Sie sind auf Seite 1von 1

DETAIL REQUIRED FOR CROWN INDUSTRIAL PARK (PORT QASIM)

SEWERAGE
WATER REQUIREMENT OF DISPOSAL OTHER USE OF ANY CHEMICAL
ELECTRICITY RO WATER PLANT IT REQUIREMENT
REQUIREMENT CCTV THAN NORMAL EFFECTED WATER
S. No. COMPANY NAME REQUIREMENT REQUIRED / REQUIRED /
PER GALLON PER REQUIRED / SEWERAGE IF YES
(KW) NOT REQUIRED NOT REQUIRED
MONTH NOT REQUIRED YES / NO (NAME OF CHEMICAL)
IF YES (WHICH)
Die Casting
1 HYSEN ENGINEERING WORKS (PVT) LTD. 200 KW 50 Ton/Month NO NO NO NO
Release agent
only Internet
sulfuric acid/Nitric
2 THREE GOLD ENGINEERING WORKS 200 KW 60Ton/Month No Required/no need Yes No
acid/Sodium hydroxide
IT
Consealed Wiring
Die Casting Surface Treatment
3 YUSHI MOTORS PAKISTAN (PVT) LTD. 300 KW 250 Ton / Month NO NO required. Camera
Release agent Chemical
will be installed
CHENGDU SHUANGLIU HUACHENG SEAL PAKISTAN
4 200 KW 150 Ton / Month NO NO NO NO NO
(PVT) LTD.

5 HUALONG MACHINERY PAKISTAN (PVT) LTD. 150KW 50 Ton/Month NO NO NO NO NO

6 ZHENLONG PAKISTAN (PVT) LTD. 300 KW 100 Ton/Month NO NO NO NO NO

7 XINDA CONTROL CABLE PAKISTAN (PVT) LTD. 100 KW 150 Ton / Month NO NO NO NO NO

8 YUCHI PAKISTAN (PVT) LTD. 100 KW 50 Ton/Month NO NO NO NO NO

9 CHONGQING SANJIANG CB PAKISTAN (PVT) LTD. 200 KW 100 Ton / Month NO NO NO NO NO

Das könnte Ihnen auch gefallen