Title-
Contractor
Prepared By
STELLAR GEOTECH
SHOP NO-7, LEELA MANSION BUILDING
HAZRATGANJ, LUCKNOW 226001
1
ACKNOWLEDGEMENT
2
DATA-SHEET
3
INTRODUCTION AND METHOD OF TEST
On the basis of soil and site investigation it have been made to
perform INITIAL test for existing pile with help of loading
method as per IS 2911 part (IV) for the site – Construction of 4
Lane ROB in lieu of L-Xing No. 1-C(Span 1x25.08 Mtr Compsite
steel girder +2x2160 Mtr PSC girder) at KM 3.937 om MB-GZB
section and L-Xing No. 418 C(Span 1x47.500 Mtr composite girder)
at KM 1402.940 on MB-SRE section and construction of LHS in lieu
of L-Xing No. 1-C and 418-C near Moaradabad
4
PILE TEST REPORT
5
INITIAL PILE TEST CHART FOR AS PER TEST
PRESS
TIM URE LOAD(M AVG
E (Kg/cm T) DG-A DG-B DG-C DG-D SETTLEM
2) (mm) (mm) (mm) (mm) ENT (mm)
12-00 40 72.416 .58 .85 .56 1.07 .76
40 72.416 .59 .85 .66 1.09 .78
13-00 80 144.832 1.23 1.90 1.39 1.92 1.61
80 144.832 1.27 1.90 1.41 1.95 1.63
14-00 120 217.248 3.69 4.35 3.77 4.41 4.06
120 217.248 3.74 4.40 3.80 4.43 4.09
15-00 160 289.664 15.91 16.54 15.89 16.59 16.23
160 289.664 16.07 16.70 16.06 16.75 16.39
16-00 200 362.300 46.06 46.63 46.16 47.14 46.49
200 362.300 46.22 46.77 46.28 47.24 46.62
17-00 240 434.496 79.25 79.82 79.01 80.34 79.60
240 434.496 79.42 79.97 79.16 80.52 79.76
18-00 280 506.912 119.61 119.84 120.22 120.41 120.02
280 506.912 119.68 119.91 120.32 120.48 120.09
6
Construction of 4 Lane ROB in lieu of L-Xing No. 1-C(Span 1x25.08 Mtr
Composite steel girder +2x2160 Mtr PSC girder) at KM 3.937 om MB-GZB
section and L-Xing No. 418 C(Span 1x47.500 Mtr composite girder) at KM
1402.940 on MB-SRE section and construction of LHS in lieu of L-Xing No.
1-C and 418-C near Moaradabad
CONCLUSION:
According the test result of 1200 mm dia. 26 m long from Cut off safe
load of pile is given below :-
1st criteria = 2/3 x test load (upto 18 mm settlement as per
I S Code 2911 part IV 2013 second revision
= 2/3 x 289.666
= 193.11 ton
With the above remarks for the Designed Load 400 ton is not permitted
for the guarantee of the safe functioning of the recommended design
load.
Technical Adviser
Er. Rakesh Mishra
(M.Tech Structure)
Javed Hasan