Sie sind auf Seite 1von 6

PROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project objectives Date of Accomplishment / Issues / Rocommendations Signature of SPT &
& Targets Monitoring Status to Date Problems/ / Action Points Project Team Leader
Challenges
Ang Batang Sanay sa To reduce June to March SF2 High absenteeism PTA Orientation
Eskwelahan, Natututo at absenteeism rate rate among and Conference
Tumatalino(A.B.S.E.N.T) students at Balong
from 10% to 2% Anecdotal Record
NHS
among students Checking of GINA A. GASADAN
in 3 year Home Visitation with Attendance School Head
Documentation
Parental
Constructed Notification JONALYN B. DIVINA
Intervention Plan School Guidance
Home Visitation

Search for the


Model Class of the DONNA PASUDAG
Month SSG Adviser

Search for the


Best in
Attendance for LINO ANTHONY C.
the Month BANATAO
Teacher Representative
Monitoring and
Evaluation
PROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project objectives Date of Accomplishment / Issues / Rocommendations / Signature of SPT &
& Targets Monitoring Status to Date Problems/ Action Points Project Team Leader
Challenges
Reading Enhances To decrease cases June to March Post-Test Result with Poor reading level Conduct of PHIL-IRI
Ability and of frustration interpretation on PHIL among students Pre- and Post Test
Develops Oneself level from 64.28% IRI
(R.E.A.D.O) to 10% in three PTA Orientation and GINA A. GASADAN
years Constructed Conference School Head
Intervention Materials
Reading Program
Reading materials JONALYN B. DIVINA
Remedial Classes School Guidance
Bookshelves and Tables
Peer Teaching with
SSG Officers DONNA LEE L.
PASUDAG
Provision of PHIL-IRI Adviser
Classroom

Bookshelves and LAVARNIE B.


Tables AMBEGUIA
English Teacher
Re-establishment of
Reading Park
SUZZETTE LAMMAWIN
Monitoring and ComArts Adviser
Evaluation
ROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project Date of Accomplishment / Issues / Rocommendation Signature of SPT & Project
objectives & Monitoring Status to Date Problems/ s / Action Points Team Leader
Targets Challenges
Dropping Reduces To decrease June - March Home Visitation with The Dropout rate PTA Orientation
One’s dropout rate Documentation of the school for and Conferences
Potential…Diligence from 2% to 1% 2016-2018 is 2% GINA A. GASADAN
Raises One’s among students Constructed Home Visitation School Head
Performance in 3 years. Intervention Plan
(D.R.O.P.) Alternative
Delivery Mode/ JONALYN B. DIVINA
Intervention/Rem School Guidance
edial class

Counseling DONNA LEE L. PASUDAG


Service SSG Adviser

Enrolment
Campaign LINO ANTHONY C. BANATAO
Teacher Representative
Monitoring and
Evaluation
PROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project objectives Date of Accomplishment / Issues / Rocommendations Signature of SPT &
& Targets Monitoring Status to Date Problems/ / Action Points Project Team Leader
Challenges
It’s more fun in To increase Annual Functional Math Park Low Numerical Development of
Mathematics performance of skill among Grade Functional Math
grade 7-8 Submitted Activity 7 and 8 this Park GINA A. GASADAN
students on basic Request and school year 2019- School Head
mathematical Terminal Report 2020 Initiate review,
operations from reinforcement,
65% to 90% Result of the Test enhancement JOY L. PAGUEL
List of Poor Numeracy classes in numeracy Math Teacher
Performance
Math Olympiad
Action Plan

Active Participation of GLADYS T. TOMRAYEN


students Math Teacher
PROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project objectives Date of Accomplishment / Issues / Rocommendations / Signature of SPT &
& Targets Monitoring Status to Date Problems/ Action Points Project Team Leader
Challenges
Gulayan sa To improve Year Round Harvested vegetables 70% Planting of different
Paaralan Susi ng accomplishment accomplishment kinds of vegetables
Kalusugan from 70% to 95% Constructed Vermi- based on the GINA A. GASADAN
compost, ECR’s and action plan Implementation of School Head
Compost pits Organic Farming

Submitted Activity Construction of


Request Garden Fence
Terminal Report
Provision of additional SHARON P. CELIS
and water tanks and GP Coordinator
water pipes

Conduct
Benchmarking
PROJECT MONITORING REPORT FORM

Scheduled Dates of Monitoring:___________________________________________

Name of Project Project objectives & Targets Date of Accomplishment / Issues / Rocommendations / Signature of SPT &
Monitoring Status to Date Problems/ Action Points Project Team
Challenges Leader
Enhancing To improve Year Round -Accomplishment The School 1.Information
School Clean and accomplishment/performance Report Cleaning and Education
Green Program on clean and green Program -Additional Trash Bins Greening Campaign on: GINA A. GASADAN
from 70% to 90% -Construction of Program -Proper Waste School Head
accomplishment in 3 years addition ECR’s accomplishment Disposal/
-Additional signage’s is 70% Waste segregation,
-Enhanced Nursery -Global warming
-Terminal Report on /climate change
tree Planting Activity mitigation
-Constructed MRF LAVARNIE B.
-provisions of 2. Nursery & Tree AMBEGUIA
additional water tank Planting Activity Clean and Greed
-Vermi-culture Coordinator
-Terminal Report of 3. Construction of
the G and P MRF

4.Installation of
additional water GLORY L.
tank and pipes PANGKEW
Yes-O Adviser
5.Implementation of
organic Farming and
enhancement of
Gulayan sa Paaralan
Program

Das könnte Ihnen auch gefallen