Sie sind auf Seite 1von 1

Material master --> BOM --> Resource (CRC1) --> Master Recipe (C201) -->

Prod.version (C223)

Process order (COR1)

Confirmation - COR6N operation wise confirmation, CORKb - Order confirmation

The business process


1,. When you create a process order control recipe will be created if the setting
done in CORN.
2.Co60- find PI sheet by giving the order number and enter the details in PI sheet
and complete
3. CO54-process message monitor-give the process order number,
it will display the process messages. Choose and click send
the message will be sent to the destination

These are following main T codes used in PP PI


For Process Industry.
Configuration

- Create Order Type for Process Order - T.Code CORN


- Create Order Type Dependent Parameter - T.Code COR4
- Production Scheduling Profile - CORY
- Specify Scheduling Parameter - OPUZ
- Create Control Recipe Destination - O10C
- Create Process Massage Destination - O13C (Optional)
- Create Process Instruction Catagory - O12C (Optional)

Das könnte Ihnen auch gefallen