Beruflich Dokumente
Kultur Dokumente
Hardware Installation
For Subcontractors
For: ENTEL 3G Project
Ing.Rodrigo Rosa
After‐Sales Department
ZTE Bolivia S.R.L
CONTENTS
Introduction to ZTE ZXSDR BS8700/8900
Engineering preparation
BBU Installation
Installation of BC8910 outdoor cabinet
Indoor BBU Installation
Module Installation
Cable installation
Checking Installation
RRU installation
RRU Mounting
Cable Installation
Antenna Installation
It consists of two parts: BBU and RRU/RSU, which can be used either indoors
or outdoors. Such distributed base station architecture allows flexible site
selection, zero footprint, extended coverage, and baseband pool in
high-traffic scenarios.
数字中频 功放
Iub I ub 基带带 收发信单元
( 对外中频接口 和
接口 接口板 主控和
时时
理单元
为模为信号)
TRX … 低噪放 ……
射频拉频单元( RRU)
室内单元( BBU)
Uplink:192CE Physical Index
BPC Processing Downlink:192CE
Capability Downlink:43.2Mbps Volume:88.4×482.6×197mm(H×W×D)
Uplink:15Mbps Weight: 8.75kg (full configuration)
Typical Power Consumption :
Interface Index UMTS: 80W(1BPC), 115W(2BPC)
Abis/Iub Interface: GSM: 60W(12TRX), 75W(24TRX)
2*STM-1;16*E1/T1;1*FE/GE Power Supply: -48V DC
Electric/Optical(8 VLAN)
Temperature Range: -20℃~ 55℃
To RRU: 12*1.25Gbps CPRI optical interface
Humidity Range: 5%~95%
370mm
Receive Sensitivity: -113dBm[GSM]
-126.5dBm@sigle antenna[UMTS]
-129.2dBm@dual antenna[UMTS]
19
Frequency:
7m
m
Temperature Range:-40℃~+55℃
z All civil works of the equipment room should have been completed.
Including: concrete bases, equipment rooms, painting jobs, cabling
ladders, engineering holes and troughs, commercial AC input, lighting
systems, etc.
z The walls indoors should be dry enough; coated with fire-retardant
white lusterless paint or other fire-retardant materials.
z Indoor environment temperature: -25℃ ~ 55℃; Recommended
constant temperature: -10℃ ~ 50℃.
z Relative humidity: 5% ~ 100%; recommended constant temperature:
5% ~ 95%.
z Illumination of equipment room should include three complete sets of
illuminating systems: daily illumination, standby illumination and
emergency illumination.Avoid the direct exposure to sunlight.
z Outdoor environment temperature: -40℃ ~ 55℃.
z Relative humidity: 10% ~ 100%.
z Safe lightning protection measures should be adopted
z Grounding system should meet relevant requirement.
Transformer
Tower Equipment grounding net
grounding net grounding net
Preparation
Installing a cabinet
Installing cables
Waterproof treatment
End
4. Open the front door, and remove the bolts of the wooden pallet.
5. Demount the rear door panel, and remove the bolts of the wooden pallet.
Climate conditioner
(Fan/Heater)
Cooling/Heating
Control Panel Available expansion
space (4U)
AC breakers
ILP
ZXSDR BS8200
GU360 Base Band
Unit
DC breakers
ZXDU58 B121
Rectifier Modules Power solution
7 Bottom rung 2
6 Flat washer (M12) 8
5 Hex bolt (M12 × 25) 8
4 Flat washer (M10) 4
3 Hex bolt (M10 × 20) 4
2 Support 2
1 Top rung 2
No. Name Quantity Remarks
Start
Installation preparation
Install cabinet
Install cables
End
•Control and clock module CC is installed in slot 1 and slot 2. it supports one or
two CC
•Fabric switch module FS is installed in slot 3 and slot 4. it supports one or two
FS. When uses one FS, slot 4 can be used to configure TAM, BPC, or UBPG.
•Site alarm extender board SE is installed in slot 5. It can have one SE or no SE.
If no SE, slot 5 can be used to configure BPC or UBPG.
•Tower amplifier module TAM can be installed in slot 4, 5, 6, 7, or 8. Usually,
TAM is installed in slot 8 first, and then 4. If no TAM , slot 4, 5, 6, 7, and 8 can
be used to configure BPC or UBPG.
•Baseband processing board BPC/UBPG can be installed in slots 4, 5, 6, 7, 8.
•Site alarm module SA is installed in slot 13.
•Power module PM is installed in slot 14 and 15. It supports one or two PM.
AC Power
DC Power
Optical
Fiber
Optical
Fiber, UTP,
E1
© 2006, ZTE Corporation. All rights reserved.
Arrange DC and AC cables at PC8910 cabinet to keep them sepparated
Battery
Temperature
Sensors (move
to PC8910
cabinet)
DC Power cables
Smoke AC Power
(black to +, blue to -) Sensor cable cable
For single phase installations using 3 core cable, use brown for phase,
blue for neutral and black for ground
WARNING
RRU OLP
H2≤1/2*H
Antenna
RRU
Monitoring
Grounding cable
cable
DC Input DC Output
(from rectifier) (to RRU)
DC Output
(for RRU
Expanssion)
Cable Grounding
z DC cables requires to be grounded
using grounding kits at top of the
tower and before it reaches the
horizontal plane