CATHODIC
PROTECTION 13. MAIN SHEET PILE WALL SHALL BE EQUIPPED WITH
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
E SACRIFICIAL ANODE CL ANCHOR SHEET SACRIFICIAL CATHODIC PROTECTION SYSTEM AS PER UNDER THIS CONTRACT WITH RESPECT TO ANY OF E
ASSEMBLY PILE SPECIFICATION. CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
APPROX. EXISTING 14. PRE AUGURING SHALL BE CARRIED OUT FOR ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
ROCK LEVEL -5.0 THE PROPOSED SHEET PILE DRIVING BELOW -5m LAT. THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS
THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN
15. DRIVING OF SHEET PILE IS BASED ON THE ASSUMPTION ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.
TO BE DREDGED
THAT RECLAMATION (UP TO +3.5m LAT) WILL BE
BED ROCK ----------------------------- -----------
CARRIED OUT BEFORE DRIVING SHEET PILE WALL.
ABU DHABI PORTS DATE
1650
+1.476 MLHW
IN-SITU +1.170 MSL
REINFORCED © Copyright Abu Dhabi Ports (ADPorts), 2015. All Rights Reserved.
50 x 50 +0.941 MHLW
CONCRETE Contract No. & Project Title
CHAMFER
COPE BEAM
+4.00 (TYP.) +0.479 MLLW
CONTRACT No. 2101-232
H H
May 21, 2019 - 5:51pm
PRE AUGURED
0.00 LAT KHALIFA PORT EXPANSION -
SOUTH QUAY AND KP FORESHORE
TIDE BAR
AL TAWEELAH AREA
TOE LEVEL Independent Checking Engineer
-13.0 PILE CUT-OFF
1300
1300
LEVEL +3.20
Signature
CL MAIN SHEET
Contractor
PILE
J J
500
+2.70
300
HAT BLINDING
+2.309 CONCRETE Consultant
Halcrow International Partnership
P.O. Box 46024, Abu Dhabi U.A.E.
TIE-ROD www.jacobs.com
MHHW 003 AT 2800 CENTRES * TIE-ROD AT LEVEL +1.845 BETWEEN CHAINAGES CH. -1.856 TO CH. 1998.359 003
(TYP.)
K +1.845 +1.845 * K
* TIE-ROD AT LEVEL +1.835 BETWEEN CHAINAGES CH. 1998.359 TO CH. 3016.852
AND CH. -1.856 TO END
CHANNEL
WALING