NEW PAULINE GUILMETTE BUILDING

Form No. : SPC/PMT/001/00

SUBMITTAL TRANSMITTAL SHEET # STR/OT-22

Proposed 15-Storey Pauline Guilmette Project No. : SPC-001


Project Name
School Building Date 4/12/2019
Submittal No. : Revision : 000
Submittal Title : PLUMBING: LEAK TEST FORM
We are sending herewith under separate cover drawings / documents / samples listed below :
DWGS.
ITEM NO. SPECS BOQ DESCRIPTION TYPE COPIES REMARKS
REF.

1 Leak Test Form (For Sanitary Lines) OT 1

2 Hydrostatic Leak Test Form (For Waterline and Fire Protection) OT 1

Type : SD= Shop Drawings, SM=Sample, GT= Guarantee, MD= Manufacturer's Data, CT=Certificates, TT= Test Results, OT= Others
Supplier / Manufacturer :
We certify that the documents / materilas sumitted herewith have been reviewed in detail and are in strict conformance with the contract drawing and
specifications except as otherwise stated.

Contractor (Name) : Signature : Received by :

ENGR. JEREX ROY D. HUBAHIB


Date : 12/04/2019 Date :
Resident Engineer Review Comments
Consultant Decision
'A' Approved
'B' Approved As Noted
'C' Not Approved
'D' Not Required
Resident Engineer's (Name) : Received by Contractor :
ENGR. RAMIL IAN C. LLANOS

Signature : Signature :
Date : Date :
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of The Contract. This check is only
for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is
responsible for confirming and correlating all quantities and dimensions, selecting fabrication process and techniques of construction, coordinating his work with that of other
trades and performing his work in a safe and satisfactory manner.

Copy to :
Employer Consultant QS Other Street
Head No._____ of
______
Office