G 0.96 1.78
1.78
1 20 125 14.720 79 x 1 79 1162.880 2.467 2868.825
(Bottom of B/S)
10.20
1.78
A
2 20 125 3.560 79 x 2 158 562.480 2.467 1387.638
(Outer Wall) 1.78
D
3 20 125 8.560 79 x 1 79 676.240 2.467 1668.284
(Top of T/S) 8.56
E
4 20 125 10.700 79 x 1 79 845.300 2.467 2085.355
(Bottom of T/S) 0.25 10.20 0.25
F
5 20 125 10.700 79 x 1 79 845.300 2.467 2085.355 0.25
(Top of B/S) 10.20 0.25
H
6 12 150 10.004 74 x 4 296 2961.184 0.888 2629.531
(Top & B/Slab) 9.864 0.25
0.15
7 Chamfer Outer Wall 20 125 1.200 79 x 4 316 379.200 2.467 935.486
0.15 0.9
0.15
8 Chamfer Inner Wall 20 125 1.200 79 x 8 632 758.400 2.467 1870.973
0.15 0.9
0.25
B
9 20 150 3.100 66 x 2 132 409.200 2.467 1009.496 2.6
(Outer Walls Inner Side) 0.25
0.20
C
10 16 125 3.000 79 x 4 316 948.000 1.579 1496.892 2.6
(Inner Walls Both Side) 0.20
J
11 12 150 10.004 14 x 8 112 1120.448 0.888 994.958
(Walls Both Faces) 9.864 0.15
0.15
8
12 NJB 12 150 1.260 69 x 1 69 86.940 0.888 77.203 0.4
0.33 0.30
Page 2 of 2
M/S A.M.CONSTRUCTION CO / MISHAL SANIA (JV)
PETARO - SEHWAN PROJECT (N-55) SECTION-1 (64.000 Km)
PACKAGE-1A (20.000 Km)
BAR BENDING SCHEDULE
STRUCTURE: - BOX CULVERT AT CHAINAGE 11+610 3 X (3 X 2)m
9.804