LEGEND OF SHIMIZU'S EXISTING PROJECTS:

① LRT (Baclaran + Zapote) Shimizu Philippines Proje


② EPPI - EPSON
Actual Productivity Rate Mon
③ PERSTIMA

④ TSR - THE SEASON'S RESIDENCE

⑤ GMV: a. CBMB - CANNON & b. TERUMO - EB4

Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

I. Site Works As per my files Actual (mean)

Excavation Works

• Manual Excavation cu.m / MD 1.82

• Mechanical Excavation cu.m / MD 70.00 60.00

Backfilling (Compacted) cu.m / MD

Soil Poisoning (2 Application) sq.m / MD

External Paving sq.m / MD

Pre- Cast Concrete Kerb l.m / MD

II. Civil Structural Works


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Piling Works Piles / Day

Rebar Fabrication kg. / MD

Rebar Installation kg. / MD

Formwoks Installation sq.m / MD

Formworks Stripping sq.m / MD

Hollow Core Installation sq.m / MD

Speed Deck sq.m / MD

Concreting Works

• Lean Concrete cu.m / MD

• Foundation cu.m / MD

• Water Tank cu.m / MD

• Column cu.m / MD

• Slab & Stair cu.m / MD

Duct Tube Fabrication for PC pcs. /MH


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

PC Column Installation pcs. / MD

PC Beam / Girder Installation pcs. / MD

Steel Structure pcs. / MD

Secondary Ceiling Works kg. / MD

Roofing Works

• Wire Mesh sq.m / MD

• Roof Conncetor PCS. / MD

• Aluminum Foil / Fiber Glass sq.m / MD

• Roof Installation sq.m / MD

Metal Sidings

• Wire Mesh / Aluminum / Fiber Glass sq.m / MD

• Metal Sidings Installation sq.m / MD

Waterproofing

1st Layer sq.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

2nd Layer sq.m / MD

3rd Layer sq.m / MD

4th Layer sq.m / MD

III. Architectural Works

CHB Works sq.m / MD

Plastering Works sq.m / MD

Skim Coat sq.m / MD

Drywall Works (General) sq.m / MD

Painting Works (General) sq.m / MD

Ceiling Works (General) sq.m / MD

Floor Finishing (General) sq.m / MD

Steel Door Installation pcs. / MD

Sandwich Panel sq.m / MD

IV. Electro Mechanical Works


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Conduits / Cable Tray l.m / MD

A/C Duct Works l.m / MD

Piping Works l.m / MD

Cabling Works l.m / MD

Electrical Devices Installation no. / MD

Electrical Equipment Installation no. / MD

Machinery & Equipment Installation no. / MD

Building Works

Demolition (Manual)

Demolition sq.m / MD

Elevated Slabs cu.m / MD

Concrete Walls cu.m / MD

Remove Concrete Curbs l.m / MD

Cut Concrete Openings cu.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Demolition (Machine)

Demolition sq.m / MD

Elevated Slabs cu.m / MD

Concrete Walls cu.m / MD

Remove Concrete Curbs l.m / MD

Cut Concrete Openings cu.m / MD

Site Development

Clearing and Grabbing Manual

Clearing Undergrowth & Tree 12" diameter sq.m / MD

Clearing Undergrowth & Shrubs sq.m / MD

Remove of Top Soil sq.m / MD

Clearing and Grabbing Machine

Clearing Undergrowth & Tree 12" diameter sq.m / MD

Clearing Undergrowth & Shrubs sq.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Site Works

Gravel Bedding cu.m / MD

Hauling & Dispossal of Excess Excavated cu.m / MD


Materials

Concrete Works (Manual)

Wall Footings cu.m / MD

Slab on Fill : 150 mm Thickness cu.m / MD

Girder and Beams cu.m / MD

Retaining Walls cu.m / MD

Concrete Works (Machine)

Wall Footings cu.m / MD

Retaining Walls cu.m / MD

Reinforcing Bars (Installation)

Wall Footings kg. / MD

Columns kg. / MD
Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Slab on Fill : 150 mm Thickness kg. / MD

Suspended Slab kg. / MD

Girder and Beams kg. / MD

Retaining Walls kg. / MD

Stiffener Columns kg. / MD

Stiffener Beams kg. / MD

RC Wall kg. / MD

Formworks

Wall Footings sq.m / MD

Columns sq.m / MD

Slab on Fill : 150 mm Thickness sq.m / MD

Suspended Slab sq.m / MD

Roof Slab sq.m / MD

Girder and Beams sq.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Retaining Walls sq.m / MD

Stairs and Landings sq.m / MD

Form Oil Application sq.m / MD

Scaffolding

1 to 2 Section Long -1 to 2 Section High sq.m / MD

1 to 2 Section Long - more than 2 Section sq.m / MD


High

3 to 5 Section Long - 1 to 2 Section High sq.m / MD

3 to 5 Section Long - more than 2 Section sq.m / MD


High

6 Section or more Long - 1 to 2 Section High sq.m / MD

6 Section or more Long - 2 more than sq.m / MD


Section High

Masonry Works

CHB 4" Laying sq.m / MD

CHB 6" Laying sq.m / MD

CHB 8" Laying sq.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Finishing oF CHB Joints pcs. / Day

Finishing of Floor, Rough sq.m / MD

Structural Steel Works

Anchor Bolt

Fabrication of Anchor Bolts kg. / MD

Installation of Anchor Bolts kg. / MD

Erection of Bolts

Erection Using Crane mtrc ton / MD

Erection using Gin Pole mtrc ton / MD

Paint on Structural Steel mtrc ton / MD

Roofing Works

Installation of Asbestos Roofing sht. / MD

Installation of G.I or Aluminum Roofing sht. / MD

Installation of Waterproofing Membrane sq.m / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

G.I Roofing GA. 26 sq.m / MD

Fabrication of Gutter sht. / MD

Gutter Cut and Shape l.m / MD

Gutter Installation l.m / MD

Downspout Cut and Shape l.m / MD

Downspout Installation l.m / MD

Fabricate & Install of Gutter, Downspout sht. / MD


and Ridgeroll

Doors and Windows

Windows

Steel Owning Windows sq.m / MD

Steel Casement Windows sq.m / MD

Aluminum Sliding Windows sq.m / MD

Jalousie Windows on Aluminum Frame sq.m / MD

Installation of Steel Windows pc. / Day


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Installation of Wooden Windows sq.m / MD

Installation of Wooden Jalousie sq.m / MD

Doors

Wooden Panel Door sq.m / MD

Wooden Flush Door sq.m / MD

Wooden Sliding Door sq.m / MD

Aluminum Slding Door sq.m / MD

Aluminum Door (Single Swing) sq.m / MD

Steel Sliding Door sq.m / MD

Hollow Metal (Single Swing) sq.m / MD

Installation of Door and Door's Jamb bdft / MD

Installation of Doors (Complete with Hinges pcs / day


and Knob)

Door Lockset set . / MD

Finishes
Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Floor Finishes

Epoxy Floor Paint sq.m / MD

Vinyl Tiles sq.m / MD

Ceramic Tiles sq.m / MD

Waterproofing sq.m / MD

Granite Tiles sq.m / MD

Trowel Finish (Bare) sq.m / MD

Floor Hardener sq.m / MD

Wall Finishes

Paint On CHB Wall sq.m / MD

Ceramic Tiles sq.m / MD

Gypsum Board sq.m / MD

Moisture Resistant Board sq.m / MD

Wall Papel unit / MD


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Ceiling Finish

Paint on Exposed Ceiling sq.m / MD

Gypsum Board sq.m / MD

Moisture Resistant Board sq.m / MD

Acoustic Board (Including Frame) sq.m / MD

Paint on Gypsum Ceiling sq.m / MD

Miscellaneous Finishes

Baseboard l.m / MD

Wooden Cornice (Moulding) l.m / MD

Stainless Hood

Wooden Hand Rails l.m / MD

Electrical Works

Installation, High Voltage mtrc ton. / MH

Instalaltion, Low Voltage mtrc ton. / MH


Actutal Productivity Output

February 2020 March 2020

① ② ③ ④ ⑤ ① ② ③ ④

Activity /Description Unit / Man-day (MD)

Installation Service Entrance Trap and mtrc ton. / MH


Conduit

Installation conduit and Fuse Panel mtrc ton. / MH

Install Heavy Rigid Conduit with Outlet


Boxes

1/2 " & 3/4" mtrc ton. / MH

1" & 1 1/4" mtrc ton. / MH

1 1/2" mtrc ton. / MH

2" mtrc ton. / MH

2 1/2" mtrc ton. / MH

3" mtrc ton. / MH

4" mtrc ton. / MH


rojects
Monitoring

tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
tput

April 2020

⑤ ① ② ③ ④ ⑤
LEGEND OF SHIMIZU'S EXISTING PROJECTS:
① LRT (Baclaran + Zapote)
② EPPI - EPSON
③ PERSTIMA
④ TSR - THE SEASON'S RESIDENCE
⑤ GMV: a. CBMB - CANNON & b. TERUMO - EB4

PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④

DIVISI SITE WORKS

2.1 EARTHWORKS
2.1.1 Clearing & Grubbing M2 1,000 0.024
0.024 1.00 Dozer
0.012 1.00 Equipment Operator
0.012 1.00 Common Labor/Helper

2.1.2 Excavation - Bulk M3 160 0.100


0.100 1.00 Large Excavator
0.100 1.00 Equipment Operator

2.1.3 Excavation - Isolated Footings M3 25 0.960


0.960 1.00 Medium Excavator
0.480 1.00 Equipment Operator
0.480 1.00 Common Labor/Helper

2.1.4 Backfill & Compaction - Bulk M3 200 0.280


0.093 1.00 Dozer
0.093 1.00 Roller Compactor
0.093 1.00 Water Tanker

Page 31 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
0.210 3.00 Equipment Operator
0.070 1.00 Common Labor/Helper

2.1.5 Backfill & Compaction M3 25 1.600


0.800 1.00 Backhoe Loader
0.800 1.00 Plate Compactor
1.067 2.00 Equipment Operator
0.533 1.00 Common Labor/Helper

2.2 SOIL TREATMENT


2.2.1 Anti-Termite Treatment M2 200 0.040
0.040 1.00 TT Applicator

2.3 PAVING & SURFACING

2.3.1 Concrete Paving - 100mm thick M2 13 3.077


0.615 1.00 Concrete Mason
0.615 1.00 Steel Fixer
0.615 1.00 Shuttering Carpenter
0.615 1.00 Scaffolder
0.615 1.00 Common Labor/Helper

2.3.2 Concrete Paving - 150mm thick M2 10 4.000


0.800 1.00 Concrete Mason
0.800 1.00 Steel Fixer
0.800 1.00 Shuttering Carpenter
0.800 1.00 Scaffolder
0.800 1.00 Common Labor/Helper

2.3.3 Pedestrian/Handicap ramp M2 8 5.250


1.050 1.00 Concrete Mason
1.050 1.00 Steel Fixer
1.050 1.00 Shuttering Carpenter
1.050 1.00 Scaffolder

Page 32 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
1.050 1.00 Common Labor/Helper

Precast concrete paving (Gray & red


2.3.4 colour) M2 30 1.067
0.533 2.00 Tile Mason
0.533 2.00 Common Labor/Helper

Interlocking concrete pavers


2.3.5 (400X400mm) M2 30 1.067
0.533 2.00 Tile Mason
0.533 2.00 Common Labor/Helper

Interlocking concrete pavers


2.3.6 (200X200X80mm) M2 30 1.067
0.533 2.00 Tile Mason
0.533 2.00 Common Labor/Helper

Interlocking concrete pavers, 60mm


2.3.7 thick M2 30 1.067
0.533 2.00 Tile Mason
0.533 2.00 Common Labor/Helper

2.4 ROCK FORMATION & BOULDERS

BOULDER SCHEDULE
2.4.1 1M3 =15% M3 500 0.080
0.020 1.00 Dump Truck
0.020 1.00 Loader
0.020 1.00 Backhoe
0.020 1.00 Equipment Operator
0.080 1.00 Common Labor/Helper

2.4.2 0.25 M3 = 40% M3 500 0.080


0.020 1.00 Dump Truck

Page 33 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
0.020 1.00 Loader
0.020 1.00 Backhoe
0.020 1.00 Equipment Operator
0.080 1.00 Common Labor/Helper

2.5.3 < 0.25M3 = 45% M3 500 0.080


0.020 1.00 Dump Truck
0.020 1.00 Loader
0.020 1.00 Backhoe
0.020 1.00 Equipment Operator
0.080 1.00 Common Labor/Helper

2.5 ROAD CURB

2.5.1 Precast concrete curb LM 70 0.229


0.114 1.00 Tile Mason
0.114 1.00 Common Labor/Helper

2.6 MOWING EDGE

2.6.1 Concrete Mowing Edge ( Type 1/2) LM 70 0.229


0.114 1.00 Tile Mason
0.114 1.00 Common Labor/Helper

PRECAST CONCRETE WHEEL


2.7 STOPPERS

2.7.1 Precast Concrete Wheel Stoppers No. 64 0.500


0.250 1.00 Backhoe/Loader
0.250 1.00 Equipment Operator
0.125 1.00 Tile Mason
0.125 1.00 Common Labor/Helper

Page 34 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
2.8 PLAYING COURT

Playing court with required finishing


2.8.1 layers and colors M2 1 24.000
24.000 1.00 Shuttering Carpenter
8.000 1.00 Concrete Mason
8.000 1.00 Common Labor/Helper

2.9 STEEL CHAIN LINK FENCES

Galvanized steel fence 3000 mm


2.9.1 height LM 61 0.393
0.000 1.00 Steel Structure Crew
0.131 1.00 Welder/Fabricator
0.131 1.00 Common Labor/Helper

2.10 PRECAST CONCRETE BOLLARD

Precast concrete bollard 400 mm


2.10.1 Dia. And 1000 mm hieght No. 20 1.200
0.000 1.00 Shuttering Carpenter
0.400 1.00 Concrete Mason
0.400 1.00 Common Labor/Helper

2.11 SUNDRIES

2.11.1 Trash Bin No. 70 0.114


0.114 1.00 Common Labor/Helper

2.12 CONCRETE SEAT

Concrete seat with 100 X 100mm


2.12.1 ceramic tile band No. 4 6.000

Page 35 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
2.000 1.00 Shuttering Carpenter
2.000 1.00 Concrete Mason
2.000 1.00 Common Labor/Helper

2.13 GRAVEL

2.13.1 Gravel 50mm thickness M2 30 0.800


#DIV/0! 1.00 Bobcat
0.267 1.00 Welder/Fabricator
0.267 1.00 Common Labor/Helper

2.14 CONCRETE TREE - PALM TREE

2.14.1 Concrete Tree - Palm pit No. 17 1.412


1.412 1.00 Bobcat
0.471 1.00 Shuttering Carpenter
0.471 1.00 Common Labor/Helper

2.15 PRECAST CONCRETE - KOISK

2.15.1 Precast concrete koisk No. 4 4.000


2.000 1.00 Skilled Worker
2.000 1.00 Common Labor/Helper

DIVISI CONCRETE WORKS

3.1 CONCRETE (CAST IN PLACE)

Concrete Placing
Blinding m3 2.000
Isolated Footings m3 2.250
Raft Footings m3 2.100
Columns m3 2.500
Shear Walls m3 3.500

Page 36 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
Core Walls m3 3.500
Grade Beams m3 2.500
Slab on Grade m3 3.300
Isolated Beams m3 3.250
Suspended Slabs m3 3.300
Stairs m3 5.000
Parapet Walls / Upstands m3 4.000
Screed m3 6.000

Rebar
Blinding T 0.000
Isolated Footings T 35.000
Raft Footings T 35.000
Columns T 35.000
Shear Walls T 50.000
Core Walls T 50.000
Grade Beams T 30.000
Slab on Grade T 35.000
Isolated Beams T 40.000
Suspended Slabs T 40.000
Stairs T 50.000
Parapet Walls / Upstands T 40.000
Screed T 15.000

Formwork (Make, erect, strip, clean,


and move)
Blinding m2 0.150
Isolated Footings m2 2.000
Raft Footings m2 1.250
Columns m2 3.500
Shear Walls m2 4.000
Core Walls m2 4.000
Grade Beams m2 2.100
Slab on Grade m2 1.000

Page 37 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
Isolated Beams m2 5.000
Suspended Slabs m2 3.500
Stairs m2 4.850
Parapet Walls / Upstands m2 4.000

Total Average Production m3 25.000

3.1.1 Blinding m3 2.286


1.340 1.00 Concrete Mason
0.000 1.00 Steel Fixer
0.215 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
0.732 1.00 Common Labor/Helper

3.1.2 Isolated Footings m3 7.492


1.508 1.00 Concrete Mason
3.465 1.00 Steel Fixer
1.333 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
1.187 1.00 Common Labor/Helper

3.1.3 Raft Footings m3 7.069


1.407 1.00 Concrete Mason
4.725 1.00 Steel Fixer
0.183 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
0.754 1.00 Common Labor/Helper

3.1.4 Columns m3 28.750


1.675 1.00 Concrete Mason
8.750 1.00 Steel Fixer
11.156 1.00 Shuttering Carpenter
1.969 1.00 Scaffolder

Page 38 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
5.200 1.00 Common Labor/Helper

3.1.5 Shear Walls m3 24.360


2.345 1.00 Concrete Mason
8.350 1.00 Steel Fixer
7.975 1.00 Shuttering Carpenter
1.407 1.00 Scaffolder
4.282 1.00 Common Labor/Helper

3.1.6 Core Walls m3 25.640


2.345 1.00 Concrete Mason
8.350 1.00 Steel Fixer
8.791 1.00 Shuttering Carpenter
1.551 1.00 Scaffolder
4.603 1.00 Common Labor/Helper

3.1.7 Grade Beams m3 18.610


1.675 1.00 Concrete Mason
5.610 1.00 Steel Fixer
7.875 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
3.450 1.00 Common Labor/Helper

3.1.8 Slab on Grade m3 7.169


2.211 1.00 Concrete Mason
3.861 1.00 Steel Fixer
0.006 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
1.091 1.00 Common Labor/Helper

3.1.8 Isolated Beams m3 28.859


2.178 1.00 Concrete Mason
6.680 1.00 Steel Fixer
9.228 1.00 Shuttering Carpenter

Page 39 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
4.969 1.00 Scaffolder
5.805 1.00 Common Labor/Helper

3.1.9 Suspended Slabs m3 21.883


2.211 1.00 Concrete Mason
4.000 1.00 Steel Fixer
7.109 1.00 Shuttering Carpenter
3.828 1.00 Scaffolder
4.735 1.00 Common Labor/Helper

3.1.10 Stairs m3 38.018


3.350 1.00 Concrete Mason
11.500 1.00 Steel Fixer
16.139 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
7.030 1.00 Common Labor/Helper

3.1.11 Parapet Walls / Upstands m3 23.190


2.680 1.00 Concrete Mason
6.680 1.00 Steel Fixer
7.975 1.00 Shuttering Carpenter
1.407 1.00 Scaffolder
4.447 1.00 Common Labor/Helper

3.1.12 Screed m3 7.800


4.020 1.00 Concrete Mason
1.800 1.00 Steel Fixer
0.000 1.00 Shuttering Carpenter
0.000 1.00 Scaffolder
1.980 1.00 Common Labor/Helper

3.2 CONCRETE (PRECAST)

3.2.1 Hollow Core Slabs m2 336 0.167 0.024

Page 40 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
0.048 2.00 Concrete Mason
0.027 4.00 Common Labor/Helper
0.004 1.00 Equipment Operator
0.024 1.00 Mobile Crane

3.2.2 Double Tee Slabs m2 630 0.127 0.013


0.038 3.00 Concrete Mason
0.023 6.00 Common Labor/Helper
0.002 1.00 Equipment Operator
0.013 1.00 Mobile Crane

3.2.3 Precast Column no 18 4.000 0.444


0.889 2.00 Concrete Mason
0.593 6.00 Common Labor/Helper
0.066 1.00 Equipment Operator
0.444 1.00 Mobile Crane

3.2.4 Precast Beam no 20 3.600 0.400


0.800 2.00 Concrete Mason
0.533 6.00 Common Labor/Helper
0.059 1.00 Equipment Operator
0.400 1.00 Mobile Crane

Precast Concrete Cladding


3.2.5 (Architectural) m2 80 0.900 0.100
0.800 8.00 Façade Crew
0.089 1.00 Equipment Operator
0.100 1.00 Mobile Crane

4.1 MORTAR & MASONRY

4.1.1 10 cm Block m2 90 1.778


0.889 10.00 Block Mason
0.889 10.00 Common Labor/Helper

Page 41 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④

4.1.2 15cm Block m2 85 1.882


0.941 10.00 Block Mason
0.941 10.00 Common Labor/Helper

4.1.3 20cm Block m2 75 2.133


1.067 10.00 Block Mason
1.067 10.00 Common Labor/Helper

4.1.4 Solid Blocks m2 70 2.286


1.143 10.00 Block Mason
1.143 10.00 Common Labor/Helper

4.1.5 Cavity Wall with Insulation m2 42 3.810


1.905 10.00 Block Mason
1.905 10.00 Common Labor/Helper

DIVISI METALS

5.1 METALS

5.1.1 Railing (Aluminium/Steel) LM 36 1.111


0.000 5.00 Steel Structure Crew

5.1.2 Space Frame m2 27 1.778


1.778 6.00 Steel Structure Crew

Expansion Joint Cover (aluminium,


5.1.3 bronze or steel) LM 9.0 1.778
1.778 2.00 Common Labor/Helper

5.1.4 Steel Ladders, Bolted to Concrete LM 13.0 2.462


2.462 4.00 Common Labor/Helper

Page 42 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
DIVISI Thermal & Moisture Protection

7.1 DAMPROOFING

Bitominous Coating Below Grade, 1


7.1.1 coat m2 41 0.195
0.195 1.00 Common Labor/Helper

Bituminous Coating Below Grade, 2


7.1.2 coat m2 31 0.258
0.258 1.00 Common Labor/Helper

7.2 WATERPROOFING ON SLAB

Membrane waterproofing on slab,


7.2.1 felt paper m2 172 0.279
0.279 6.00 Waterproofing Crew

Membrane waterproofing on slab,


7.2.2 glass fiber fabric m2 107 0.449
0.449 6.00 Waterproofing Crew

7.3 WATERPROOFING ON ROOF DECK

Built-Up Roofing, Asphalt coating


7.3.1 with Gravel m2 50 0.640
0.640 4.00 Waterproofing Crew

Roof deck insulation,Extruded


7.3.1 Polystyrene m2 111 0.072
0.072 1.00 Waterproofing Crew

DIVISI DOORS & WINDOWS

Page 43 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
8.1 DOORS

8.1.1 Wooden Doors Frame EA 6 4.000


4.000 3.00 Joinery Crew

8.1.2 Steel Doors Frame EA 6 4.000


4.000 3.00 Joinery Crew

8.1.3 Wooden Door Leaf & Hardware Set EA 3 5.333


5.333 2.00 Joinery Crew

8.1.3 Metal Door Leaf & Hardware Set EA 3 5.333


5.333 2.00 Joinery Crew

8.2 WINDOWS

8.2.1 Aluminium Windows with Glazing EA 9 2.667


2.667 3.00 Joinery Crew

8.3 GLAZING WORKS

8.3.1 Glazed Partition Wall m2 16 2.000


2.000 4.00 Joinery Crew

8.3.2 Glazed Curtain Wall (Façade) m2 2 4.000


4.000 1.00 Façade Crew

DIVISI FINISHES

9.2 CEILING WORKS

Page 44 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
Suspended Gypsum Board
9.2.1 Monolithic System m2 13 2.462
(including suspension, boards, taping,
sanding) 1.231 2.00 Finishing Carpenter
1.231 2.00 Common Labor/Helper

Suspended Gypsum Board


9.2.2 Monolithic System - Curved m2 4 8.000
(including suspension, boards, taping,
sanding) 4.000 2.00 Finishing Carpenter
4.000 2.00 Common Labor/Helper

Suspended Demountable Metal


9.2.3 Ceiling System m2 20 1.600
0.800 2.00 Finishing Carpenter
0.800 2.00 Common Labor/Helper

Suspended Acoustic Fibre Board Tile


9.2.4 Ceiling System m2 20 1.600
0.800 2.00 Finishing Carpenter
0.800 2.00 Common Labor/Helper

9.2.5 Aluminum Strip Ceiling System m2 10 3.200


1.600 2.00 Finishing Carpenter
1.600 2.00 Common Labor/Helper

9.2.6 Ceiling Suspension System - ONLY m2 12 1.333


0.667 1.00 Finishing Carpenter
0.667 1.00 Common Labor/Helper

Ceiling Gypusm Board Installation -


9.2.7 ONLY m2 15 1.067

(including boards, taping, sanding) 0.533 1.00 Finishing Carpenter

Page 45 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
0.533 1.00 Common Labor/Helper

Ceiling Metal/Acoustic Installation -


9.2.8 ONLY m2 60 0.267
0.133 1.00 Finishing Carpenter
0.133 1.00 Common Labor/Helper

DIVISI MECHANICAL WORKS

15.3 HVAC

Duct, Galvanized Steel (Distribution


15.3.1 Line) LM 13 1.231
0.615 1.00 Ductman
0.615 1.00 Common Labor/Helper

15.3.2 Duct, Galvanized Steel (Main Line) LM 6 2.667


1.333 1.00 Ductman
1.333 1.00 Common Labor/Helper

15.3.3 Duct Insulation LM 13 1.231


0.615 1.00 Ductman
0.615 1.00 Common Labor/Helper

15.3.4 Diffusers EA 8 1.000


1.000 1.00 Ductman

15.3.5 Grilles & Registers EA 17 0.471


0.471 1.00 Ductman

15.3.6 Fan Cool Unit (FCU) EA 4 6.000


2.000 1.00 HVAC Technician
4.000 2.00 Common Labor/Helper

Page 46 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
15.3.7 Air Handling Unit (AHU) EA 0.50 64.000 16.000
16.000 1.00 Mobile Crane
16.000 1.00 Equipment Operator
16.000 1.00 HVAC Technician
32.000 2.00 Common Labor/Helper

15.3.8 Exhaust Fan EA 3 8.000


2.667 1.00 HVAC Technician
2.667 1.00 Electrician
2.667 1.00 Common Labor/Helper

15.3.9 VAV, CAV, Dampers EA 7 2.286


1.143 1.00 HVAC Technician
1.143 1.00 Common Labor/Helper

15.3.10Chilled Water Pipes LM 6 2.667


1.333 1.00 Pipe Fitter
1.333 1.00 Common Labor/Helper

Chilled Water Valves (Gate,


15.3.9 Isolation..etc) EA 3 5.333
2.667 1.00 Pipe Fitter
2.667 1.00 Common Labor/Helper

15.3.9 Chilled Water Pipes' Insulation EA 12 1.333


0.667 1.00 Pipe Fitter
0.667 1.00 Common Labor/Helper

15.3.9 Chillers Unit EA 0.33 145.455 24.242


24.242 1.00 Mobile Crane
24.242 1.00 Equipment Operator
48.485 2.00 HVAC Technician
72.727 3.00 Common Labor/Helper

Page 47 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
15.3.9 VAV, CAV, Dampers EA 7 2.286
1.143 1.00 HVAC Technician
1.143 1.00 Common Labor/Helper

15.3.9 A/C Split Unit EA 3 5.333


2.667 1.00 HVAC Technician
2.667 1.00 Common Labor/Helper

DIVISI ELECTRICAL WORKS

16.1 Cables & Accessories

16.1.1 Cable Trays LM 12 1.333


0.667 1.00 Electrician
0.667 1.00 Common Labor/Helper

16.1.2 Cable Conduits/Trunks LM 18 0.889


0.444 1.00 Electrician
0.444 1.00 Common Labor/Helper

16.1.3 Wire Pulling & Cable Laying LM 159 0.151


0.050 1.00 Electrician
0.101 2.00 Common Labor/Helper

16.1.4 Junction Boxes, Outlet Boxes EA 36 0.222


0.222 1.00 Electrician

Grounding (rod/plate copper with


16.1.5 excavation) EA 7 2.286
1.143 1.00 Electrician
1.143 1.00 Common Labor/Helper

16.2 Electrical Fixtures

Page 48 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④
16.2.1 Lighting Fixtures EA 12 1.333
0.667 1.00 Electrician
0.667 1.00 Common Labor/Helper

16.2.2 Fire Alarm Devices EA 20 0.800


0.400 1.00 Electrician
0.400 1.00 Common Labor/Helper

16.2.3 Receptacles & Switches EA 18 0.444


0.444 1.00 Electrician

16.2.4 Public Address System EA 1.5 10.667


5.333 1.00 Electrician
5.333 1.00 Common Labor/Helper

16.3 Power Distribution & Transformers

16.3.1 Circuit Breakers EA 2 8.000


4.000 1.00 Electrician
4.000 1.00 Common Labor/Helper

16.3.2 Panel Boards EA 0.7 22.857


11.429 1.00 Electrician
11.429 1.00 Common Labor/Helper

16.3.3 Switchboards EA 0.5 48.000


16.000 1.00 Electrician
32.000 2.00 Common Labor/Helper

Dry Type Transformer, less than 150


16.3.4 kVA EA 1 24.000
8.000 1.00 Electrician
16.000 2.00 Common Labor/Helper

Page 49 of 133
PRODUCTIVITY OUTPUT MONITORING

LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT DAILY AVERAGE PRODUCTIVITY PRODUCTIVITY February 2020
PRODUCTION (mh/unit) (eh/unit) No. Trade ① ② ③ ④

Dry Type Transformer,larger than


16.3.4 300 kVA EA 0.6 40.000
13.333 1.00 Electrician
26.667 2.00 Common Labor/Helper

16.4 ELECTRIC UTILITIES

16.4.1 Duct Bank LM 12 2.667 0.667


0.667 1.00 Medium Excavator
0.889 1.00 Equipment Operator
0.889 1.00 Electrician
0.889 1.00 Common Labor/Helper

Page 50 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 51 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 52 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 53 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 54 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 55 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 56 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 57 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 58 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 59 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 60 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 61 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 62 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 63 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 64 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 65 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 66 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 67 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 68 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 69 of 133
Actutal Productivity Output
March 2020 April 2020
⑤ ① ② ③ ④ ⑤ ① ② ③ ④ ⑤

Page 70 of 133
Production
Item Activity Description Unit
/Day

1.000 SITE WORK


1.100 Trench Excavation (Not to Exceed 1 m. deep) M3 100
1.200 Trench Excavation (Not to Exceed 2 m. deep) M3 70

2.000 BUILDING STRUCTURE


2.100 Excavation For Raft Foundation M3 34
2.200 Excavation For Isolated Footings M3 45

3.000 CONCRETE
3.100 Blinding Concrete M2 34

3.200 FOUNDATIONS (FORMS & REBAR FIXING INCLUDED)


a) Isolated Footing under 0.75 M3 M3 19
b) Isolated Footing over 4.0 M3 M3 40

3.300 RETAINING WALL (GRAVITY FORMS & REBAR INCL.)


a) 1200 mm High M3 33
b) 3000 mm High M3 62

3.400 GROUND BEAMS M3 77

3.500 SLAB ON GRADE (FORMS & REBAR INCLUDED)


0.000 a) 100 mm. thk. M2 207
0.000 b) 150 mm. thk. M2 202

3.550 SLAB ON GRADE (FORMS & REBAR INCLUDED )


0.000 a) 100 mm. thk. M3 34
0.000 b) 150 mm. thk. M3 51

3.600 COLUMNS ( FORMS & REBAR FIXING INCLUDED )


0.000 a) 300 mm. x 300 mm. M3 5
0.000 b) 400 mm. x 400 mm. M3 6.3

3.700 R.C.WALL ( FORMS & REBAR FIXING INCLUDED)


0.000 a) 200 mm.thk.x 2400 mm.High M3 23
0.000 b) 200 mm.thk.x 4275 mm.High M3 13.1

3.800 SUSPENDED BEAMS


a) 3.05 Meter Span M3 7.8
0.000 b) 7.60 Meter Span M3 9.2

3.900 SUSPENDED SOLID SLAB


0.000 a) 1-Way Beam & Slab M3 10.2
0.000 b) 2-Way Beam & Slab M3 12

3.910 WAFFLE SLAB


0.000 a) 762 mm. Dome M3 18.4

4.000 BLOCKWORK
4.100 a) 100 mm. Thk. CMU M2 18
4.200 b) 150 mm. Thk. CMU M2 16.5

5.000 METAL WORKS


5.100 a) Handrail & Railing ( Aluminum ) LM 27
5.200 b) Ladder ( Aluminum/Steel bolted to conc.) LM 17

7.100 DAMPPROOFING
0.000 a) Brushed on Below Grade, 1-coat M2 41
0.000 b) Brushed on Below Grade, 2-coat M2 31

7.200 WATERPROOFING ON SLAB


0.000 a) 1 - Ply Felt M2 181
0.000 b) 1 - Ply Glass Fiber Fabric M2 127
0.000 c) 2 - Ply Felt M2 151

7.300 WATERPROOFING TO ROOF DECK


0.000 a) Modified Bitumen; 3 mm. w/ torch Welding M2 169
0.000 b) Modified Bitumen; 4 mm. w/ torch Welding M2 121

7.400 INSULATION TO ROOF DECK


0.000 a) Extruded Polystyrene, 25 mm. thk. M2 90
0.000 b) Extruded Polystyrene, 51 mm. thk. M2 75

7.500 RIGID WALL INSULATION


0.000 a) Fiberglass; 25 mm. thk. M2 56
0.000 b) Fiberglass; 38 mm. thk. M2 56

7.600 METAL CLADDING


0.000 a) Sandwich Wall Panel ( Factory made ) M2 23
0.000 b) Corrugated, 0.61 mm thk. M2 47

8.000 DOORS & WINDOWS


0.000 a) Door Frame ( Steel ) NO. 4
0.000 b) Door Frame ( Wood ) NO. 4
0.000 c) Door Leaf ( Steel ) NO. 6
0.000 d) Door Leaf ( Wood ) NO. 6
0.000 e) Alum.Door NO. 2

9.000 Finishes
0.000 a) Portland Cement Plaster on Wall M2 20
0.000 b) Portland Cement Plaster to Soffit M2 12
0.000 c) Portland Cement Plaster to Suspended metal lath. M2 6
0.000 d) Gypsum Plaster on Wall M2 18
0.000 e) Gypsum Plaster on Suspended metal lath M2 6
e') Gypsum board 10 to 13mm on walls/ceiling with thin coat
85
of plaster finish. M2
e") Partition wall on metal stud, 2.4 to 3.7m high M2 29.1
0.000 f) Ceramic Wall Tiles M2 10
0.000 g) Ceramic Floor Tiles M2 8
0.000 h) Stone Wall Finish ( Marble/Granite by Mech. Fixing ) M2 3
0.000 j) Riyadh stone Wall Finish ( Mechanical fixing ) M2 3
0.000 k) Terrazzo tiles M2 7
0.000 l) Vinyl tiles M2 25

10.000 SPECIALTIES
0.000 a) Demountable Partition M2 10
0.000 b) Plastic Laminate Toilet Cubicle Nos. 3
0.000 c) Access Flooring M2 27
0.000 d) Toilet Paper Dispenser ( Surface Mounted ) Nos. 19
0.000 e) Soap Dispenser ( Surface Mounted ) Nos. 6
0.000 f) Towel Bar Holder - 457 mm Long Nos. 15
0.000 g) Towel Bar Holder - 762 mm Long Nos. 13

15.000 MECHANICAL

15.100 a) Cast Iron Pipes ( on Hangers 1.50 m. on center )


0.000 a.1) 50 mm dia. M 13.48
0.000 a.2) 80 mm dia. M 11.88
0.000 a.3) 100 mm dia. M 10.89
0.000 a.4) 125 mm dia. M 15.05
0.000 a.5) 150 mm dia. M 14.46
0.000 a.6) 200 mm dia. M 11.68

0.000 b) PVC Pipes ( on Hangers 1-Meter on center )


0.000 b.1) 50 mm dia. M 11.68
0.000 b.2) 65 mm dia. M 11.09
0.000 b.3) 80 mm dia. M 10.49
0.000 b.4) 100 mm dia. M 9.5
0.000 b.5) 125 mm dia. M 8.52
0.000 b.6) 150 mm dia. M 7.7

0.000 c.) Black Steel Pipe Schedule 40 (on Clevis hanger)


0.000 c.1) 10 mm dia. M 12.87
0.000 c.2) 15 mm dia. M 12.48
0.000 c.3) 20 mm dia. M 12.08
0.000 c.4) 25 mm dia. M 10.49
0.000 c.5) 32 mm dia. M 17.63
0.000 c.6) 40 mm dia. M 15.84
0.000 c.7) 50 mm dia. M 12.68
0.000 c.8) 65 mm dia. M 9.9
0.000 c.9) 80 mm dia. M 8.52

0.000 d) COPPER PIPES & TUBING ( Solder joints )


0.000 d.1) 8 mm dia. including Clevis Hangers M 16.64
0.000 d.2) 25 mm dia. including Clevis Hangers M 13.08
0.000 d.3) 50 mm dia. including Clevis Hangers M 7.9
0.000
15.200 PLUMBING FIXTURES
0.000 a) Western Type Water Closet Nos 3.44
0.000 b) Western Type Water Closet Nos 4
0.000 c) Lavatory Wall Hung Type Nos 4.5
0.000 d) Urinals Wall Hung Nos 2
0.000 0
15.300 AIR-CONDITIONING / VENTILATING
a) Fan Coil Unit
0.000 a.1) Fan Coil Unit - 1.8 KW Cooling Nos 5
0.000 a.2) Fan Coil Unit - 3.5 KW Cooling Nos 4
0.000 a.3) Fan Coil Unit - 10.5 KW Cooling Nos 3
0.000 a.4) Fan Coil Unit - 35 KW Cooling Nos 1.8
0.000 a.5) Fan Coil Unit - 53 KW Cooling Nos 0.9
b) Ductwork
0.000 b.1) Ductwork - Galv. Steel under 90 kg Kg 70
0.000 b.2) Ductwork - Galv. Steel 91 to 227 kg Kg 72
0.000 b.3) Ductwork - Galv. Steel 227 to 454 kg Kg 75
0.000 b.4) Ductwork - Galv. Steel 454 to 907 kg Kg 78
0.000 b.5) Ductwork - Galv. Steel 908 to 2268 Kg 81
0.000 c) Diffusers
0.000 c.1) Perforated, 610 mm x 610 mm Nos 10
0.000 c.2) Perforated, 203 mm x 203 mm Nos 9
0.000 c.3) Perforated, 229 mm x 229 mm 8
0.000 c.4) Perforated, 254 mm x 254 mm Nos 8
0.000 c.5) Perforated, 305 mm x 305 mm Nos 7
0.000 c.6) Perforated, 406 mm x 406 mm Nos 7
0
16.000 ELECTRICAL
0.000 a) CABLE TRAY LADDER W/ FITTINGS & SUPPORT
0.000 a.1) 152 mm Wide Galvanized Steel Tray M 9.7
0.000 a.2) 305 mm Wide Galvanized Steel Tray M 8.5
0.000 a.3) 457 mm Wide Galvanized Steel Tray M 8.1
0.000 a.4) 610 mm Wide Galvanized Steel Tray M 7.7

0.000 b) CONDUITS INCL. TERMINATION & CLAMP


0.000 b.1) 15 mm dia. Rigid Galvanized Steel M 17.8
0.000 b.2) 20 mm dia. Rigid Galvanized Steel M 15.8
0.000 b.3) 25 mm dia. Rigid Galvanized Steel M 12.8
0.000 b.4) 32 mm dia. Rigid Galvanized Steel M 11.8
0.000 b.5) 40 mm dia. Rigid Galvanized Steel M 10.8
0.000 b.6) 50 mm dia. Rigid Galvanized Steel M 8.9

0.000 c) BOXES
0.000 c.1) Outlet Box ,Octagon,102 mm Nos 13
0.000 c.2) Outlet Box, Square,102 mm Nos 13
0.000 c.3) Switch Box, Nos 17
0.000 c.4) Pull Box, 152 mm W x 152 mm H x 102 mm D Nos 5
0.000 c.5) Pull Box,203 mm W x 203 mm H x 102 mm D Nos 5
0.000 c.6) Pull Box,254 mm W x 305 mm H x 152 mm D Nos 3

0.000 d) WIRING DEVICES


0.000 d.1) Flush Switch, Standard Nos 26
0.000 d.2) Surface Switch, Standard Nos 26
0.000 d.3) Master Control, 12 Circuit, Manual Nos 2
0.000 d.4) Rectifier, Silicon Nos 8
0.000 d.5) Switch Plates,1 Gang,1,2 or 3 Switch Nos 52
0.000 d.6) Switch Plates, 2 Gang,3 Switch, Stainless Nos 34

0.000 e) BOARDS
0.000 e.1) Circuit Breakers ( enclosure )
0.000 e.1.1) Enclosed (Nema 1) 600 V,3 Pole,30 A Nos 2
0.000 e.1.2) 60 A Nos 1.8
0.000 e.1.3) 100 A Nos 1.5
0.000 e.1.4) 225 A Nos 0.9
0.000 e.1.5) 400 A Nos 0.5
0.000 e.1.5) 600 A Nos 0.4

0.000 f) LIGHTING FIXTURES


0.000 Interior Lighting Fixtures
0.000 f.1) Fluorescent, Acrylic Lens, Recess Mounted
0.000 f.1.1) 300 mm W x1200 mm L, Two 40 W Nos 3.7
0.000 f.1.2) 300 mm W x1200 mm L, Three 40 W Nos 3.5
0.000 f.1.3) 600 mm W x 600 mm L, Two U 40 W Nos 3.7
0.000 f.1.4) 600 mm W x1200 mm L, Two 40 W Nos 3.4
0.000 f.1.5) 600 mm W x1200 mm L,Three 40 W Nos 3.2
0.000 f.1.6) 600 mm W x1200 mm L,four 40 W Nos 3

17.000 TIMBER FORMWORK FABRICATION


a) TIMBER WORK FABRICATION
a.1) Raft Foundation / Strip Footing M2 15
a.2) Single Foundation M2 12
a.3) Column M2 9
a.4) Wall M2 10
a.5) Column Bracket M2 5
a.6) Tie Beam M2 10
a.7) Beam M2 10
a.8) Wall Bracket LM 13

b) FORMWORK ERECTION
b.1) Pre-Fabricated Raft Foundation / Strip Footing M2 16
b.2) Pre-Fabricated Single Foundation M2 14
b.3) Pre-Fabricated Column M2 11
b.4) Pre-Fabricated Column w/ Bracket M2 10
b.5) Pre-Fabricated Wall w/o Bracket M2 11
b.6) Pre-Fabricated Wall w/ Bracket M2 10
b.7) Pre-Fabricated Tie Beam M2 10
b.8) Pre-Fabricated Beams Including Drop Beam M2 8
b.9) Pre-Fabricated Steel Column M2 16

28.000 PLUMBING
a) BATH ROOMS AND TOILETS
a.1) Drainage and Vents by Using PVC Pipes and
1
Fittings for Class A Building Fixture
a.2) Ditto For Class B & C Buildings & Hotels Fixture 1
a.3) Testing Of Drainage Piping Fixture 1
a.4) Hot and Cold Water Pipes and Fittings for Class A 1
Including Wall Chipping Fixture
a.5) Ditto Class B & C Fixture 1
a.6) Testing Of Hot & Cold Water Piping in Bath Rooms 1
Toilets Fixture

b) PLUMBING FIXTURES
b.1) Bath Tubs, Porcelain Enabled On Cast Iron No 1
b.2) Bath Tubs Acrylic Type No 1
b.3) Shower Tray No 1
b.4) Floor Mounted WC No 1
b.5) Floor Mounted Lavatory No 1
b.6) Pedestal Mounted Lavatory No 1
b.7) Cabinet Mounted Lavatory No 1
b.8) Carrier For Wall Mounted Sanitary Fixtures No 1
b.9) Wall Mounted WC No 1
b.10) Wall Mounted Bidet No 1
b.11) Wall Mounted Lavatory No 1
b.12) Wall Mounted Lavatory No 1
b.13) Floor Drain Cover No 1
b.14) Floor Clean Out Cover No 1
b.15) Kitchen Sink No 1
b.16) Laundry Sink No 1
b.17) Janitor Sink No 1
b.18) Hose Bibb / Spray Hose No 1

c) BATH ROOMS & WASH AREA ACCESSORIES


c.1) Lavatory Shelf No 1
c.2) Lavatory Mirror No 1
c.3) Soap Holder / Dispenser No 1
c.4) Towel Holder No 1
c.5) Napkin Dispenser No 1
c.6) Toilet Tissue Dispenser No 1
c.7) Robe Hook No 1
c.8) Waste Receptacle No 1
c.9) Hand Dryer No 1

c) DRAINAGE CAST IRON PIPES AND FITTINGS


INCLUDING HANGERS
c.1) 2" ‫ئ‬ LMT 1
c.2) 3" ‫ئ‬ LMT 1
c.3) 4" ‫ئ‬ LMT 1
c.4) 5" ‫ئ‬ LMT 1
c.5) 6" ‫ئ‬ LMT 1
c.6) 8" ‫ئ‬ LMT 1
c.7) 10" ‫ئ‬ LMT 1
c.8) 12" ‫ئ‬

29.00 EXTERNAL WATER UNDERGROUND SERVICES


a) EXTERNAL U/G DRAINAGE SYSTEM BY USING UPVC
Pipes and Fittings - Class 4
a.1) 4" ‫ئ‬ LMT 1
a.2) 6" ‫ئ‬ LMT 1
a.3) 8" ‫ئ‬ LMT 1
a.4) 10" ‫ئ‬ LMT 1

b) EXTERNAL U/G STORM WATER - ASBESTOS CEMENT


PIPE
b.1) 6" ‫ئ‬ LMT 1
b.2) 8" ‫ئ‬ LMT 1
b.3) 10" ‫ئ‬ LMT 1
b.4) 12" ‫ئ‬ LMT 1
b.5) 14" ‫ئ‬ LMT 1
b.6) 16" ‫ئ‬ LMT 1
b.7) 20" ‫ئ‬ LMT 1
b.8) 24" ‫ئ‬ LMT 1
b.9) 28" ‫ئ‬ LMT 1
b.10) 32" ‫ئ‬ LMT 1
b.11) 36" ‫ئ‬ LMT 1
b.12) 40" ‫ئ‬ LMT 1

c) EXTERNAL U/G STORM WATER - ASBESTOS CEMENT


PIPE
c.1) 2 " ‫ئ‬ LMT 1
c.2) 2 1/2" ‫ئ‬ LMT 1
c.3) 3" ‫ئ‬ LMT 1
c.4) 4" ‫ئ‬ LMT 1
c.5) 5" ‫ئ‬ LMT 1
c.6) 6" ‫ئ‬ LMT 1
c.7) 8" ‫ئ‬ LMT 1
c.8) 10" ‫ئ‬ LMT 1
c.9) 12" ‫ئ‬ LMT 1

30.00 HVAC SYSTEM


a) AIR SYSTEM
a.1) Installation Of Galvanized Rectangle Ducts Including
1
Supports, Fittings w/o Insulation LMT
a.2) Installation Of Stainless Steel Rectangle Ducts Including 1
Supports, Fittings w/o Insulation LMT
a.3) Inst'ln of Insulated Flexible Rnd. Duct 4" ‫ئ‬ LMT 1
a.4) Inst'ln of Insulated Flexible Rnd. Duct 5" ‫ئ‬ LMT 1
a.5) Inst'ln of Insulated Flexible Rnd. Duct 6" ‫ئ‬ LMT 1
a.6) Inst'ln of Insulated Flexible Rnd. Duct 8" ‫ئ‬ LMT 1
a.7) Inst'ln of Insulated Flexible Rnd. Duct 10" ‫ئ‬ LMT 1

Duct Insulation
a.8) Board Type Fiber Glass 1" Thick M2 1
a.9) Board Type Fiber Glass 1 1/2 " Thick M2 1
a.10) Board Type Fiber Glass 2" Thick M2 1

Blanket Type Fiber Glass Flexible Insulation


a.11) Blanket Type Fiberglass Flexible Insulation 1" Thick M2 1
1
a.12) Blanket Type Fiberglass Flexible Insulation 1 1/2" Thick M2
a.13) Blanket Type Fiberglass Flexible Insulation 2" Thick M2 1
a.14) Wrapping Of Canvass Cloth applying Of Weather 1
Proofing Material M2
a.15) Aluminum Cladding M2 1
a.16) Installation of VAV's with Motorized Dampers Different 1
sizes Without Heater NO
a.17) Installation of VAV's with Motorized Dampers Different 1
sizes With Heater NO
a.18) Installation Of Flashing Around Duct On Roof Curbs NO 1
a.19) Installation Of Motorized Volume Control Dampers
1
Different Sizes NO
a.20) Installation Of Vol. Dampers Different Sizes NO 1
a.21) Installation Of duct Access Door NO 1
a.22) Installation Of Duct Heaters NO 1
a.23) Installation Of Sound Attenuators NO 1
a.24) Installation Of Plenums Different Sizes LMT 1
a.25) Installation OF Supply Grilles Diff. Sizes LMT 1
a.26) Installation Of Return Grilles Different Size LMT 1
a.27) Installation Of Square Supply Grilles & Diffusers NO 1
a.28) Installation Of Return Grilles and Diffusers NO 1

31.00 INTERNAL ELECTRICAL WORKS


a) LIGHTING NORMAL POINTS CONDUITS
a.1) Installation Of 20mm PVC Conduits and Boxes
1
Embedded in Concrete, for Normal Lighting Outlet Point Point
a.2) - ditto - but using exposed PVC Conduits Point 1
a.3) - ditto - but using embedded EMT Conduits Point 1
a.4) - ditto - but using exposed EMT Conduits Point 1
a.5) - ditto - but using embedded R.S. Conduits Point 1
a.6) - ditto - but using exposed R.S. Conduits Point 1

b) 4mm2 Wires For Normal Lighting Points Point 1

c) CHANDELIER LIGHTING POINTS


c.1) Installation of 25mm PVC Conduits and Boxes 1
Embedded In Concrete For Chandelier Lighting Outlet Point Point
c.2) - ditto - but using exposed PVC Conduits Point 1
c.3) - ditto - but using embedded EMT Conduits Point 1
c.4) - ditto - but using exposed EMT Conduits Point 1
c.5) - ditto - but using embedded R.S. Conduits Point 1
c.6) - ditto - but using exposed R.S. Conduits Point 1

d) 6mm2 Wires For Normal Lighting Points Point 1

e) LIGHTING SWITCH POINT


e.1) Installation of 20mm embedded PVC Conduits and
Boxes for Lighting Switches and Dimmers Including Wall 1
chipping Point
e.2) - ditto - but using exposed PVC Conduits Point 1
e.3) - ditto - but using embedded EMT Conduits Point 1
e.4) - ditto - but using exposed EMT Conduits Point 1
e.5) - ditto - but using embedded R.S. Conduits Point 1
e.6) - ditto - but using exposed R.S. Conduits Point 1
f) Wiring For Switch Point Point 1
g) Installation of Switch Device Point 1

32.00 EXTERNAL ELECTRICAL WORKS


a) Duct Banks Of PVC Conduits Including spacers Ready For
Concrete
a.1) 2 x 50 mm Conduits LMT 1
a.2) 2 x 75 mm Conduits LMT 1
a.3) 2 x 110 mm Conduits LMT 1
a.4) 4 x 50 mm Conduits LMT 1
a.5) 4 x 75 mm Conduits LMT 1
a.6) 4 x 110 mm Conduits LMT 1
a.7) 4 x 160 mm Conduits LMT 1
a.8) 6 x 110 mm Conduits LMT 1
a.9) 6 x 160 mm Conduits LMT 1
a.10) Grounding Wire Along The duct LMT 1

b) Stub UPS by Using PVC Elbows


b.1) 1 x 50mm ‫ئ‬ NO 1
b.2) 1 x 75mm ‫ئ‬ NO 1
b.3) 1 x 110mm ‫ئ‬ NO 1

c) Stub UPS by using Rigid Steel Elbows Including Adaptor Bet.


PVC & Rigid Steel Elbows
c.1) 1 x 2mm ‫ئ‬ NO 1
c.2) 1 x 3mm ‫ئ‬ NO 1
c.3) 1 x 4mm ‫ئ‬ NO 1
c.4) 1 x 6mm ‫ئ‬ NO 1

d) PVC End Bells


d.1) 50mm ‫ئ‬ NO 1
d.2) 75mm ‫ئ‬ NO 1
d.3) 110mm ‫ئ‬ NO 1
d.4) 160mm ‫ئ‬ NO 1
Crew Description

Resource Qty Resource Qty Resource Qty Resource Qty Resource Qty

Backhoe Optr 1 Dump Truck Driver 2 Labourer 3


Backhoe Optr 1 Dump Truck Driver 2 Labourer 3

Backhoe Optr 1 Dump Truck Driver 2 Labourer 3


Backhoe Optr 1 Dump Truck Driver 2 Labourer 3

Rghcarp 2 Mason 2 Labourer 3

Foreman 1 Rghcarp 6 Stlfxr 2 Mason 1 Labourer 4


Foreman 1 Rghcarp 6 Stlfxr 2 Mason 1 Labourer 4

Foreman 1 Rghcarp 18 Stlfxr 2 Mason 1 Labourer 2


Foreman 1 Rghcarp 18 Stlfxr 2 Mason 1 Labourer 2

Foreman 1 Rghcarp 16 Stlfxr 4 Mason 1 Labourer 2

Labourer Foreman 1 Mason 6 Labourer 2


Labourer Foreman 1 Mason 6 Labourer 2

Carp. Foreman 1 Rghcarp 2 Stlfxr 4 Labourer 3 Mason 1


Carp. Foreman 1 Rghcarp 2 Stlfxr 4 Labourer 3 Mason 1

Carp. Foreman 1 Rghcarp 6 Stlfxr 2 Labourer 4 Mason 1


Carp. Foreman 1 Rghcarp 6 Stlfxr 2 Labourer 4 Mason 1

Carp. Foreman 1 Rghcarp 14 Stlfxr 6 Labourer 2 Mason 1


Carp. Foreman 1 Rghcarp 14 Stlfxr 6 Labourer 2 Mason 1

Carp. Foreman 1 Rghcarp 12 Stlfxr 4 Labourer 2 Mason 1


Carp. Foreman 1 Rghcarp 12 Stlfxr 4 Labourer 2 Mason 1

Carp. Foreman 1 Rghcarp 16 Stlfxr 4 Mason 2 Labourer 2


Carp. Foreman 1 Rghcarp 16 Stlfxr 4 Mason 2 Labourer 2

Carp. Foreman 1 Rghcarp 16 Stlfxr 4 Mason 2 Labourer 2


Blocklayer 3 Labourer 2
Blocklayer 3 Labourer 2

Strc. Steel Worker 3


Strc. Steel Worker 3

Labourer 1
Labourer 1

Waterproofer 4 Labourer 2
Waterproofer 4 Labourer 2
Waterproofer 4 Labourer 2

Waterproofer 2 Labourer 2
Waterproofer 2 Labourer 2

Labourer 1
Labourer 1

Rough Carpenter 1
Rough Carpenter 1

Metal Sheet Worker 2 Helper 2


Metal Sheet Worker 2 Helper 2

Finishing Carp 2
Finishing Carp 2
Finishing Carp 2
Finishing Carp 2
Aluminum Installer 2

Plasterer 2 Labourer 1
Plasterer 2 Labourer 1
Plasterer 2 Labourer 1
Plasterer 2 Labourer 1
Plasterer 2 Labourer 1
0.125 2 1
Lab. Foreman Fin. Carpenter labour
Lab. Foreman 0.125 Fin. Carpenter 2 labour 1
Tile Setter 2 Labourer 1
Tile Setter 2 Labourer 1
Marble Setter 1 Labourer 1
Stone Fixer 1 Labourer 1
Tile Setter 1 Helper 1
Tile Setter 1 Labourer 1

Finishing Carp 2
Finishing Carp 2
Finishing Carp 2
Finishing Carp 1
Finishing Carp 1
Finishing Carp 1
Finishing Carp 1

Plumber 1 Helper Plumber 1


Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumbers 2 Helper Plumber 1
Plumbers 2 Helper Plumber 1
Plumber Foreman Plumbers 2 Helper Plum 1

Plumber 1 Helper Plumber 1


Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1

Plumber 1
Plumber 1
Plumber 1
Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1

Plumber 1
Plumber 1
Plumber 1

Plumber 1 Helper Plumber 1


Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
Plumber 1 Helper Plumber 1
A/C Technician 1 Helper 1
A/C Technician 1 Helper 1
A/C Technician 1 Helper 1
A/C Technician 2 Helper 1
A/C Technician 2 Helper 1

Ductmen 2 Helper 1
Ductmen 2 Helper 1
Ductmen 2 Helper 1
Ductmen 2 Helper 1
Ductmen 2 Helper 1

Ductman 1
Ductman 1
Ductman 1
Ductman 1
Ductman 1
Ductman 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1

Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1
Electrician 1

Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 16 Labourer 8
Carpenter 2 Labourer 1
Carpenter 1 Labourer 1
Carpenter 1 Labourer 1

Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 2 Labourer 1
Carpenter 1 Labourer 1
Carpenter 1 Labourer 1
Carpenter 2 Labourer 1
Total Hour
Hours /Unit

48 0.48
48 0.69

48 1.41
48 1.07

56 1.65

112 5.89
112 2.80

192 5.82
192 3.10

192 2.49

0
72 0.35
72 0.36

0
88 2.59
88 1.73

0
112 22.40
112 17.78

0
192 8.35
192 14.66

0
160 20.51
160 17.39

0
200 19.61
200 16.67

0
200 10.87

0
40 2.22
40 2.42

0
24 0.89
24 1.41

0
8 0.20
8 0.26

0
48 0.27
48 0.38
48 0.32

0
32 0.19
32 0.26

0
8 0.09
8 0.11

0
8 0.14
8 0.14

0
32 1.39
32 0.68

0
16 4.00
16 4.00
16 2.67
16 2.67
16 8.00

0
24 1.20
24 2.00
24 4.00
24 1.33
24 4.00
25 0.29
25 0.86
24 2.40
24 3.00
16 5.33
16 5.33
16 2.29
16 0.64

0
16 1.60
16 5.33
16 0.59
8 0.42
8 1.33
8 0.53
8 0.62

0
16 1.19
16 1.35
16 1.47
24 1.59
24 1.66
24 2.05

0
16 1.37
16 1.44
16 1.53
16 1.68
16 1.88
16 2.08

0
8 0.62
8 0.64
8 0.66
8 0.76
16 0.91
16 1.01
16 1.26
16 1.62
16 1.88

0
8 0.48
8 0.61
8 1.01
0
0
16 4.65
16 4.00
16 3.56
16 8.00
0
0
16 3.20
16 4.00
16 5.33
24 13.33
24 26.67

24 0.34
24 0.33
24 0.32
24 0.31
24 0.30
0
8 0.80
8 0.89
8 1.00
8 1.00
8 1.14
8 1.14
0
0
0
8 0.82
8 0.94
8 0.99
8 1.04

0
8 0.45
8 0.51
8 0.63
8 0.68
8 0.74
8 0.90

0
8 0.62
8 0.62
8 0.47
8 1.60
8 1.60
8 2.67

0
8 0.31
8 0.31
8 4.00
8 1.00
8 0.15
8 0.24

0
0
8 4.00
8 4.44
8 5.33
8 8.89
8 16.00
8 20.00

0
0
0
8 2.16
8 2.29
8 2.16
8 2.35
8 2.50
8 2.67

24 1.60
24 2.00
24 2.67
24 2.40
192 38.40
24 2.40
16 1.60
16 1.23

0
24 1.50
24 1.71
24 2.18
24 2.40
24 2.18
24 2.40
16 1.60
16 2.00
24 1.50

0
0
0
0 9.50
0 8.00
0 1.00
0 15.60
0 13.00
0 1.30

0
0 10.00
0 8.00
0 6.00
0 8.00
0 8.00
0 8.00
0 7.00
0 4.00
0 7.00
0 7.00
0 7.00
0 6.00
0 2.00
0 1.50
0 8.00
0 7.00
0 7.00
0 1.00

0
0 1.20
0 1.20
0 2.00
0 1.20
0 1.20
0 1.20
0 0.40
0 2.00
0 2.00

0 2.50
0 3.00
0 4.00
0 6.00
0 7.00
0 9.00
0 12.00
14.00

0
0
0
0 1.50
0 1.50
0 2.00
0 2.00

0 2.00
0 2.30
0 2.50
0 3.00
0 4.00
0 4.50
0 5.00
0 5.00
0 5.50
0 6.50
0 7.80
0 9.00

0 1.00
0 1.20
0 1.20
0 1.50
0 1.50
0 1.50
0 2.00
0 2.00
0 2.50

0
0
0 0.50

0 0.50
0 0.28
0 0.31
0 0.34
0 0.47
0 0.60

0
0 1.40
0 1.60
0 1.80

0
0 0.60
0 0.67
0 0.71
0 2.00
0 2.10
0 12.00

0 16.00
0 5.00
0 3.00
0 2.00
0 1.45
0 3.00
0 6.00
0 1.00
0 1.30
0 1.10
0 1.50
0 1.20
0
0
0
0 2.00
0 2.61
0 2.72
0 3.10
4.74
5.53

1.38

4.00
5.15
5.29
6.67
9.42
10.88

2.32

2.30

1.71
3.00
2.30
4.02
3.38
1.20
0.35

0.30
0.36
0.46
0.60
0.72
0.92
1.20
1.38
1.80
0.12

0.50
0.60
0.70

1.00
1.40
1.80
2.10

0.30
0.35
0.45
0.55
NUMBER DESCRIPTION OF ACTIVITY PRODUCTION/DAY(8HOURS)
1 TIMBER FORMWORK FABRICATION
1.A RAFT FOUNDATION/STRIP FOOTING 15 M2
1.B SINGLE FOUNDATION 12 M2
1.C COLUMN 8-10 M2
1.D WALL 10 M2
1.E COLUMN BRACKET 5 NO.
1.F TIE BEAM 10 M2
1.G BEAM 10 M2
1.H WALL BRACKET 13 LM
2 FORMWORK ERECTION
PRE-FABRICATED RAFT FOUNDATION/STRIP FOOTING 16 M2
2.A

2.B PRE-FABRICATED SINGLE FOUNDATION 14 M2


2.C PRE-FABRICATED COLUMN 11 M2
2.D PRE-FABRICATED COLUMN WITH BRACKET 10 M2
2.E PRE-FABRICATED WALL WITHOUT BRACKET 11 M2
2.F PRE-FABRICATED WALL WITH BRACKET 10 M2
2.G PRE-FABRICATED TIE BEAM 10 M2
2.H PRE-FABRICATED BEAMS INCLUDING DROP BEAM 8 M2
2.K PRE-FABRICATED STEEL COLUMN 4 PCS
IN-SITU SUSPENDED SLAB/ INCLUDING BEAMS & DROP 16 M2
2.L
BEAM & STEEL PROPS
2.M FIXING WAFFLE OVER READY MADE SHUTTERING 11 M2
2.N IN-SITU COLUMN'S NECK -TIMBER BOARD 8 M2
2.O IN-SITU STAIR & PLATFORM-TIMBER BOARD F/W 6 M2
2.P IN-SITU BLINDING CONCRETE F/W- TIMBER BOARD 10 M2
STRIPPING , CLEANING ,& HOISTING FORMWORK TO
3
NEXT PLACE
PRE-FABRICATED RAFT FOUNDATION/STRIP FOOTING 80 M2
3.A

3.B PRE-FABRICATED SINGLE FOUNDATION 60 M2


3.C PRE-FABRICATED COLUMN 45 M2
3.D PRE-FABRICATED COLUMN WITH BRACKET 44 M2
3.E PRE-FABRICATED WALL WITHOUT BRACKET 60 M2
3.F PRE-FABRICATED WALL WITH BRACKET 55 M2
3.G PRE-FABRICATED TIE BEAM 35 M2
3.H PRE-FABRICATED BEAMS INCLUDING DROP BEAM 30 M2
3.K PRE-FABRICATED STEEL COLUMN 8 PCS
IN-SITU SLAB/ INCLUDING BEAM ,DROP BEAM , & STEEL 90 M2
3.L
PROPS
3.M FIXING WAFFLE OVER READY MADE SHUTTERING 50 M2
3.N IN-SITU COLUMN'S NECK -TIMBER BOARD 30 M2
3.O IN-SITU STAIR & PLATFORM-TIMBER BOARD F/W 24 M2
3.P IN-SITU BLINDING CONCRETE F/W- TIMBER BOARD 40 M2
4 STEEL RE-BAR REINFORCEMENT FABRICATION
4.A RAFT/STRIP FOOTING 1000 KG
4.B SINGLE FOOTING 900 KG
4.C RECTANGULAR COLUMN WITHOUT BRACKET 600 KG
4.D RECTANGULAR COLUMN WITH BRACKET 550 KG
4.E WALL WITHOUT BRACKET 650 KG
4.F WALL WITH BRACKET 600 KG
4.G TIE BEAM 600 KG
4.H BEAMS INCLUDING DROP BEAM 600 KG
4.K ROUNDED COLUMN 550 KG
4.L SLAB/ INCLUDING BEAM ,DROP BEAM , 650 KG
WAFFLE SYSTEM INCLUDING MAIN BEAMS, SECONDARY 600 KG
4.M
BEAMS, & TOP SLAB
5 STEEL RE-BAR REINFORCEMENT ERECTION
5.A RAFT/STRIP FOOTING 900 KG
5.B SINGLE FOOTING 850 KG
5.C RECTANGULAR COLUMN WITHOUT BRACKET 350 KG
5.D RECTANGULAR COLUM WITH BRACKET 325 KG
5.E WALL WITHOUT BRACKET 400 KG
5.F WALL WITH BRACKET 350 KG
5.G TIE BEAM 400 KG
5.H BEAMS INCLUDING DROP BEAM 350 KG
5.K ROUNDED COLUM 350 KG
5.L SLAB/ INCLUDING BEAM ,DROP BEAM , 400 KG
WAFFLE SYSTEM INCLUDING MAIN BEAMS, SECONDARY 350 KG
5.M
BEAMS, & TOP SLAB
6 CONCRETE PLACING
RAFT/STRIP FOOTING/WITH 1M3 TOWER CRANE BUCKET 80 m3
6.A
OR WITH BUCKET & TRANSIT MIXER
RAFT/STRIP FOOTING/WITH TRANSIT MIXER DIRECTLY 160 M3
6.B

6.C RAFT/STRIP FOOTING/ WITH CONCRETE PUMP 160 M3


SINGLE FOOTING WITH 1M3 TOWER CRANE BUCKET OR 70 M3
6.D
WITH BUCKET & TRANSIT MIXER
6.E SINGLE FOOTING WITH TRANSIT MIXER DIRECTLY 140 M3
6.F SINGLE FOOTING WITH CONCRETE PUMP 140 M3
COLUM WITH0.75M3 TOWER CRANE BUCKET OR WITH 40 M3
6.G
BUCKET & TRANSIT MIXER
6.J COLUM WITH CONCRETE PUMP 48 M3
WALL WITH 0.75M3 TOWER CRANE BUCKET OR WITH 48 M3
6.H
BUCKET & TRANSIT MIXER
6.K WALL WITH CONCRETE PUMP 65 M3
TIE BEAM WITH 0.75M3 TOWER CRANE BUCKET OR 65 M3
6.L
WITH BUCKET & TRANSIT MIXER
6.M TIE BEAM WITH TRANSIT MIXER DIRECTLY 80 m3
6.N TIE BEAM WITH C0NCRETE PUMP 75 M3
BEAMS , DROP BEAM WITH 0.75M3 CRANE BUCKET OR 60 M3
6.O
WITH BUCKET & TRANSIT MIXER
6.P BEAMS ,& DROP BEAMS WITH CONCRETE PUMP 70 M3
SLAB & BEAMS , WITH 1M3 TOWER CRANE BUCKET OR 80 m3
6.Q
WITH BUCKET & TRANSIT MIXER
6.R SLAB INCLUDING BEAMS WITH CONCRETE PUMP 90 M3
WAFFLE SYSTEM SLAB WITH 1M3 BUCKET OR WITH 80 m3
6.S
BUCKET & TRANSIT MIXER
6.T WAFFLE SYSTEM SLAB WITH CONCRETE PUMP 90 M3
COLUMN'S NECK WITH 0.75M3 TOWER CRANE BUCKET 40 M3
6.U
OR WITH BUCKET & TRANSIT MIXER
6.V COLUMNS NECK WITH CONCRETE PUMP 48 M3
STAIR & PLATFORM WITH 0.75M3 TOWER CRANE 50 M3
6.X
BUCKET OR WITH BUCKET & TRANSIT MIXER
6.Y STAIR & PLATFORM WITH CONCRETE PUMP 60 M3
BLINDING WITH 1M3 TOWER CRANE BUCKET OR WITH 70 M3
6.W
BUCKET & TRANSIT MIXER
6.Z BLINDING WITH TRANSIT MIXER DIRECTLY 75 M3
6.AB BLINDING WITH CONCRETE PUMP 90 M3
GENERAL CONCRETE RESOURCES WHICH ARE
INCLUDED IN THE ABOVE
TRANSIT MIXER
BUCKET LOADING & UNLOADING
CONCRETE PUMP FEED IN & AT THE FEED OUT TO HOLD
THE HOSE FOR PLACING CONCRETE
7 WATER PROOFING
KEY & WATER BAR FORMATION FOR EXP/CONST. JOINTS 15-20 L.M
7.A

7.B WATER PROOFING MEMBRANE @ FOOTING 250 M2


WATER PROOFING MEMBRANE @ WALL OR COLUMN 150 M2
7.C

7.D DAMPNING SHEET 400 M2


7.E BITUMEN COATING 300 M2
8 MASONARY BLOCK WORK
8.A 100 MM BLOCK WITH ALL ACCESSORIS 9 M2
8.B 150 MM BLOCK WITH ALL ACCESSORIES 8 M2
8.C 200 MM BLOCK WITH ALL ACCESSORIES 7 M2
8.D 100 MM BLOCK WITHOUT ACCESSORIES 16 M2
8.E 150 MM BLOCK WITHOUT ACCESSORIES 14 M2
8.F 200 MM BLOCK WITHOUT ACCESSORIES 12 M2
FINISHING WORK
9 PLASTERING
9.A PLASTER ACCESSORIES 20 M2
9.B BROWN COAT PLASTER 200 M2
9.C FINISHING COAT PLASTERING 10 M2
10 FLOORING
10.A CEMENT SAND SCREED 25 M2
10.B CEMENT SAND SCREED & FLOOR HARDENER 50 M2
11 TILING
11.A CERAMIC FLOOR TILE (MORTAR) 200*200 15 M2
11.B CERAMIC WALL TILE (ADHESIVE) 200*200 18 M2
11.C TERRAZO TILING 40 M2
11.D MARBLE/GRANITE FLOOR TILING 400*400*20 10 M2
11.E GRANITE WALL TILING (NOT MECHANICAL) 5 M2
11.F SKIRTING (TERRAZO) 30 L.M
11.G CONCRETE TILES 40 M2
12 PAINTING
12.A EMULSION PAINT (ALL COATS) 100 M2
12.B EMULSION PAINT 1ST & 2ND COATS 120 M2
12.C EMULSION PAINT FINAL COAT 200 M2
12.D OIL PAINT PER COAT 30 M2
13 FALSE CEILING
13.A F/C ALM. & MINERAL ACOUSTICAL TILE COMPL. 20 M2
13.B F/C GIPSUM BOARD COMPLETE 25 M2
13.C F/C HANGERS & FRAMES ONLY 20 M2
13.D F/C TILES ONLY 35 M2
14 JOINARY WORKS
14.A STEEL FRAME 3 PCS
14.B WOODEN FRAME 3 PCS
14.C TIMBER DOORS 4 PCS
14.D STEEL DOORS 2 PCS
14.E SPECIAL DOORS 1 PCS
14.F CUBICAL DOORS 4 PCS
14.G WOODEN MASHRABIA 4 M2
15 ALUMINUM WORKS
15.A ALUMINUM PARTITIONS 15 M2
15.B ALUMINUM WINDOWS 15 M2
15.C ALUMINUM DOORS 15 M2
16 ROOFING WORKS
16.A SCREED TO SLOPE 15 M2
16.B MEMBRANE (TOURCH APPLIED) 30 M2
16.C POLYSTIREIN HEAT INSOLATION 50 M2
16.D METAL FRAME & FLASHING WORKS 15 L.M
16.E JOINTING WORK 20 L.M
16.F BALAST APPLICATION 20 M2
17 STONE CLADING
17.A ORDINARY FACADE 4 M2
17.B SPECIAL FACADE 3 M2
LABOR RESOURCES REQUIRED THEIR NUMBER

2 CARPENTER + 1 LABOR
2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
16 CARPENTER + 8 LABORER
2CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER

2 CARPENTER + 1 LABORER

2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
2 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABRER
2 CARPENTER +1 LABORER
2 CARPENTER + 1 LABORER

2 CARPENTER +1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER

1 CARPENTER + 1 LABORER

1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 2 LABORER
1 CARPENTER + 2 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER +1 LABORER
1 CARPENTER + 3 LABORER

1 CARPENTER +3 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
1 CARPENTER + 1 LABORER
2 STEEL FIXER + 2 LABORER
2 STEEL FIXER + 2 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER

2 STEEL FIXER + 2 LABORER


2 STEEL FIXER + 2 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER
2 STEEL FIXER + 1 LABORER

BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LABORER
1 CARPENTER + 1 STEEL FIXER +2 MASON+5 LABORER

1 CARPENTER + 1 STEEL FIXER +2 MASON+8 LABORER


BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LABORER
1 CARPENTER + 1 STEEL FIXER +2 MASON+5 LABORER
1 CARPENTER + 1 STEEL FIXER +2 MASON+8 LABORER
BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LABORER
1 CARPENTER +1 MASON+6 LABORER
BUCKET=1CARPENTER+1MASON+ 6 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 7 LABORER
1 CARPENTER +1 MASON+7 LABORER
BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LABORER
1 CARPENTER +1 MASON+3 LABORER
1 CARPENTER +1 MASON+6 LABORER
BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LABORER
1 CARPENTER +1 MASON+6 LABORER
BUCKET=1CARPENTER+1STEEL FIXER+2MASON+6 LAB.
BUCKET+TRANSIT MIXER=1CARPENTER+ST.FIXER+2MASON+ 6 LAB.
1 CARPENTER +1ST.FIXER+2 MASON+7 LAB.
BUCKET=1CARPENTER+1STEEL FIXER+2MASON+6 LAB.
BUCKET+TRANSIT MIXER=1CARPENTER+ST.FIXER+2MASON+ 6 LAB.
1 CARPENTER +1ST.FIXER+2 MASON+7 LABORER
BUCKET=1CARPENTER+1MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARPENTER+1MASON+ 6 LAB.
1 CARPENTER +1 MASON+6 LABORER
BUCKET=1CARPENTER+1ST.FIXER+2MASON+ 5 LAB.
BUCKET+TRANSIT MIXER=1CARP.+1ST.FIXER+2MASON+ 6 LAB.
1 CARPENTER +1ST.FIXER+2 MASON+7 LABORER
BUCKET=1CARPENTER+2MASON+ 5 LABORER
BUCKET+TRANSIT MIXER=1CARP.+2MASON+ 6 LAB.
1 CARPENTER +2 MASON+5 LABORER
1 CARPENTER +2 MASON+6 LABORER
NOT TO BE INCLUDED SINCE THEY ARE ALREADY INCLUDED IN THE
ABOVE ITEMS
1 LA TO CONTROL & EMPTY THE MIXER & TO GUIDE THE SHUTE
2 LABORER @ FEED IN & 1 LABORER @ FEED OUT
1 LABORER @ FEED IN & 2 LABORER @ FEED OUT

2 CARPENTER +1 LABORER

4 MASON
4 MASON

2 MASON
2 MASON

1 MASON +1 LABORER
1 MASON +1 LABORER
1 MASON +1 LABORER
1 MASON +1 LABORER
1 MASON +1 LABORER
1 MASON +1 LABORER
1 MASON
2 MASON+1 LABORER
1MASON+1LABORER

1MASON+1LABORER
2MASON+4LABORER

2 TILER+2 LABORER
2 TILER+2 LABORER
2 TILER+2 LABORER
1 TILER+1 LABORER
1 TILER+1 LABORER
1 TILER+1 LABORER
2 TILER+2 LABORER

4 PAINTER+ 1 LABORER
4 PAINTER+ 1 LABORER
4 PAINTER+ 1 LABORER
4 PAINTER+ 1 LABORER

1 F/C CARPENTER + 1 LABORER

1 F/C CARPENTER + 1 LABORER


1 F/C CARPENTER + 1 LABORER

1 J. CARPENTER + 1 LABORER
1 J. CARPENTER + 1 LABORER
1 J. CARPENTER + 1 LABORER
1 J. CARPENTER + 1 LABORER
2 J. CARPENTER + 2 LABORER
2 J. CARPENTER + 1 LABORER
1 J. CARPENTER + 1 LABORER

2 ALM. WORKERS + 2 LABORER


2 ALM. WORKERS + 2 LABORER
2 ALM. WORKERS + 2 LABORER

1 MASON +1 LABORER
1 MASON +2 LABORER
1 MASON +2 LABORER
1 MASON + 1LABORER
1 MASON + 1LABORER
1 MASON + 1LABORER
1 MASON +2 LABORER
1 MASON +2 LABORER
PRODUCTION RATES - METRIC

PRODUCTION RATES ARE AVERAGE VALUES.


RATE MODIFICATIONS MAY BE NECESSARY TO MEET SPECIFIC PROJECT CONDITIONS.
USER ASSUMES ALL RESPOSIBILITY FROM USE AND/OR MODIFICATION OF THESE RATES.

Quantity Production
Work Item Unit
(User input) Rate

PERMANENT TRAFFIC CONTROL AND ILLUMINTATION SYSTEMS


Signs M2 33
Illuminaire Poles (Manufacture & Test) Days 120
Signal Conduit, Laying M 114
Signal Construction (1 Signal) Days 45
Signal Construction (2 Signals) Days 70
Signal Construction (3 Signals) Days 90
Signal Construction (4 Signals) Days 110
Signal Construction (5 Signals) Days 130
Signal Poles (Manufacture & Testing) Days 120
Traffic Signal Head Alterations Each 4
Traffic Signal Posts Each 4
Traffic Signal Posts, Relocate Existing Each 4
Category Total:

RIGHT-OF-WAY DEVELOPMENT AND CONTROL


Top Soil M3 268
Sodding M2 84
Trees, Evergreens Each 22
Trees, Seedling Each 2,000
Trees, Shade Each 17
Shrubs Each 300
Fence, Chain Link M 61
Fence, Woven Wire M 150
Mail Boxes (3 Day Minimum) Each 10
Category Total:
NS.
RATES.

Days
(Calculated)

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
Unit of
Resource ID Resource Name Resource Type Measure
259343_PNA 259343_PNA-Resources Labor
259343_PNA-L 259343_PNA-Labor Labor
259343-L-EWCR Earth Works Crew Labor
259343-L-CONC Concrete Crew Labor
259343-L-SFIX Steel Fixer Labor
259343-L-CMSN Concrete Mason Labor
259343-L-SHCP Shuttering Carpenter Labor
259343-L-SCFLD Scaffolder Labor
259343-L-CLAB Common Labor/Helper Labor
259343-L-WPCR Waterproofing Crew Labor
259343-L-SSCR Structural Steel Crew Labor
259343-L-BWCR Block Works Crew Labor
259343-L-BMSN Block Mason Labor
259343-L-EMCR MEP Crew Labor
259343-L-PLMB Plumber Labor
259343-L-PPFT Pipe Fitter Labor
259343-L-ACTC HVAC Technician Labor
259343-L-ELEC Electrician Labor
259343-L-DCTMN Ductman Labor
259343-L-LCCR LC Crew Labor
259343-L-LCEL LC Electrician Labor
259343-L-LCTC LC Technician Labor
259343-L-CSCR Conveyance System Crew Labor
259343-L-WWCR Wood Works Crew Labor
259343-L-FCCR Facade Crew Labor
259343-L-PLCR Plaster Crew Labor
259343-L-PMSN Plaster Mason Labor
259343-L-TLCR Tiling Crew Labor
259343-L-TLFX Tile Fixer Labor
259343-L-PNCR Painting Crew Labor
259343-L-PNTR Painter Labor
259343-L-SCCR Screed Crew Labor
259343-L-SFFL Soft Flooring Crew Labor
259343-L-CLCR Ceiling Crew Labor
259343-L-FNCP Finishing Carpenter Labor
259343-L-FNCR Fence Crew Labor
259343-L-RDCR Road Works Crew Labor
259343-L-HLCR Hardscape / Landscape Crew Labor
259343-L-JNCR Joinery Crew Labor
259343-L-SPCR Specialist Works Crew Labor
259343-L-EQOP Equipment Operator Labor

259343_PNA-M 259343_PNA-Materials Material


259343-M-EXC Earth Works - Excavation Material m3
259343-M-BFILL Earth Works - Backfill Material m3
259343-M-CONC Concrete Ready-Mix Material m3
259343-M-REINF Reinforcement Steel Material Tons
259343-M-BW CMU Blocks Material m2
259343-M-STEEL Structural Steel Material Tons
259343-M-HCS Hollow Core Slabs Material m2
259343-M-SCREED Screed Material m2
259343-M-TILE Ceramic/Porcelain/Quarry Tiles Material m2
259343-M-PLASTER Plaster Material m2
259343-M-STONE Marble/Granite/Stone Material m2
259343-M-SOFTFLR Carpet/Vinyl/Access Floor Material m2
259343-M-CEILING Suspended Ceiling Material m2
259343-M-PAINT Paint Material m2
259343-M-WOOD Wood / Leather / Fabric Material m2

259343_PNA-E 259343_PNA-Equipment Nonlabor


259343-E-EWEQ Earth Moving Equipment Nonlabor
259343-E-MBCR Mobile Crane Nonlabor
259343-E-DOZR Dozer Nonlabor
Role ID Role Name
259343

AMC-L-EWCR Total - Earth Works Crew


AMC-L-CONC Total - Concrete Crew
AMC-L-SFIX Total - Steel Fixer
AMC-L-CMSN Total - Concrete Mason
AMC-L-SHCP Total - Shuttering Carpenter
AMC-L-SCFLD Total - Scaffolder
AMC-L-CLAB Total - Common Labor/Helper
AMC-L-WPCR Total - Waterproofing Crew
AMC-L-SSCR Total - Structural Steel Crew
AMC-L-BWCR Total - Block Works Crew
AMC-L-BMSN Total - Block Mason
AMC-L-EMCR Total - MEP Crew
AMC-L-PLMB Total - Plumber
AMC-L-PPFT Total - Pipe Fitter
AMC-L-ACTC Total - HVAC Technician
AMC-L-ELEC Total - Electrician
AMC-L-DCTMN Total - Ductman
AMC-L-LCCR Total - LC Crew
AMC-L-LCEL Total - LC Electrician
AMC-L-LCTC Total - LC Technician
AMC-L-CSCR Total - Conveyance System Crew
AMC-L-WWCR Total - Wood Works Crew
AMC-L-FCCR Total - Facade Crew
AMC-L-PLCR Total - Plaster Crew
AMC-L-PMSN Total - Plaster Mason
AMC-L-TLCR Total - Tiling Crew
AMC-L-TLFX Total - Tile Fixer
AMC-L-PNCR Total - Painting Crew
AMC-L-PNTR Total - Painter
AMC-L-SCCR Total - Screed Crew
AMC-L-SFFL Total - Soft Flooring Crew
AMC-L-CLCR Total - Ceiling Crew
AMC-L-FNCP Total - Finishing Carpenter
AMC-L-FNCR Total - Fence Crew
AMC-L-RDCR Total - Road Works Crew
AMC-L-HLCR Total - Hardscape / Landscape Crew
AMC-L-JNCR Total - Joinery Crew
AMC-L-SPCR Total - Specialist Works Crew
AMC-L-EQOP Total - Equipment Operator
AMC-E-EWEQ Total - Earth Moving Equipment
AMC-E-MBCR Total - Mobile Crane
AMC-E-DOZR Total - Dozer
AMC STANDARD PRODUCTIVITY RATES

Division 2 Earthwork
Division 3 Concrete Work
Division 4 Mortar & Masonary
Division 5 Metals
Division 6
Division 7 Thermal & Moisture Protection
Division 8 Doors & Windows
Division 9 Finishes
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15 Mechanical Works
Division 16 Electrical Works
Annex-1 Airfield Ground Ligthing (AGL)
Annex-2 Ground Services Equipment (GSE)
Annex-3 PTB Bridge
Annex-4 Airside Pavement

Form No.: AMC-PMD-PL-017-0


Al Muhaidib Contracting Co. Projects Planning Department - PMD Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS

2.1 EARTHWORKS
2.1.1 Clearing & Grubbing M2 1,000 0.024
0.024 1.00 xxxxxx-E-DOZR Dozer
0.012 1.00 xxxxxx-L-EQOP Equipment Operator
0.012 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.1.2 Excavation - Bulk M3 160 0.100


0.100 1.00 xxxxxx-E-EXCVL Large Excavator CAT 320-330 0.8m3
0.100 1.00 xxxxxx-L-EQOP Equipment Operator

2.1.3 Excavation - Isolated Footings M3 25 0.960


0.960 1.00 xxxxxx-E-EXCVM Medium Excavator CAT 312-318 0.5m3
0.480 1.00 xxxxxx-L-EQOP Equipment Operator
0.480 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.1.4 Backfill & Compaction - Bulk M3 200 0.280


0.093 1.00 xxxxxx-E-DOZR Dozer
0.093 1.00 xxxxxx-E-CMPR Roller Compactor
0.093 1.00 xxxxxx-E-WTNKR Water Tanker
0.210 3.00 xxxxxx-L-EQOP Equipment Operator
0.070 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.1.5 Backfill & Compaction M3 25 1.600


0.800 1.00 xxxxxx-E-BKHO Backhoe Loader
0.800 1.00 xxxxxx-E-CMPP Plate Compactor
1.067 2.00 xxxxxx-L-EQOP Equipment Operator
0.533 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.2 SOIL TREATMENT


2.2.1 Anti-Termite Treatment M2 200 0.040
0.040 1.00 xxxxxx-L-TTAP TT Applicator

2.3 PAVING & SURFACING


STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS

2.3.1 Concrete Paving - 100mm thick M2 13 3.077


0.615 1.00 xxxxxx-L-CMSN Concrete Mason
0.615 1.00 xxxxxx-L-SFIX Steel Fixer
0.615 1.00 xxxxxx-L-SHCP Shuttering Carpenter
0.615 1.00 xxxxxx-L-SCFLD Scaffolder
0.615 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.3.2 Concrete Paving - 150mm thick M2 10 4.000


0.800 1.00 xxxxxx-L-CMSN Concrete Mason
0.800 1.00 xxxxxx-L-SFIX Steel Fixer
0.800 1.00 xxxxxx-L-SHCP Shuttering Carpenter
0.800 1.00 xxxxxx-L-SCFLD Scaffolder
0.800 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.3.3 Pedestrian/Handicap ramp M2 8 5.250


1.050 1.00 xxxxxx-L-CMSN Concrete Mason
1.050 1.00 xxxxxx-L-SFIX Steel Fixer
1.050 1.00 xxxxxx-L-SHCP Shuttering Carpenter
1.050 1.00 xxxxxx-L-SCFLD Scaffolder
1.050 1.00 xxxxxx-L-CLAB Common Labor/Helper

Precast concrete paving (Gray &


2.3.4 red colour) M2 30 1.067
0.533 2.00 xxxxxx-L-TMSN Tile Mason
0.533 2.00 xxxxxx-L-CLAB Common Labor/Helper

Interlocking concrete pavers


2.3.5 (400X400mm) M2 30 1.067
0.533 2.00 xxxxxx-L-TMSN Tile Mason
0.533 2.00 xxxxxx-L-CLAB Common Labor/Helper

Interlocking concrete pavers


2.3.6 (200X200X80mm) M2 30 1.067
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS
0.533 2.00 xxxxxx-L-TMSN Tile Mason
0.533 2.00 xxxxxx-L-CLAB Common Labor/Helper

Interlocking concrete pavers,


2.3.7 60mm thick M2 30 1.067
0.533 2.00 xxxxxx-L-TMSN Tile Mason
0.533 2.00 xxxxxx-L-CLAB Common Labor/Helper

2.4 ROCK FORMATION & BOULDERS

BOULDER SCHEDULE
2.4.1 1M3 =15% M3 500 0.080
0.020 1.00 xxxxxx-E-DTCK Dump Truck
0.020 1.00 xxxxxx-E-LDER Loader
0.020 1.00 xxxxxx-E-BHOE Backhoe
0.020 1.00 xxxxxx-L-EQOP Equipment Operator
0.080 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.4.2 0.25 M3 = 40% M3 500 0.080


0.020 1.00 xxxxxx-E-DTCK Dump Truck
0.020 1.00 xxxxxx-E-LDER Loader
0.020 1.00 xxxxxx-E-BHOE Backhoe
0.020 1.00 xxxxxx-L-EQOP Equipment Operator
0.080 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.5.3 < 0.25M3 = 45% M3 500 0.080


0.020 1.00 xxxxxx-E-DTCK Dump Truck
0.020 1.00 xxxxxx-E-LDER Loader
0.020 1.00 xxxxxx-E-BHOE Backhoe
0.020 1.00 xxxxxx-L-EQOP Equipment Operator
0.080 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.5 ROAD CURB


STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS
2.5.1 Precast concrete curb LM 70 0.229
0.114 1.00 xxxxxx-L-TMSN Tile Mason
0.114 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.6 MOWING EDGE

Concrete Mowing Edge ( Type


2.6.1 1/2) LM 70 0.229
0.114 1.00 xxxxxx-L-TMSN Tile Mason
0.114 1.00 xxxxxx-L-CLAB Common Labor/Helper

PRECAST CONCRETE WHEEL


2.7 STOPPERS

2.7.1 Precast Concrete Wheel Stoppers No. 64 0.500


0.250 1.00 xxxxxx-E-BLDR Backhoe/Loader
0.250 1.00 xxxxxx-L-EQOP Equipment Operator
0.125 1.00 xxxxxx-L-TMSN Tile Mason
0.125 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.8 PLAYING COURT

Playing court with required


2.8.1 finishing layers and colors M2 1 24.000
24.000 1.00 xxxxxx-L-SHCP Shuttering Carpenter
8.000 1.00 xxxxxx-L-TMSN Concrete Mason
8.000 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.9 STEEL CHAIN LINK FENCES

Galvanized steel fence 3000 mm


2.9.1 height LM 61 0.393
0.000 1.00 xxxxxx-L-SSCR Steel Structure Crew
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS
0.131 1.00 xxxxxx-L-WLDR Welder/Fabricator
0.131 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.10 PRECAST CONCRETE BOLLARD

Precast concrete bollard 400


2.10.1 mm Dia. And 1000 mm hieght No. 20 1.200
0.000 1.00 xxxxxx-L-SHCP Shuttering Carpenter
0.400 1.00 xxxxxx-L-TMSN Concrete Mason
0.400 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.11 SUNDRIES

2.11.1 Trash Bin No. 70 0.114


0.114 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.12 CONCRETE SEAT

Concrete seat with 100 X


2.12.1 100mm ceramic tile band No. 4 6.000
2.000 1.00 xxxxxx-L-SHCP Shuttering Carpenter
2.000 1.00 xxxxxx-L-TMSN Concrete Mason
2.000 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.13 GRAVEL

2.13.1 Gravel 50mm thickness M2 30 0.800


#DIV/0! 1.00 xxxxxx-E-BCAT Bobcat
0.267 1.00 xxxxxx-L-WLDR Welder/Fabricator
0.267 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.14 CONCRETE TREE - PALM TREE

2.14.1 Concrete Tree - Palm pit No. 17 1.412


1.412 1.00 xxxxxx-E-BCAT Bobcat
0.471 1.00 xxxxxx-L-SHCP Shuttering Carpenter
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 2 SITE WORKS
0.471 1.00 xxxxxx-L-CLAB Common Labor/Helper

2.15 PRECAST CONCRETE - KOISK

2.15.1 Precast concrete koisk No. 4 4.000


2.000 1.00 xxxxxx-L-SWKR Skilled Worker
2.000 1.00 xxxxxx-L-CLAB Common Labor/Helper
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 3 CONCRETE WORKS

3.1 CONCRETE (CAST IN PLACE)

Concrete Placing 1mh/m3 to 4 mh/m3


Blinding m3 2.000
Isolated Footings m3 2.250
Raft Footings m3 2.100
Columns m3 2.500
Shear Walls m3 3.500
Core Walls m3 3.500
Grade Beams m3 2.500
Slab on Grade m3 3.300
Isolated Beams m3 3.250
Suspended Slabs m3 3.300
Stairs m3 5.000
Parapet Walls / Upstands m3 4.000
Screed m3 6.000

Rebar Avergage 40hr/T


Blinding T 0.000
Isolated Footings T 35.000
Raft Footings T 35.000
Columns T 35.000
Shear Walls T 50.000
Core Walls T 50.000
Grade Beams T 30.000
Slab on Grade T 35.000
Isolated Beams T 40.000
Suspended Slabs T 40.000
Stairs T 50.000
Parapet Walls / Upstands T 40.000
Screed T 15.000

Formwork (Make, erect, strip, clean, and move)


Blinding m2 0.150
Isolated Footings m2 2.000
Raft Footings m2 1.250
Columns m2 3.500
Shear Walls m2 4.000
Core Walls m2 4.000
Grade Beams m2 2.100
Slab on Grade m2 1.000
Isolated Beams m2 5.000
Suspended Slabs m2 3.500
Stairs m2 4.850
Parapet Walls / Upstands m2 4.000

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 3 CONCRETE WORKS
Total Average Production m3 25.000 20 - 30 mh/m3

3.1.1 Blinding m3 2.286


1.340 1.00 xxxxxx-L-CMSN Concrete Mason Blinding: 2.1m x 2.1m x 0.05m
0.000 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: -
0.215 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 0.42m2 / 0.22 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
0.732 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.2 Isolated Footings m3 7.492


1.508 1.00 xxxxxx-L-CMSN Concrete Mason Footing : 4.5 m x 4.5 m x 0.75 m
3.465 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: 99 kg/m3
1.333 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 13.5 m2 / 15.19 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
1.187 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.3 Raft Footings m3 7.069


1.407 1.00 xxxxxx-L-CMSN Concrete Mason Raft: 1250m2 x 1.1m
4.725 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: 135 kg/m3
0.183 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 263.12m2 / 1347 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
0.754 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.4 Columns m3 28.750


1.675 1.00 xxxxxx-L-CMSN Concrete Mason Column: .8m x .8m x 3m
8.750 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 250 kg/m3
11.156 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 9.6m2 / 1.92 m3
1.969 1.00 xxxxxx-L-SCFLD Scaffolder
5.200 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.5 Shear Walls m3 24.360


2.345 1.00 xxxxxx-L-CMSN Concrete Mason Wall : 6.38 m x 0.8 m x 5.6 m
8.350 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 167 kg/m3
7.975 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 89.32 m2 / 28.56 m3
1.407 1.00 xxxxxx-L-SCFLD Scaffolder
4.282 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.6 Core Walls m3 25.640


2.345 1.00 xxxxxx-L-CMSN Concrete Mason Wall : 17.5m x 0.3 m x 3 m
8.350 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 167 kg/m3
8.791 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 54.3 m2 / 15.75 m3
1.551 1.00 xxxxxx-L-SCFLD Scaffolder
4.603 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.7 Grade Beams m3 18.610


1.675 1.00 xxxxxx-L-CMSN Concrete Mason Grade beam : 14 m x 0.4 m x 0.6 m

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 3 CONCRETE WORKS
5.610 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 187 kg/m3
7.875 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 16.8 m2 / 3.36 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
3.450 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.8 Slab on Grade m3 7.169


2.211 1.00 xxxxxx-L-CMSN Concrete Mason Slab on grade : 17625m2 x 0.2m
3.861 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 110.31 kg/m3
0.006 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 30 m2 / 3525 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
1.091 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.8 Isolated Beams m3 28.859


2.178 1.00 xxxxxx-L-CMSN Concrete Mason Drop beam : 7 m x 0.8 m x 1 m
6.680 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 167 kg/m3
9.228 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 21.2 m2 / 5.6 m3
4.969 1.00 xxxxxx-L-SCFLD Scaffolder
5.805 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.9 Suspended Slabs m3 21.883


2.211 1.00 xxxxxx-L-CMSN Concrete Mason Slab : 1000 m2 x 0.3 m
4.000 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 100 kg/m3
7.109 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork :1250 m2 / 300 m3
3.828 1.00 xxxxxx-L-SCFLD Scaffolder
4.735 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.10 Stairs m3 38.018


3.350 1.00 xxxxxx-L-CMSN Concrete Mason Stair: 55m3
11.500 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 230 kg/m3
16.139 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 244.02 m2 / 55 m3
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
7.030 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.11 Parapet Walls / Upstands m3 23.190


2.680 1.00 xxxxxx-L-CMSN Concrete Mason Wall : 6.38 m x 0.8 m x 5.6 m
6.680 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 167 kg/m3
7.975 1.00 xxxxxx-L-SHCP Shuttering Carpenter Formwork : 89.32 m2 / 28.56 m3
1.407 1.00 xxxxxx-L-SCFLD Scaffolder
4.447 1.00 xxxxxx-L-CLAB Common Labor/Helper

3.1.12 Screed m3 7.800


4.020 1.00 xxxxxx-L-CMSN Concrete Mason Screed:
1.800 1.00 xxxxxx-L-SFIX Steel Fixer Rebar Ratio: - 120 kg/m3
0.000 1.00 xxxxxx-L-SHCP Shuttering Carpenter
0.000 1.00 xxxxxx-L-SCFLD Scaffolder
1.980 1.00 xxxxxx-L-CLAB Common Labor/Helper

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 3 CONCRETE WORKS
3.2 CONCRETE (PRECAST)

3.2.1 Hollow Core Slabs m2 336 0.167 0.024


0.048 2.00 xxxxxx-L-CMSN Concrete Mason Plank Size: 7m x 1m
0.027 4.00 xxxxxx-L-CLAB Common Labor/Helper Hook Time: 10 min
0.004 1.00 xxxxxx-L-EQOP Equipment Operator Mobile Crane Erection
0.024 1.00 xxxxxx-E-MBCR Mobile Crane Average: 6 pieces / hour

3.2.2 Double Tee Slabs m2 630 0.127 0.013


0.038 3.00 xxxxxx-L-CMSN Concrete Mason Size: 15m x 3m x 0.3m
0.023 6.00 xxxxxx-L-CLAB Common Labor/Helper Hook Time: 30 min
0.002 1.00 xxxxxx-L-EQOP Equipment Operator Mobile Crane Erection
0.013 1.00 xxxxxx-E-MBCR Mobile Crane Average: 2 pieces / hour

3.2.3 Precast Column no 18 4.000 0.444


0.889 2.00 xxxxxx-L-CMSN Concrete Mason Height: 3.7m
0.593 6.00 xxxxxx-L-CLAB Common Labor/Helper Hook Time: 20 min
0.066 1.00 xxxxxx-L-EQOP Equipment Operator Mobile Crane Erection
0.444 1.00 xxxxxx-E-MBCR Mobile Crane Average: 3 pieces / hour

3.2.4 Precast Beam no 20 3.600 0.400


0.800 2.00 xxxxxx-L-CMSN Concrete Mason Size: 6m span
0.533 6.00 xxxxxx-L-CLAB Common Labor/Helper Hook Time: 20 min
0.059 1.00 xxxxxx-L-EQOP Equipment Operator Mobile Crane Erection
0.400 1.00 xxxxxx-E-MBCR Mobile Crane Average: 3 pieces / hour

3.2.5 Precast Concrete Cladding (Architectural) m2 80 0.900 0.100


0.800 8.00 xxxxxx-L-FCCR Façade Crew Size: 2.4m x 4.8m (upto 3T)
0.089 1.00 xxxxxx-L-EQOP Equipment Operator Erection Crew - 4 erectors
0.100 1.00 xxxxxx-E-MBCR Mobile Crane Alignment Crew - 4 workers
Average: 7 panels / day

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 4 MASONRY

4.1 MORTAR & MASONRY

4.1.1 10 cm Block m2 90 1.778


0.889 10.00 xxxxxx-L-BMSN Block Mason
0.889 10.00 xxxxxx-L-CLAB Common Labor/Helper

4.1.2 15cm Block m2 85 1.882


0.941 10.00 xxxxxx-L-BMSN Block Mason
0.941 10.00 xxxxxx-L-CLAB Common Labor/Helper

4.1.3 20cm Block m2 75 2.133


1.067 10.00 xxxxxx-L-BMSN Block Mason
1.067 10.00 xxxxxx-L-CLAB Common Labor/Helper

4.1.4 Solid Blocks m2 70 2.286


1.143 10.00 xxxxxx-L-BMSN Block Mason
1.143 10.00 xxxxxx-L-CLAB Common Labor/Helper

4.1.5 Cavity Wall with Insulation m2 42 3.810


1.905 10.00 xxxxxx-L-BMSN Block Mason
1.905 10.00 xxxxxx-L-CLAB Common Labor/Helper

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 5 METALS

5.1 METALS

5.1.1 Railing (Aluminium/Steel) LM 36 1.111


1.111 5.00 xxxxxx-L-SSCR Steel Structure Crew 3 Skilled, 1 Welder, 1 Helper

5.1.2 Space Frame m2 27 1.778


1.778 6.00 xxxxxx-L-SSCR Steel Structure Crew 4 Skilled, 1 Welder, 1 Helper

5.1.3 Expansion Joint Cover (aluminium, bronze or steel) LM 9.0 1.778


1.778 2.00 xxxxxx-L-CLAB Common Labor/Helper

5.1.4 Steel Ladders, Bolted to Concrete LM 13.0 2.462


2.462 4.00 xxxxxx-L-CLAB Common Labor/Helper

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 7 Thermal & Moisture Protection

7.1 DAMPROOFING

7.1.1 Bitominous Coating Below Grade, 1 coat m2 41 0.195


0.195 1.00 xxxxxx-L-CLAB Common Labor/Helper

7.1.2 Bituminous Coating Below Grade, 2 coat m2 31 0.258


0.258 1.00 xxxxxx-L-CLAB Common Labor/Helper

7.2 WATERPROOFING ON SLAB

7.2.1 Membrane waterproofing on slab, felt paper m2 172 0.279


0.279 6.00 xxxxxx-L-WPCR Waterproofing Crew 4 Waterpoofer, 2 Helpers

7.2.2 Membrane waterproofing on slab, glass fiber fabric m2 107 0.449


0.449 6.00 xxxxxx-L-WPCR Waterproofing Crew 4 Waterpoofer, 2 Helpers

7.3 WATERPROOFING ON ROOF DECK

7.3.1 Built-Up Roofing, Asphalt coating with Gravel m2 50 0.640


0.640 4.00 xxxxxx-L-WPCR Waterproofing Crew 2 Waterpoofer, 2 Helpers

7.3.1 Roof deck insulation,Extruded Polystyrene m2 111 0.072


0.072 1.00 xxxxxx-L-WPCR Waterproofing Crew

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 8 DOORS & WINDOWS

8.1 DOORS

8.1.1 Wooden Doors Frame EA 6 4.000


4.000 3.00 xxxxxx-L-JNCR Joinery Crew 2 Carpenters, 1 Helper

8.1.2 Steel Doors Frame EA 6 4.000


4.000 3.00 xxxxxx-L-JNCR Joinery Crew 1 Skilled, 1 Helper

8.1.3 Wooden Door Leaf & Hardware Set EA 3 5.333


5.333 2.00 xxxxxx-L-JNCR Joinery Crew 1 Skilled, 1 Helper

8.1.3 Metal Door Leaf & Hardware Set EA 3 5.333


5.333 2.00 xxxxxx-L-JNCR Joinery Crew 1 Skilled, 1 Helper

8.2 WINDOWS

8.2.1 Aluminium Windows with Glazing EA 9 2.667


2.667 3.00 xxxxxx-L-JNCR Joinery Crew 2 Skilled, 1 Helper

8.3 GLAZING WORKS

8.3.1 Glazed Partition Wall m2 16 2.000


2.000 4.00 xxxxxx-L-JNCR Joinery Crew 2 Skilled, 2 Helper

8.3.2 Glazed Curtain Wall (Façade) m2 2 4.000


4.000 1.00 xxxxxx-L-FCCR Façade Crew

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 9 FINISHES

9.2 CEILING WORKS

9.2.1 Suspended Gypsum Board Monolithic System m2 13 2.462


(including suspension, boards, taping, sanding) 1.231 2.00 xxxxxx-L-FNCP Finishing Carpenter
1.231 2.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.2 Suspended Gypsum Board Monolithic System - Curved m2 4 8.000


(including suspension, boards, taping, sanding) 4.000 2.00 xxxxxx-L-FNCP Finishing Carpenter
4.000 2.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.3 Suspended Demountable Metal Ceiling System m2 20 1.600


0.800 2.00 xxxxxx-L-FNCP Finishing Carpenter
0.800 2.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.4 Suspended Acoustic Fibre Board Tile Ceiling System m2 20 1.600


0.800 2.00 xxxxxx-L-FNCP Finishing Carpenter
0.800 2.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.5 Aluminum Strip Ceiling System m2 10 3.200


1.600 2.00 xxxxxx-L-FNCP Finishing Carpenter
1.600 2.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.6 Ceiling Suspension System - ONLY m2 12 1.333


0.667 1.00 xxxxxx-L-FNCP Finishing Carpenter
0.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.7 Ceiling Gypusm Board Installation - ONLY m2 15 1.067


(including boards, taping, sanding) 0.533 1.00 xxxxxx-L-FNCP Finishing Carpenter
0.533 1.00 xxxxxx-L-CLAB Common Labor/Helper

9.2.8 Ceiling Metal/Acoustic Installation - ONLY m2 60 0.267


0.133 1.00 xxxxxx-L-FNCP Finishing Carpenter
0.133 1.00 xxxxxx-L-CLAB Common Labor/Helper

Al Muhaidib Contracting Co. Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0
Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 15 MECHANICAL WORKS

15.3 HVAC

15.3.1 Duct, Galvanized Steel (Distribution Line) LM 13 1.231


0.615 1.00 xxxxxx-L-DCTMN Ductman Galvanized Steel Convert LM to KG
0.615 1.00 xxxxxx-L-CLAB Common Labor/Helper 1 LM = 12.51*(WxH) kg
W: Sheet's Width, H: Sheet's Hight
15.3.2 Duct, Galvanized Steel (Main Line) LM 6 2.667
1.333 1.00 xxxxxx-L-DCTMN Ductman
1.333 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.3 Duct Insulation LM 13 1.231


0.615 1.00 xxxxxx-L-DCTMN Ductman
0.615 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.4 Diffusers EA 8 1.000


1.000 1.00 xxxxxx-L-DCTMN Ductman

15.3.5 Grilles & Registers EA 17 0.471


0.471 1.00 xxxxxx-L-DCTMN Ductman

15.3.6 Fan Cool Unit (FCU) EA 4 6.000


2.000 1.00 xxxxxx-L-ACTC HVAC Technician
4.000 2.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.7 Air Handling Unit (AHU) EA 0.50 64.000 16.000


16.000 1.00 xxxxxx-E-MBCR Mobile Crane
16.000 1.00 xxxxxx-L-EQOP Equipment Operator
16.000 1.00 xxxxxx-L-ACTC HVAC Technician
32.000 2.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.8 Exhaust Fan EA 3 8.000


2.667 1.00 xxxxxx-L-ACTC HVAC Technician
2.667 1.00 xxxxxx-L-ELEC Electrician
2.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.9 VAV, CAV, Dampers EA 7 2.286


1.143 1.00 xxxxxx-L-ACTC HVAC Technician
1.143 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.10 Chilled Water Pipes LM 6 2.667


1.333 1.00 xxxxxx-L-PPFT Pipe Fitter
1.333 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.9 Chilled Water Valves (Gate, Isolation..etc) EA 3 5.333


2.667 1.00 xxxxxx-L-PPFT Pipe Fitter
2.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0


Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 15 MECHANICAL WORKS

15.3.9 Chilled Water Pipes' Insulation EA 12 1.333


0.667 1.00 xxxxxx-L-PPFT Pipe Fitter
0.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.9 Chillers Unit EA 0.33 145.455 24.242


24.242 1.00 xxxxxx-E-MBCR Mobile Crane
24.242 1.00 xxxxxx-L-EQOP Equipment Operator
48.485 2.00 xxxxxx-L-ACTC HVAC Technician
72.727 3.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.9 VAV, CAV, Dampers EA 7 2.286


1.143 1.00 xxxxxx-L-ACTC HVAC Technician
1.143 1.00 xxxxxx-L-CLAB Common Labor/Helper

15.3.9 A/C Split Unit EA 3 5.333


2.667 1.00 xxxxxx-L-ACTC HVAC Technician
2.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0


Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 16 ELECTRICAL WORKS

16.1 Cables & Accessories

16.1.1 Cable Trays LM 12 1.333


0.667 1.00 xxxxxx-L-ELEC Electrician
0.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.1.2 Cable Conduits/Trunks LM 18 0.889


0.444 1.00 xxxxxx-L-ELEC Electrician
0.444 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.1.3 Wire Pulling & Cable Laying LM 159 0.151


0.050 1.00 xxxxxx-L-ELEC Electrician
0.101 2.00 xxxxxx-L-CLAB Common Labor/Helper

16.1.4 Junction Boxes, Outlet Boxes EA 36 0.222


0.222 1.00 xxxxxx-L-ELEC Electrician

16.1.5 Grounding (rod/plate copper with excavation) EA 7 2.286


1.143 1.00 xxxxxx-L-ELEC Electrician
1.143 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.2 Electrical Fixtures

16.2.1 Lighting Fixtures EA 12 1.333


0.667 1.00 xxxxxx-L-ELEC Electrician
0.667 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.2.2 Fire Alarm Devices EA 20 0.800


0.400 1.00 xxxxxx-L-ELEC Electrician
0.400 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.2.3 Receptacles & Switches EA 18 0.444


0.444 1.00 xxxxxx-L-ELEC Electrician

16.2.4 Public Address System EA 1.5 10.667


5.333 1.00 xxxxxx-L-ELEC Electrician
5.333 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.3 Power Distribution & Transformers

16.3.1 Circuit Breakers EA 2 8.000 Wall Mounted


4.000 1.00 xxxxxx-L-ELEC Electrician
4.000 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.3.2 Panel Boards EA 0.7 22.857


11.429 1.00 xxxxxx-L-ELEC Electrician Wall Mounted

Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0


Form Rev Date: Dec 11, 2014
STANDARD PRODUCTIVITY TABLE

DAILY LABOR EQUIPMENT Crew Composition


NO. ACTIVITY DESCRIPTION UNIT AVERAGE PRODUCTIVITY PRODUCTIVITY REMARKS
PRODUCTION (mh/unit) (eh/unit) No. Trade ID Trade
DIVISION 16 ELECTRICAL WORKS
11.429 1.00 xxxxxx-L-CLAB Common Labor/Helper

16.3.3 Switchboards EA 0.5 48.000 Free Standing


16.000 1.00 xxxxxx-L-ELEC Electrician
32.000 2.00 xxxxxx-L-CLAB Common Labor/Helper

16.3.4 Dry Type Transformer, less than 150 kVA EA 1 24.000


8.000 1.00 xxxxxx-L-ELEC Electrician
16.000 2.00 xxxxxx-L-CLAB Common Labor/Helper

16.3.4 Dry Type Transformer,larger than 300 kVA EA 0.6 40.000


13.333 1.00 xxxxxx-L-ELEC Electrician
26.667 2.00 xxxxxx-L-CLAB Common Labor/Helper

16.4 ELECTRIC UTILITIES

16.4.1 Duct Bank LM 12 2.667 0.667


0.667 1.00 xxxxxx-E-EXCVM Medium Excavator
0.889 1.00 xxxxxx-L-EQOP Equipment Operator
0.889 1.00 xxxxxx-L-ELEC Electrician
0.889 1.00 xxxxxx-L-CLAB Common Labor/Helper

Projects Planning Department - PMD Form No.: AMC-PMD-PL-017-0


Form Rev Date: Dec 11, 2014