ESTIMATE

DTD:10.01.2018

MR. DHRUV
WAZIRPUR INDUSTRIAL AREA
DELHI.
SUB:ESTIMATE FOR TOILT AT A 54

S.No. Description Qty. Unit Rate AMOUNT


A
CIVIL WORK
Construction of one floor of sclool block
as marked in plan with high quality
cement , steel . Rori , badarpur, with
branded materials including kamdhenu
steel , j.k laxmi cement . The work will be
carried out with highly trained labour and
masons within mentioned time frame. 2600.00 sqft. 1200.00 3120000.00
THIS INCLUDES:
1 Kota stone for floors
2 all iron door chaukhats and windows
3 wooden windows internal with galss
exterior and interior paint of area
4
mentioned
(paint will be apex for interior and
distemper for exterior)
all electrical works including electrical
wires and required number of ceiling
5
lights and switchboards of good quality
make.

Renovation of pricipal office , reception


area , management room, 2 vatika , fee
collection room ,conference room
B development ,computer lab rewiring

942.00 sqft 800.00 753600.00


C Vatika furniture for two vatica 5000.00 seats 30.00 100000.00
Principal office furnitue /management
D
furniture 45000
E Computer lab furniture 7000.00 8.00 56000.00
F Conference room furniture 50000.00
Auditorium sound insulation(floor &
G
walls) 4820.00 sqft 100.00 482000.00
Projector and screen and stage
H
decoration and design 35000.00
Air condition for auditoriums (with
I
installation)(cassate ac) 84000.00 6AC 500000.00
Air condition for prewings and
J
management(window ac's) 30000.00 6AC 180000.00
K Staircase glasswork for students safety 250000.00
L Front elevation design with paint 2472.00 65.00 160680.00
M. School signages as/ design 35000.00
N. Washrooms on second floor .Both male
and female toilets. 200000.00
O. School paintwork(complete) 400000.00
P Garden area development 170000.00
GRAND TOTAL 6537280.00