MR. DHRUV WAZIRPUR INDUSTRIAL AREA DELHI. SUB:ESTIMATE FOR TOILT AT A 54
S.No. Description Qty. Unit Rate AMOUNT
A CIVIL WORK Construction of one floor of sclool block as marked in plan with high quality cement , steel . Rori , badarpur, with branded materials including kamdhenu steel , j.k laxmi cement . The work will be carried out with highly trained labour and masons within mentioned time frame. 2600.00 sqft. 1200.00 3120000.00 THIS INCLUDES: 1 Kota stone for floors 2 all iron door chaukhats and windows 3 wooden windows internal with galss exterior and interior paint of area 4 mentioned (paint will be apex for interior and distemper for exterior) all electrical works including electrical wires and required number of ceiling 5 lights and switchboards of good quality make.
Renovation of pricipal office , reception
area , management room, 2 vatika , fee collection room ,conference room B development ,computer lab rewiring
942.00 sqft 800.00 753600.00
C Vatika furniture for two vatica 5000.00 seats 30.00 100000.00 Principal office furnitue /management D furniture 45000 E Computer lab furniture 7000.00 8.00 56000.00 F Conference room furniture 50000.00 Auditorium sound insulation(floor & G walls) 4820.00 sqft 100.00 482000.00 Projector and screen and stage H decoration and design 35000.00 Air condition for auditoriums (with I installation)(cassate ac) 84000.00 6AC 500000.00 Air condition for prewings and J management(window ac's) 30000.00 6AC 180000.00 K Staircase glasswork for students safety 250000.00 L Front elevation design with paint 2472.00 65.00 160680.00 M. School signages as/ design 35000.00 N. Washrooms on second floor .Both male and female toilets. 200000.00 O. School paintwork(complete) 400000.00 P Garden area development 170000.00 GRAND TOTAL 6537280.00