Perhitungan RAB Benglap
Perhitungan RAB Benglap
A UPAH
1 Pekerja L.01 OH 87,500.00 87,500.00
2 Tukang L.02 OH 125,650.00 125,650.00
3 Tukang Besi L.02 OH 125,650.00 125,650.00
4 Kepala Tukang L.03 OH 134,750.00 134,750.00
B BAHAN/MATERIAL
1 Kayu Kelas III Kg 2,500,000.00 - 2,500,000.00
2 Genteng Metal Lbr 34,150.00 - 34,150.00
3 Seng 7 ft lbr 42,500.00 - 42,500.00
4 Papan Lisplang 2x15 cm m' 30,000.00 - 30,000.00
5 Paku Lisplang bh 1,250.00 - 1,250.00
6 Paku segala ukuran kg 13,000.00 - 13,000.00
7 Baut Ø16mm bh - -
8 Batu Bata bh 750.00 - 750.00
9 Semen portland kg 1,600.00 - 1,600.00
10 Pasir m³ 191,500.00 - 191,500.00
11 Cat Tembok kg 25,000.00 - 25.00
HARGA ONGKOS JUMLAH
NO URAIAN KODE SATUAN SATUAN DASAR ANGKUT HARGA
(Rp) (Rp) (Rp)
DAFTAR HARGA UPAH DAN BAHAN
A UPAH
1 Pekerja L.01 OH 87,500.00 87,500.00
2 Tukang L.02 OH 125,650.00 125,650.00
3 Tukang Besi L.02 OH 125,650.00 125,650.00
4 Kepala Tukang L.03 OH 134,750.00 134,750.00
B BAHAN/MATERIAL
1 Besi Baja Ringan Canal C75 Kg 35,758.56 - 35,758.56
2 Genteng Metal Lbr 34,150.00 - 34,150.00
3 Papan Lisplang 2x15 cm m' 30,000.00 30,000.00
4 Paku Lisplang bh 1,250.00 1,250.00
HARGA ONGKOS JUMLAH
NO URAIAN KODE SATUAN SATUAN DASAR ANGKUT HARGA
(Rp) (Rp) (Rp)
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 87,500.00 26,250.00
2 Tukang batu L.02 OH 0.100 125,650.00 12,565.00
3 Kepala Tukang L.03 OH 0.010 125,650.00 1,256.50
2 Mandor L.04 OH 0.015 134,750.00 2,021.25
Jumlah Harga Tenaga Kerja 42,092.75
B. Bahan
1 Bata merah buah 50.000 750.00 37,500.00
2 Semen portland kg 11.500 1,600.00 18,400.00
3 Pasir pasang m³ 0.043 191,500.00 8,234.50
Jumlah Harga Bahan 55,900.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.150 87,500.00 13,125.00
2 Tukang L.02 OH 0.300 125,650.00 37,695.00
3 Kepala Tukang L.03 OH 0.030 125,650.00 3,769.50
2 Mandor L.04 OH 0.075 134,750.00 10,106.25
Jumlah Harga Tenaga Kerja 64,695.75
B. Bahan
1 Kayu kelas III 6x10cm m³ 0.015 2,500,000.00 38,500.00
2 Paku segala ukuran kg 0.240 13,000.00 3,120.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.100 87,500.00 8,750.00
2 Tukang L.02 OH 0.200 125,650.00 25,130.00
3 Kepala Tukang L.03 OH 0.020 125,650.00 2,513.00
2 Mandor L.04 OH 0.005 134,750.00 673.75
Jumlah Harga Tenaga Kerja 37,066.75
B. Bahan
1 Papan Lisplang 2x15 cm m' 0.011 30,000.00 324.00
2 Paku lisplank bh 0.100 1,250.00 125.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.150 87,500.00 13,125.00
2 Tukang L.02 OH 0.300 125,650.00 37,695.00
3 Kepala Tukang L.03 OH 0.030 125,650.00 3,769.50
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 Kayu kelas III 5 x 5 cm m³ 0.016 2,500,000.00 40,750.00
2 Paku segala ukuran kg 0.250 13,000.00 3,250.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.120 87,500.00 10,500.00
2 Tukang L.02 OH 0.060 125,650.00 7,539.00
3 Kepala Tukang L.03 OH 0.006 125,650.00 753.90
2 Mandor L.04 OH 0.006 134,750.00 808.50
Jumlah Harga Tenaga Kerja 19,601.40
B. Bahan
1 Seng 7 ft m' 0.011 - -
2 Paku segala ukuran kg 0.100 13,000.00 1,300.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 87,500.00 26,250.00
2 Tukang batu L.02 OH 0.100 125,650.00 12,565.00
3 Kepala Tukang L.03 OH 0.010 125,650.00 1,256.50
2 Mandor L.04 OH 0.015 134,750.00 2,021.25
Jumlah Harga Tenaga Kerja 42,092.75
B. Bahan
1 Semen portland M.14.b kg 4.450 1,600.00 7,120.00
2 Pasir pasang M.15 m³ 0.018 191,500.00 3,447.00
Jumlah Harga Bahan 10,567.00
C. Peralatan
Pekerjaan : Pemasangan 1 m2 atap rangka baja ringan canal dingin profil C75
Kode Analisa :
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Tukang Besi Profil L.02 OH 0.1700 125,650.00 21,360.50
2 Kepala Tukang Besi Profil L.03 OH 0.1170 134,750.00 15,765.75
Jumlah Harga Tenaga Kerja 37,126.25
B. Bahan
1 Baja ringan Canal dingin profil C75 kg 3.065 35,758.56 109,600.00
2 Genteng metal lbr 1.850 34,150.00 63,177.50
C. Peralatan
1 Peralatan % 10.00 172,777.50 17,277.75
A. Tenaga Kerja
1 Pekerja L.01 OH 0.1000 87,500.00 8,750.00
2 Tukang L.02 OH 0.2000 125,650.00 25,130.00
3 Kepala Tukang L.03 OH 0.0200 125,650.00 2,513.00
2 Mandor L.04 OH 0.0050 134,750.00 673.75
Jumlah Harga Tenaga Kerja 37,066.75
B. Bahan
1 Papan Lisplang 2x15 cm m' 0.011 30,000.00 324.00
2 Paku Lisplang bh 0.100 1,250.00 125.00
C. Peralatan
1 Peralatan % 10.00 449.00 44.90
A. Tenaga Kerja
1 Pekerja L.01 OH 0.1000 0.00 0.00
2 Tukang L.02 OH 0.2000 0.00 0.00
3 Kepala Tukang L.03 OH 0.0200 0.00 0.00
2 Mandor L.04 OH 0.0050 0.00 0.00
Jumlah Harga Tenaga Kerja 0.00
B. Bahan
1 - m' 0.011 - -
2 - bh 0.100 - -
C. Peralatan
1 Peralatan % 10.00 0.00 0.00
A. Tenaga Kerja
1 Pekerja L.01 OH 0.1000 0.00 0.00
2 Tukang L.02 OH 0.2000 0.00 0.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 - m' 0.011 - -
2 - bh 0.100 - -
C. Peralatan
1 Peralatan % 10.00 0.00 0.00
A. Tenaga Kerja
1 Pekerja L.01 OH 0.1000 0.00 0.00
2 Tukang L.02 OH 0.2000 0.00 0.00
3 Kepala Tukang L.03 OH 0.0200 0.00 0.00
2 Mandor L.04 OH 0.0050 0.00 0.00
Jumlah Harga Tenaga Kerja 0.00
B. Bahan
1 - m' 0.011 - -
2 - bh 0.100 - -
C. Peralatan
1 Peralatan % 10.00 0.00 0.00
HARGA SATUAN
NO URAIAN PEKERJAAN SAT. KODE (AHSP)
PEKERJAAN (HSP)
1 2 3 4 5
HARGA SATUAN
NO URAIAN PEKERJAAN SAT. KODE (AHSP)
PEKERJAAN (HSP)
1 2 3 4 5
1 Pemasangan 1 m2 atap rangka baja ringan canal dingin profil C75 M² Rp 249,899.65
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi - 1.00 Ls 475,500.00 475,500.00
2 Pembongkaran Atap Lama - 1.00 Ls 1,000,000.00 1,000,000.00
3 Papan Nama Proyek 0 1.00 Bh 200,000.00 200,000.00
REKAPITULASI
I. PEKERJAAN PERSIAPAN Rp 1,675,500.00
III. PEKERJAAN ATAP Rp -
III. PEKERJAAN LAIN - LAIN Rp 300,000.00
JUMLAH Rp 1,975,500.00
PPN 10% Rp 197,550.00
TOTAL NILAI Rp 2,173,050.00
DIBULATKAN Rp 2,173,000.00
Terbilang : Tujuh Puluh Dua Juta Rupiah
Rp 2,173,000.00
3% 600000000
18000000
582000000
PERINCIAN BIAYA PEKERJAAN MENURUT JENIS PENGELUARAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi - 1.00 Ls 475,500.00 475,500.00
2 Pembongkaran Atap Lama - 1.00 Ls 1,000,000.00 1,000,000.00
3 Papan Nama Proyek 1.00 Bh 200,000.00 200,000.00
REKAPITULASI
I. PEKERJAAN PERSIAPAN Rp 1,675,500.00
II. PEKERJAAN ATAP Rp 63,479,507.06
III. PEKERJAAN LAIN - LAIN Rp 300,000.00
JUMLAH Rp 65,455,007.06
PPN 10% Rp 6,545,500.71
TOTAL NILAI Rp 72,000,507.76
DIBULATKAN Rp 72,000,000.00
Terbilang : Tujuh Puluh Dua Juta Rupiah
Rp 72,000,000.00
3% 600000000
18000000
582000000
Pembersihan saluran
Panjang Lebar Tinggi Total
223 1.5 334.5
18 1 18
352.5
Plesteran
Dinding & lantai
Panjang Lebar Tinggi Total
18 1.856 1 33.408
223 1.3 1 289.9
Balok
Panjang Lebar Tinggi Total
0 0 0 0
112.5 0.54 1 60.75
384.058
B8 10 0.617 0 0 0 0
B9 10 0.617 0 1.12 0 0
B10 10 0.617 0 222.9 0 0
B11 10 0.617 0 0.94 0 0
B12 10 0.617 0 0 0 0
C1 8 0.395 0 0.38 0 0
C2 8 0.395 0 0.94 0 0
6090.02034666667
Bekisting
Panjang Lebar Jumlah
18 2.056 37.008 (dinding)
0 0 0 (balok)
223 3.6 802.8 (dinding)
112.5 0.6 67.5 (balok)
907.308 3x pemakaian #NAME?
533.71059 Rp 72,000,000.00
120 Rp 72,000,000.00
1486.67
112.5
222.9
-2.5