Sie sind auf Seite 1von 3

Date: Dec.

19, 2006 LTC-LI-R2-019


CHECK LIST FOR DRY GAS SEAL CROSS SECTIONAL DRAWING
FOR CENTRIFUGAL COMPRESSORS
Rev.: 0 Page 1 of 3

CHECK LIST FOR DRY GAS SEAL CROSS SECTIONAL DRAWING

FOR CENTRIFUGAL COMPRESSOR PACKAGE

0 Preliminary Issue (IFIR) Dec.19, 06


MVP SBB TKG
Written Checked Approved Date
Rev. Description
By By By

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Dec. 19, 2006 LTC-LI-R2-019
CHECK LIST FOR DRY GAS SEAL CROSS SECTIONAL DRAWING
FOR CENTRIFUGAL COMPRESSORS
Rev.: 0 Page 2 of 3

CHECKER

LE/ DM
ENGR.
SR. DESCRIPTION REMARKS

1. General Check Points


Check the Project specific details like Title Block, Project Code,
1.1
Project Title, Client’s Name, Document Number, Revision Number,   
Project specific Equipment tags Number etc.
Check for Equipment Package Vendor’s approval stamp for sub-
1.2   
suppliers’ document.

1.3 Revision Mark / Revision identification for changes by vendor   

2 Technical Check Points - Dry Gas Seal Cross Sectional Drawing

Check the correctness of various technical details related to Dry


Gas Seal design data with respect to Seal Datasheet, Project
Specifications, and requisition & Agreed Deviation list :

i) Seal operating data,

ii) Direction of Rotation (Uni-Direction Seal are


very sensitive to direction of rotation)

2.1 iii) Seal axial & radial movement,   

iv) Balancing and test speed,

v) NACE applicability / compliance of Materials of


Construction including that of elastomers. For
Wet H2S service Kalrez is used.

vi) Losses in dry gas seal,

vii) Utility requirement etc.

2.2 Check overall dimensional details in seal drawing.   


2.3   
Check location and orientation of all ports in Seal Cartridge in line
with relevant P&ID :

i) Seal Gas Supply,

ii) Buffer Gas Connection,

iii) Separation Gas Connection,

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY
Date: Dec. 19, 2006 LTC-LI-R2-019
CHECK LIST FOR DRY GAS SEAL CROSS SECTIONAL DRAWING
FOR CENTRIFUGAL COMPRESSORS
Rev.: 0 Page 3 of 3

CHECKER

LE/ DM
ENGR.
SR. DESCRIPTION REMARKS

iv) And various Vents.

2.4 Check for dry gas seal cartridge weight   

Check for materials in ASTM code and consistency of component


part nos. indicated to Dry gas seal drawing Ensure that the material
2.5 of O-ring shall be in total compliance to operating gas as well seal   
gas i.e. sour gas may call for NACE applicability – Point 2.1 (v) also
referred.
Check that all connection size like Seal gas supply, Buffer gas
2.6 supply, Separation Gas supply and vent connections are covered as   
per Compressor supplier’s seal gas P&ID.
Check the expected & guaranteed leakage rates for dry gas seal at
Static and Dynamic Condition from Drive End (DE) and Non-Drive
2.7   
End at various speeds with respect to Seal gas datasheet &
Compressor Datasheet.
Signature

L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY L&T - CHIYODA PERSONNEL ONLY