PROJECT : CA Separation Date 15 Feb 2019
CONTRACT NO. : Tsujino Jiro Alfido B Indra S
JOB NO. : EB- 190044 Doc. No.

2020
No. Work Description Duration Remarks
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14
# Shutdown MRS

A GIS Installation (ABB & HVT)


Schedule 1
1 Centering & Leveling GIS BAY E11 Actual
day
Schedule 1
2 Docking GIS BAY E12 to GIS BAY E11 Actual
day Vacum & Filling Vacum & Filling Vacum & Filling
3 Docking GIS BAY E13 to GIS BAY E12
Schedule 1
day Cable Box E11 Cable Box E12 Cable Box E13
Actual
Schedule 8
4 Vacum & SF6 Filling Actual
day
Schedule 1
5 Setting Test Bushing E11 Actual
day
Schedule 1
6 Individual Test GIS BAY E11 Actual
day
Schedule 1
7 Individual Test GIS BAY E12 Actual
day
Schedule 1
8 Individual Test GIS BAY E13 Actual
day
Schedule 1
9 Main Contact Resistance Test Actual
day
Schedule 1
10 Preperation HV Test GIS E11 ~ E13 Actual
day
Schedule 1
11 HV Test GIS GIS E11 ~ E13 Actual
day
Schedule 2
12 Internal Wiring LCP to GIS Actual
day

B HV Cable Termination & HV Test (CSE & HVT)


Schedule 3
13 Termination Pfisterer HV cable at TR RS 1 Side Actual
day
Schedule 3
14 Termination Pfisterer HV cable at GIS BAY E11 Side Actual
day
Schedule 2
15 HV Test Cable From Bay E11 to RS 1 Actual
day
Schedule 3
16 Termination Pfisterer HV cable at GIS BAY E12 Side Actual
day
Schedule 3
17 Termination Pfisterer HV cable at GIS BAY E13 Side Actual
day
Schedule 3 Female
13 Termination Pfisterer HV cable at TR RS 3 Side Actual
day
Schedule 3
13 Termination Pfisterer HV cable at TR RS 2 Side Actual
day Female
18 Install Test Bushing
Schedule 1
day @TR RS 3 @TR RS 2
Actual
Schedule 1 @TR RS 2
19 Oil Filling HV Box TR Actual
day @TR RS 3
Schedule 1
18 HV Test Cable From Bay E12 to RS 3 Actual
day
Schedule 1
19 HV Test Cable From Bay E13 to RS 2 Actual
day

19 Connection Lead Wire


Schedule 1
day
@TR RS 3 @TR RS 2
Actual
Schedule
C Testing & commisioning at RS1 Side Actual
day
Schedule 1
20 Main Contact resistance Test 22 KV Actual
day
Schedule 1
21 HV Test Panel 22 KV Actual
day
Schedule 3
22 Function Test 22 kv Actual
day
Schedule 1
23 Visual Inspection Capacitor Actual
day
Schedule 5
24 Replacement Bus Pro Actual
day
Schedule 1
25 Integreted Test Siemens Actual
day
Schedule 2
26 Scada Test & CPP Actual
day
Schedule 3
27 Integreted Test MRS to PP Actual
day
Schedule 3
28 Testing RS 2 at Trafo Side Actual
day
Total : %
Progress Schedule : %
Actual Schedule : %
Revision Mark

No. Revision Date By


THIS SCHEDULE IS PROPERTY OF PT. MEIDEN ENGINEERING INDONESIA Doc.No. : MEI/FRM/CON/02-B.16
IT MUST NOT BE REPRODUCED, UTILIZED, COMMUNICATED OR PUBLISHED WITHOUT
EXPRESS PERMISSION

Schedules GIS MRS - 1 Month

Das könnte Ihnen auch gefallen