Sie sind auf Seite 1von 1

PT.

PAMAPERSADA NUSANTARA
DISTRICT ~ TOPB

CBR LAPANGAN
( AASHTO T- 193-172, ASTM D-4420-04 )

Sample No. 1 Date Of Sampling


Location STA 42+000 Date Of Testing 31 - 11 -2019
Work item Hauling Road Tested by Hauling Team

SWELLING OF SAMPLE
Date ~ ~ ~ ~ 4750
4700
Time 4650
~ ~ ~ ~ 4600
4550
Reading ( mm ) ~ ~ ~ ~ 4500
4450
4400
Height sample (mm) ~ ~ ~ ~ 4350
4300
4250
Swelling (%) ~ ~ ~ ~ 4200
4150
4100
4050
4000
3950
3900
3850
3800
CBR. DETERMINATION 3750
3700
Time Penetration Dial Gauge Reading 3650
3600
Loading ( lb ) 3550
(Min) ( in ) Of Load 3500
3450
3400
1/4 0,0125 10,0 299,9 3350
3300
3250
1/2 0,0250 15,0 449,9 3200
3150
22,0 659,8 3100
1 0,0500 3050
3000
1 1/2 0,0750 34,0 1019,7 2950
2900
2850
2 0,1000 40,0 1199,6 2800
2750
2700
3 0,1500 52,0 1559,5 2650
2600
2550
Load (lb)

4 0,2000 72,0 2159,3 2500


2450
2400
6 0,3000 102,0 3059,0 2350
2300
2250
8 0,4000 132,0 3958,7 2200
2150
2100
10 0,5000 148,0 4438,5 2050
2000
1950
1900
1850
1800
Calibration of Ring = 29,99 1750
1700
1650
WATER CONTENT Before 1600
1550
a Weight of Wet Soil + Tare (gr) 1500
1450
1400
b Weight of Dry Soil + Tare (gr) 1350
1300
1250
c Weight of Tare (gr) 1200
1150
1100
d Weight of Water (gr) 1050
1000
950
e Weight of Dry Soil (gr) 900
850
800
f Water Content (%) 750
700
g Average (%) 650
600
550
500
450
400
CBR .VALUE 350
300
250
200
150
100
0.1" 0.2" 50
0
1200 x 100% 2175 x 100% 0,0 0,1 0,2 0,3 0,4 0,5 0,6
3 x 1000 3 x 1500
Penetration (inc)
40,00 % 48,33 %

Chart of CBR Test

Das könnte Ihnen auch gefallen