STUDI KASUS 1
SOAL
Cost Comfort
Cost 1 5
Comfort 0.2 1
Safety 0.2 7
Durability 0.333333333 0.2
KRITERIA
Cost Comfort
Cost 1 5
Comfort 0.2 1
Safety 0.2 7
Durability 0.333333333 0.2
Total 1.733333333 13.2
Normalized
Cost Comfort
Cost 0.576923077 0.3787878788
Comfort 0.1153846154 0.0757575758
Safety 0.1153846154 0.5303030303
Durability 0.1923076922 0.0151515152
Total 1 1
Cost Comfort
Cost 1 5
Comfort 0.2 1
Safety 0.2 7
Durability 0.333333333 0.2
Hasil Kali Hasil Kali/Priority
2.6769903616 5.4182680225
0.6050383689 4.631370411
1.27300114 6.3043716356
0.9699574181 5.5947332001
MPOK 4
AL
Safety Durability
5 3
0.142857143 2
1 0.333333333
3 1
ERIA
Safety Durability
5 3
0.142857143 2
1 0.333333333
3 1
9.142857143 6.333333333
Normalized Matrix
Safety Durability Total Priority
0.546875 0.4736842106 1.9762701664 0.4940675416
0.015625 0.3157894737 0.5225566649 0.1306391662
0.109375 0.0526315789 0.8076942246 0.2019235562
0.328125 0.1578947369 0.6934789441 0.173369736
1 1 4
Kesimpulan dari hasil AHP adalah CR sebesar 0.55081 > dari pada 0.1 maka hasil tidak konsisten
Rank
1
4
2
3
aka hasil tidak konsisten
SOAL
Posisi Geografis
KRITERIA
Posisi Geografis
NORMALIZED MATRIX
Posisi Geografis
Posisi Geografis
Ketersediaan Bahan
Upah Buruh Luas Wilayah
Baku
5.00 3.00 5.00
1.00 0.25 4.00
4.00 1.00 5.00
0.25 0.20 1.00
2.00 1.00 2.00
12.25 5.45 17.00
Ketersediaan Bahan
Upah Buruh Luas Wilayah
Baku
0.41 0.55 0.29
0.08 0.05 0.24
0.33 0.18 0.29
0.02 0.04 0.06
0.16 0.18 0.12
1.00 1.00 1.00
Ketersediaan Bahan
Upah Buruh Luas Wilayah
Baku
5.00 3.00 5.00
1.00 0.25 4.00
4.00 1.00 5.00
0.25 0.20 1.00
2.00 1.00 2.00
Lamda Max CI
5.3788120711 0.0947030178
2.00
0.50
1.00
0.50
1.00
Kepadatan Penduduk
2.00
0.50
1.00
0.50
1.00
5.00
2.00 0.42
0.50 0.11
1.00 0.23
0.50 0.06
1.00 0.18
RI CR
1.1200 0.08456
0.1
adalah CR sebesar 0.08456 < dari pada 0.1 maka hasil konsisten
Rank
1
4
2
5
3