SEWERAGE
WATER REQUIREMENT OF DISPOSAL OTHER USE OF ANY CHEMICAL
ELECTRICITY RO WATER PLANT IT REQUIREMENT
REQUIREMENT CCTV THAN NORMAL EFFECTED WATER
S. No. COMPANY NAME REQUIREMENT REQUIRED / REQUIRED /
PER GALLON PER REQUIRED / SEWERAGE IF YES
(KW) NOT REQUIRED NOT REQUIRED
MONTH NOT REQUIRED YES / NO (NAME OF CHEMICAL)
IF YES (WHICH)
Die Casting
1 HYSEN ENGINEERING WORKS (PVT) LTD. 200 KW 50 Ton/Month NO NO NO NO
Release agent
only Internet
sulfuric acid/Nitric
2 THREE GOLD ENGINEERING WORKS 200 KW 60Ton/Month No Required/no need Yes No
acid/Sodium hydroxide
IT
Consealed Wiring
Die Casting Surface Treatment
3 YUSHI MOTORS PAKISTAN (PVT) LTD. 300 KW 250 Ton / Month NO NO required. Camera
Release agent Chemical
will be installed
CHENGDU SHUANGLIU HUACHENG SEAL PAKISTAN
4 200 KW 150 Ton / Month NO NO NO NO NO
(PVT) LTD.
7 XINDA CONTROL CABLE PAKISTAN (PVT) LTD. 100 KW 150 Ton / Month NO NO NO NO NO