1.

The document created is the project charter, the contracts, the documentations
needed for requirements. And in this document contains the needs in the project
before, during and after. This includes the cost, the materials need in the project,
the schedule of the works and activities.
2. The contents in the quality work breakdown structures are the activities that were
sub divided to make the work easier and to distribute the activities properly and
compatible to the worker.
3. The purpose of the integrated project planning is to avoid the common mistakes
that can cause failure in the project. In the model that was presented it shows the
things that are important during the project planning. And it can also help because
it can be remembered easily.
Adamson University
900 San Marcelino Street, Ermita, Manila

College of Engineering

Department of Civil Engineering

CONSTRUCTION METHODS & PROJECT


MANAGEMENT

Assignment 1
Planning Process

Submitted by:
Educalane, Regina Faye E.
201411496

Submitted to:

Dr. Tomas Ucol-Ganiron Jr.


Course Adviser

DATE SUMITTED:

February 4, 2020
Project Concept Extensive analysis
Determination of accident data 

Funding Federal funds


Identification

Surveys
Preliminary
Engineering Complete
design work

Documentation
Documentation of of
Environmental the
the impact
impact of the
of the
Review project on the
environment

Solicit comments
and concerns
Public
Hearings/Informational
Local
Local residents and
Meetings residents and
Widening Road business
business people
know
people should
know what
should
is being
what is
proposed.
being
proposed.
Construction
Inspection of the
site 
Grade Inspection
Review of plans Changes of plan

Right of Way Negotiating with


the adjacent
Acquisition property owners

Contractors bid
on the work
Bid Letting
Work is let to the
lowest qualified
bidder

Site clearance
work

Heaps of
Construction material
selection

Equalization of
the road

Das könnte Ihnen auch gefallen