LSP Timesheet

Date Thursday, January 02, 2020


Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Friday, January 03, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Monday, January 06, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Tuesday, January 07, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Wednesday, January 08, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Thursday, January 09, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Friday, January 10, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Monday, January 13, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Tuesday, January 14, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Wednesday, January 15, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS D - Other administrative works

9.00-10.00HRS D - Other administrative works

10.00-11.00HRS D - Other administrative works

11.00-12.00HRS D - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS D - Other administrative works

14.00-15.00HRS D - Other administrative works

15.00-16.00HRS D - Other administrative works

16.00-17.00HRS D - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Thursday, January 16, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Friday, January 17, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


OJT Training in Rayong (Thailand)
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Monday, January 20, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


DAY OFF
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Tuesday, January 21, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


DAY OFF
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Wednesday, January 22, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works

10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works


DAY OFF
13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works

15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Thursday, January 30, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works


Prepare material for training
10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works

13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works


Prepare material for training
15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Friday, January 31, 2020
Name Mr. Hoang Minh Ai
Position Process Engineer
Division Commissioning and Start-up

Work Details EPC Package Work Type Remark


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box) (Type in text)

8.00-9.00HRS C - Other administrative works

9.00-10.00HRS C - Other administrative works


Prepare material for training
10.00-11.00HRS C - Other administrative works

11.00-12.00HRS C - Other administrative works

13.00-14.00HRS C - Other administrative works

14.00-15.00HRS C - Other administrative works


Prepare material for training
15.00-16.00HRS C - Other administrative works

16.00-17.00HRS C - Other administrative works

Prepared by

Name: Mr. Hoang Minh Ai


Title: Process Engineer

Reviewed by Approved by

Name: Name:
Title: Title:
LSP Timesheet
Date Wednesday, December 04, 2019
Name Mr. Pholavit Thiebpattama
Position SPMU Director
Division SPMU

Work Details EPC Package Work Type


Time
(Type in text) (Select from Dropdown Box) (Selection from Dropdown Box)

8.00-9.00HRS Package A1 meeting A1 - Package Meeting

- Making acceptance, payment, contract finalization;


9.00-10.00HRS Review acceptance protocal & payment request A1 making payment and finalization of works construction
investment capital.
- Making acceptance, payment, contract finalization;
10.00-11.00HRS Review acceptance protocal & payment request B making payment and finalization of works construction
investment capital.
- Making acceptance, payment, contract finalization;
11.00-12.00HRS Review acceptance protocal & payment request C making payment and finalization of works construction
investment capital.
- Determining, updating and appraising the construction
13.00-14.00HRS Preparation for 1st piling G
package estimate;

Evaluation critieria for Construction jetty contractor


14.00-15.00HRS F - Selecting contractor in construction activities;
bidding

- Guaranteeing the working safety and environmental


15.00-16.00HRS Fire figting plan during construction meeting Common
hygiene of works;

16.00-17.00HRS HR Meeting Not applicable - Other administrative works

Reviewed by

Name:
Title:
Remark
(Type in text)

Prepared by

Name: Mr. Pholavit Thiebpattama


Title: SPMU Director

Approved by

Pichet Tangpanyarat
General Director
No. Group

1 The project management costs

2 The project management costs

3 The project management costs

4 The project management costs

5 The project management costs

6 The project management costs


7 The project management costs
8 The project management costs
9 The project management costs
10 The project management costs
11 The project management costs
12 The project management costs

13 The project management costs

14 The project management costs

15 The project management costs


16 The project management costs
17 The project management costs

18 The project management costs


19 The project management costs
20 The project management costs
21 The project management costs

22 The project management costs

23 The project management costs


24 The project management costs
25 The construction investment consultation costs
26 The construction investment consultation costs

27 The construction investment consultation costs

28 The construction investment consultation costs

29 The construction investment consultation costs

30 The construction investment consultation costs

31 The construction investment consultation costs

32 The construction investment consultation costs

33 The construction investment consultation costs

34 The construction investment consultation costs

35 The construction investment consultation costs

36 The construction investment consultation costs

37 The construction investment consultation costs

38 The construction investment consultation costs

39 The construction investment consultation costs

40 The construction investment consultation costs

41 The construction investment consultation costs

42 The construction investment consultation costs

43 The construction investment consultation costs

44 The construction investment consultation costs


45 The construction investment consultation costs

46 The construction investment consultation costs


47 Meeting
48 Meeting
49 Meeting
50 Meeting
51 Meeting
52
53
54 Other Admininistrative works

A1
A2
B
C
D
F
G
H/I
L
Commo
n
Not applicable

Working day
Day off
Holiday

General Director Office


Single Project Management Unit (SPMU)
Commissioning and Start-up
Health, Safety, Security & Environment (HSSE)
Human Resources
Commercial
Finance and Accounting
Details of Work Remark
- Making the pre-feasibility study report on construction investment (if any), report
on investment policy recommendations (if any), feasibility study report on
CIP
construction investment or report on economical - technical construction
investment;
- Performing duties of construction survey, supervision of construction survey; CIP
- Carrying out the competitive examination, selection of architectural design of
CIP
works or selection of plan for architectural design of works.
- Implementing the activities of compensation, assistance and relocation is the
CIP
responsibility of investor;
- Appraising the feasibility study report on construction investment or report on
CIP
economical - technical construction investment;
- Formulating, appraising, verifying and approving the technical design,
CIP
construction drawing design and construction estimate;
- Selecting contractor in construction activities; CIP
- Managing quality, volume, progress, constructional costs, construction contract; CIP
- Implementing and managing the works information system; CIP
- Guaranteeing the working safety and environmental hygiene of works; CIP
- Newly establishing or adjusting the construction norm of works; CIP
- Determining the works construction price and works construction price index; CIP
- Testing the construction works quality of state management agency upon
CIP
completion acceptance;
- Testing the quality of constructional material, structure or products and
CIP
equipment installed in the works;
- Inspecting the quality of works components, works items and works and testings
CIP
of specialized construction as required;
- Controlling construction investment costs; CIP
- Converting the works construction investment capital after completion
CIP
acceptance, handover and operation;
- Making acceptance, payment, contract finalization; making payment and
CIP
finalization of works construction investment capital.
- Monitoring and evaluating the works construction investment project; CIP
- Making acceptance and handover of works; CIP
- Implementing the commencement and inauguration (if any), propagation and
CIP
advertising;
- Determining, updating and appraising the construction package estimate; CIP

- Performing the management activities of competent state agencies (if any); CIP
- Performing other management activities. CIP
- Formulating the construction survey tasks, implementing the construction survey
CIP
and monitoring the construction survey;
- Making the pre-feasibility study report on construction investment (if any), report
on recommendation of investment policy (if any), feasibility study report on
CIP
construction investment or report on economical - technical construction
investment;
- Verifying the basic design and technological design of project; CIP
- Carrying out the competitive examination and selection of architectural design of
CIP
construction works;
- Performing the works construction design; CIP
- Verifying the total construction investment, works construction design and
CIP
construction estimate;
- Preparing and verifying the interest expression documents, pre-selection
documents, bidding documents, requirement and assessment docvolument of
CIP
interest expression documents, bid submission documents and recommendation
documents for contractor selection in constructional activities;

- Verifying the contractor selection result in constructional activities; CIP

- Monitoring the construction performance and equipment installation; CIP

- Making report on environmental impact assessment; CIP


- Formulating and verifying the construction norm, works construction price, works
CIP
construction price index;
- Verifying the traffic safety activities. CIP

- Applying the works information system; CIP

- Controlling the works construction investment costs; CIP

- Giving the advice on management of construction investment costs including the


preliminary total construction investment, construction estimate, price of
construction package, price of construction contract, construction norm and CIP
construction price, payment and finalization of construction contract, payment and
finalization of works construction investment capital and other activities;

- Giving the advice on project management (in case of consultant hiring); CIP

- Making testings on specialized construction; CIP


- Testing the quality of constructional materials, structure and products and
CIP
equipment installed in the works as required by the investor (if any);
- Inspecting the quality of works items and entire works; CIP
- Monitoring and assessing the works construction investment project (in case of
CIP
consultant hiring);
- Giving the advice on environmental surveying and monitoring; CIP
- Converting the works construction investment capital after completion
CIP
acceptance, handover and operation;
- Company Meeting CIP
- Sponsor Meeting CIP
- Package Meeting CIP
- HR Meeting Admin
- Other Meeting Admin

- Other administrative works Admin