGE 6-8 MCMAHON 100.0% of its grade 8 enrollment

ROTON 6-8 MCMAHON 100.0% of its grade 8 enrollment

WEST ROCKS 6-8 NORWALK 100.0% of its grade 8 enrollment

MCMAHON 9-12 -- --

NORWALK 9-12 -- --

Prepared by Applied Data Services 05/12/10 - 20 -