GROUP 3 ‐ TRAINING GP Angkatan 1 Tahun 2018
Ujian Presentasi Group
Gedung Kementerian Kelautan dan Perikanan Yogyakarta
DATA
GROUP GROUP 3
Group Leader Agung Rudianto, IAI
Member Dr. Rachmawan Budiarto
Arifah Budiwati, ST.
Ar. Ayuko Setyo Adiyanti, ST., M.Sc
Stephen Tanugraha, ST.
TARGET (PLATINUM/GOLD/NO TARGET) Platinum
POINT ACHIEVED
ASD 17 15
EEC 26 20
WAC 21 18
MRC 14 11
IHC 10 8
BEM 13 13
TOTAL 101 85
Persentase 100% 84%
Level of Certification achieved PLATINUM
Operating Hour 10 hours
GFA (m2) 29,299.64
NLA (m2) 18,215.73
ANALISA FINANCE :
Baseline Invesement IDR 238,147,392,640.00
Additional Investment IDR 8,128,848,245.00
Approx additional Investment % 3.41%
Saving in cost / year IDR 1,158,038,410.00
Water IDR 29,020,365.00
Electricity IDR 1,097,336,572.00
PV
IDR 31,681,473.00
Payback period (year)
Gedung 7.02
ASD ( Appropriate Site Development )
TOTAL POINT ACHIEVEMENT 15
TOTAL INVESTASI TAMBAHAN IDR 965,767,450.00
ASD‐P : Area Dasar Hijau
POINT ACHIEVED P
Perlakuan
Total lahan milik gedung 5,506.50
Green area 1,317.23
Persentase Green area (% vs lahan milik gedung) 23.92%
Density of population (m2/person) 12
Investasi IDR ‐
ASD‐1 : Site Selection
POINT ACHIEVED 1
Site dilengkapi dengan 8
Perlakuan
prasarana
Investasi IDR ‐
ASD‐2: Site Selection
POINT ACHIEVED 2
Membuka akses pejalan kaki
Perlakuan
keluar tapak
Investasi IDR ‐
ASD‐3: Transportasi Umum
POINT ACHIEVED 2
Perlakuan Membuat jalur pedestrian
Investasi IDR ‐
ASD‐4: Fasilitas Pengguna Sepeda
POINT ACHIEVED 2
Menyediakan parkir sepeda
Perlakuan
dan ruang shower
Investasi IDR 18,000,000.00
ASD‐5: Lansekap Pada Lahan
POINT ACHIEVED 3
Pemilihan jenis vegetasi yang
Perlakuan sesuai dan dibudidayakan
secara lokal
Investasi IDR 28,700,000.00
ASD‐6: Iklim Mikro
POINT ACHIEVED 2
Pemakaian green roof dan
Perlakuan pemakaian material dengan
nilai albedo tinggi
Investasi IDR 889,374,650.00
ASD‐7: Manajemen Air Hujan
POINT ACHIEVED 3
Menyediakan sistem
Perlakuan
pemanenan air hujan (SPAH)
Investasi IDR 29,692,800.00
EEC (Energy Efficiency and Conservation)
TOTAL POINT ACHIEVEMENT 20
TOTAL INVESTASI TAMBAHAN IDR 6,137,104,160.00
PENGHEMATAN PER TAHUN IDR 1,097,336,572.00
EEC P1 ‐ Pemasangan Sub Meter
POINT ACHIEVED P
Pemasangan kWhMeter
dibedakan sesuai dengan
Perlakuan
kegunaan (HVAC, Lighting,
Others)
Investasi IDR 143,376,000.00
EEC P2 ‐ Perhitungan OTTV
POINT ACHIEVED P
Memakai kaca hemat energi
(8mm Asahimas Sunergy
Perlakuan
Green #2 + A12 + 6mm
Planibel)
Investasi IDR 2,495,078,160.00
EEC 1 ‐ Langkah Penghematan Energi
POINT ACHIEVED 12
Memakai Chiller COP 6.33
Perlakuan
dan lampu LED Panel 22.2W
Investasi IDR 2,674,250,000.00
EEC 2 ‐ Pencahayaan Alami
POINT ACHIEVED 4
Memakai kaca hijau transmisi
Perlakuan tinggi (transmission 42%) dan
lux sensor
Investasi IDR 302,400,000.00
EEC 3 ‐ Ventilasi
POINT ACHIEVED 0
Perlakuan tidak mengambil ventilasi
Investasi IDR ‐
EEC 4 ‐ Pengaruh Perubahan Iklim
POINT ACHIEVED 1
Perlakuan konversi energi ke CO2
Investasi IDR ‐
EEC 5 ‐ Energi Terbarukan dalam Tapak
POINT ACHIEVED 3
Perlakuan Memasang PV 20kWP
Investasi IDR 522,000,000.00
MRC (Material Resources Cycle)
TOTAL POINT ACHIEVEMENT 11
TOTAL INVESTASI TAMBAHAN IDR ‐
MRC P ‐ Refrigerant Fundamental
POINT ACHIEVED P
Tidak menggunakan chloro
fluoro‐carbon (CFC) sebagai
Perlakuan
refrigeran dan halon sebagai
bahan pemadam kebakaran
Investasi IDR ‐
MRC 1 ‐ Penggunaan Gedung dan Material Bekas
POINT ACHIEVED 0
Tidak menggunakan material
Perlakuan
bekas
Investasi IDR ‐
MRC 2 ‐ Material Melalui Proses Ramah Lingkungan
POINT ACHIEVED 2
menggunakan material daur
ulang sebesar 23.96%,
Perlakuan menggunakan material
bersertifikat ISO sebesar
68.62%
Investasi IDR ‐
MRC 3 ‐ Penggunaan Refrigerant Tanpa ODP
POINT ACHIEVED 2
Perlakuan Menggunakan bahan R134a
Investasi IDR ‐
MRC 4 ‐ Kayu Bersertifikat
POINT ACHIEVED 2
100% kayu bersertifikat FAKO
Perlakuan
& ekolabel
Investasi IDR ‐
MRC 5 ‐ Material Prafabrikasi
POINT ACHIEVED 3
Menggunakan material
Perlakuan
prefab sebesar 31.26%
Investasi IDR ‐
MRC 6 ‐ Material Regional
POINT ACHIEVED 2
Menggunakan material
dalam negeri sebesar 89%
Perlakuan
dan wilayah < 1.000km
sebesar 66.3%
Investasi IDR ‐
WAC (Water Conservation)
TOTAL POINT ACHIEVEMENT 18
TOTAL INVESTASI TAMBAHAN IDR 461,676,635.00
PENGHEMATAN PER TAHUN IDR 29,020,365.00
WAC P1 ‐ Meteran Air
POINT ACHIEVED P
Perlakuan Pemasangan Meteran Air ASAHI 5 titik
Investasi IDR 19,622,435.00
WAC P2 ‐ Perhitungan Penggunaan Air
POINT ACHIEVED P
Perlakuan Menghitung Menggunakan Water Calculator
Investasi 0
WAC 1 ‐ Pengurangan Penggunaan Air
POINT ACHIEVED 5
% Pengurangan Konsumsi Air 59.40%
Investasi IDR ‐
WAC 2 ‐ Fitur Air
POINT ACHIEVED 3
Perlakuan Menggunakan 100% Fitur air hemat air & eco friendly
Investasi IDR 29,160,000.00
WAC 3 ‐ Daur Ulang Air
POINT ACHIEVED 3
Menggunakan seluruh greywater untuk flushing &
Perlakuan
cooling tower
Investasi IDR 50,000,000.00
WAC 4 ‐ Sumber Air Alternatif
POINT ACHIEVED 2
Menggunakan air hujan & kondensasi AC, treatment
Perlakuan
menggunakan RO
Investasi IDR 24,900,000.00
WAC 5 ‐ Rainwater Harvesting
POINT ACHIEVED 3
Perlakuan Kapasitas rainwater >100% dari hujan, yakni 535%
Investasi IDR 180,000,000.00
WAC 6 ‐ Efisiensi Penggunaan Air Lansekap
POINT ACHIEVED 2
Perlakuan 100% lanscaping menggunakan greywater
penggunaan pop‐up sprinkler, moist sensor, dan timer
Investasi IDR 157,994,200.00
IHC (Indoor Health and Comfort)
TOTAL POINT ACHIEVEMENT 8
TOTAL INVESTASI TAMBAHAN IDR 31,200,000.00
IHC P ‐ Introduksi Udara Luar
POINT ACHIEVED P
Adanya lubang suppy dan
Perlakuan return untuk fresh air
sejumlah 6.106l/s/person
Investasi IDR ‐
IHC 1 ‐ Pemantauan Kadar CO2
POINT ACHIEVED 1
Perlakuan Memasang CO2 sensor
Investasi IDR 25,200,000.00
IHC 2 ‐ Kendali Asap Rokok di Lingkungan
POINT ACHIEVED 2
Memasang tanda dilarang
Perlakuan
merokok
Investasi IDR 6,000,000.00
IHC 3 ‐ Polutan Kimia
POINT ACHIEVED 2
Menggunakan cat yang
Perlakuan memiliki VOC rendah &
lampu non mercury
Investasi IDR ‐
IHC 4 ‐ Pemandangan Keluar Gedung
POINT ACHIEVED 1
Persentase pemandangan
Perlakuan
luar secara langsung 76%
Investasi IDR ‐
IHC 5 ‐ Kenyamanan Visual
POINT ACHIEVED 1
Lantai tipikal menggunakan
Perlakuan
350 lux
Investasi IDR ‐
IHC 6 ‐ Kenyamanan Termal
POINT ACHIEVED 1
Penetapan cooling load
Perlakuan dengan suhu 25C dan
kelembaban relative 60%
Investasi IDR ‐
IHC 7 ‐ Tingkat Kebisingan
POINT ACHIEVED 0
tidak dapat mengukur tingkat
Perlakuan
kebisingan
Investasi IDR ‐
BEM (Building Environment Management)
TOTAL POINT ACHIEVEMENT 13
TOTAL INVESTASI TAMBAHAN IDR 533,100,000.00
BEM P ‐ Dasar Pengelolaan Sampah
POINT ACHIEVED P
Perlakuan penyediaan tempat sampah
Investasi IDR 75,600,000.00
BEM 1 ‐ GP Sebagai Anggota Tim Proyek
POINT ACHIEVED 1
Perlakuan Melibatkan 1 team GP
Investasi IDR 120,000,000.00
BEM 2 ‐ Polusi Dari Aktivitas Konstruksi
POINT ACHIEVED 2
Pengadaan bio septic tank dan pengadaan perjanjian
Perlakuan kerjasama dengan pihak ketiga untuk mendaur ulang
dan membuang limbah ke TPA
Investasi IDR 44,000,000.00
BEM 3 ‐ Pengelolaan Sampah Tingkat Lanjut
POINT ACHIEVED 2
bekerja sama dengan pihak ketiga untuk mengolah
Perlakuan
sampah anorganik dan organik
Investasi IDR ‐
BEM 4 ‐ Sistem Komisioning yang Baik dan Benar
POINT ACHIEVED 3
Perlakuan Melakukan sistem testing dan komisioning
Investasi IDR 293,500,000.00
BEM 5 ‐ Penyerahan Data Bangunan Hijau
POINT ACHIEVED 2
menyerahkan data implementasi bangunan hijau dan
Perlakuan surat perjanjian penyerahan data implementasi oleh
owner
Investasi IDR ‐
BEM 6 ‐ Kesepakatan Dalam Melakukan Aktivitas Fit Out
POINT ACHIEVED 1
Perlakuan Surat perjanjian komitmen syarat fitout dari owner
Investasi IDR ‐
BEM 7 ‐ Survey Pengguna Gedung
POINT ACHIEVED 2
Perlakuan Melakukan survey kenyamanan pengguna
Investasi IDR ‐