Sie sind auf Seite 1von 5

CURRICULUM VITAE

Contact Info

Name : Agus Prianto


Nationality : Indonesia
Date of Birth : April 03, 1985
Contact No : +6281383306074
Email : agus.prianto@gmail.com

Qualification

• Electrical Engineering, University of 17 Agustus 1945 Jakarta


• Informatics Engineering, SMK Telkom Sandhy Putra Purwokerto

Summary
More than 10 years of experience in Telecom business, dedicated and hardworking in
any task and responsibilities given. Equip with knowledge on installation,
commissioning, integration and troubleshooting of 2G/3G/4G and Transmission radio
equipment. Has a good level of experience on network implementation activities such
as installation, commissioning, integration and troubleshooting. Has a good
experience on coordination, site quality assessment, partner assessment, supervision
of telecom implementation as well as the acceptance of the sites.
EXPERIENCES

Support for UNISEL


Des 2016 – Des 2017

- Support ZTE MPFS for Indosat Project Jabotabek Area

Support for XERINDO


Jan – Nov 2106

Equipment: RBS 6601, 6201, 6102, 6230, Minilink TN

- Support Ericsson for Modernization XL Project Central Java


- Support Ericsson for Implementation of UMTS 900 band XL Project Central Java
- Support ZTE MPFS Indosat project Jabotabek

RAN FLM Team Lead - Managed Services H3I


PT. Nokia Networks
15.11.2013 – 15.06.2015

Equipment: Nokia 2G RG30/3G RG40/LTE, Flexi Packet Hub 800, Tellabs 8660

Overall responsibility within the Managed Services Organization in relation to


Operations and Maintenance of the Network to maintain KPI and SLA compliances to
customer at the regional level. Corrective and Preventive Maintenance requirements
and also knows the challenge maintaining a high level of network and service quality.
Fully responsible to communicate within the Managed Service Organization on the
day to day Network update and changes that impact the Network to the Regional
Customer Team and to maintain the high level of service towards the end user.

Responsible to carry out all non centralised activities, primarily Maintenance &
Upgrades and includes functions: Telecom, and; non Telecom functions, e.g.
Electro/Mechanical & Site:

- Engagement with customer team for all operations related activities Management
- Responsible for all Field Teams and Subcontractors at their regions
- Responsible for Field Operations escalations
- Responsible for Field Operations Reporting
- Responsible for physical acceptance of Network
- Ensures Field Operations Tools capability needs
- Ensures Field Operations carried out by Subcontractor to maintain high Network
Availability
- Ensures Field Operations operational performance levels to SLA/OLA
applicable

2
- Supports 3rd Party SLA Management applicable
- Responsible for follow up of Site relocations
- Liaises with Field Operations subcontractors & 3rd parties
- Liaison for escalated Field Operations matters at Regional level
- Undertake special assignments to resolve Network Operations issues
- Supports Outage Reporting and takes management of follow-up actions
- Provides Field Operations weekly / monthly reports to Network Operations
Manager

Project Engineer - Telkomsel Project


PT. Nokia Siemens Networks
31.08.2009 – 31.07.2013

Equipment: Nokia 2G/3G FMR, Tellabs, RNC/BSC, IP MW (Ceragon,


MLTN Ericsson, SIAE, RTN Huawei)

Main Task :
Support Technical Implementation of Roll Out 2G and 3G Telkomsel Project

Secondary Task :

- Integration and Upgrade Node B with Native IP and Hybrid (ATM + Ethernet)
using Microwave IP and Metro E Networks
- Implementation of Node B with 2nd carrier activation
- Integration and Upgrade 2G NSN Base Station : Supreme and Flexi
- Configuring Tellabs 8660 series as NSN transmission collector (Backbone)
toward RNC for Ethernet and TDM Service, MPLS Service, Routing (OSPF,
RIP), and Troubleshooting
- Commisioning, Integration, and Troubleshooting other NSN Transmission
Equipment
- Support swap BTS and Node B for modernization
- Support Rehoming classic RNC2600 and Flexi BSC
- Support creating and modifying RNC parameters for IuB Control Plane and User
Plane (ATM CoCo, IP Node B, and IP Based Route) and DCN
- Upgrade Iub up to 50/100 Mbps using Metro-E
- Migration from E1/Native IP MW to Native IP Metro-E
- Upgrade 2nd and 3rd carrier
- Upgrade FSME (capacity)
- Manage TI partner to start survey, installation, Integration, and ATP on time as
NSN standard time line
- Create Change Request for additional works and any changed equipment/material
- Evaluate TSSR reports and approve As Plan Drawing for Node B & antenna
placement
- Reporting day to day TI activities
- Supporting & monitoring KPI
- Ensure QA processes are followed and project KPI target are achieved

3
- Request materials (SDR) for new site
- Support Partner for cross connection and integration

RAN Engineer - NSN Telkomsel Project


PT. Lemcon Networks
07.07.2008 – 30.06.2009

Equipment: Nokia 2G/3G, Microwave Transmission

- Supervise High capacity installation, cross connection and integration Nokia 2G


BTS
- Upgrade/Downgrade TRX Nokia 2G BTS Ultrasite
- Commissioning and integration Nokia 2G BTS Ultrasite
- Implementation of HSDPA Upgrades for 3G Telkomsel Network.
- Commissioning and integration Nokia 3G Node B Ultrasite/Flexi & Nokia
AXC/S-AXC.
- Troubleshooting Nokia 2G BTS, Nokia 3G Node B Ultrasite & Flexi and Nokia
Microwave Flexi hopper
- Technical support tasks including fault diagnosis and troubleshooting within own
competence area.
- Expand and prepare cross-connection E1 traffic for Node-B E1 capacity.
- Check quality HSDPA Throughput, including documentation report.
- Responsible for Re-Engineering / Re-Homing / Cutover / Links activity.

Transmission Engineer - Telkomsel Project


PT. Nera Indonesia
01.03.2008 – 30.06.2008

Equipment: Nera SDH Microwave

- Design and planning SDH Transmission Networks


- Site survey, study map, check LOS for Microwave Transmission Link
- Commissioning and Troubleshooting SDH Multiplexer and SDH Microwave
Radio Equipment
- Supervise SDH Multiplexer and SDH Microwave Radio Equipment installation

4
Technical Support Engineer - StarOne Project
PT. BPL Assigned to PT. Indosat
13.08.2007 – 12.02.2008

Equipment: CDMA 2001x

- Update information of Mobile Directory Number (MDN) StarOne both prepaid


and postpaid using One Access Enhanced (OAE)
- Update profile MDN which related with Home Location Register (HLR) in
Update Feature.
- Create, escalate and monitoring trouble ticket using CRM-LITE
- Check Intelligent Networks (IN) StarOne provided by ZTE Corp
- Register MDN prepaid, blocked/unblocked using tool Prepaid Information Center
(PRINCE)

Technical Staff - Telkom Project


PT. Sahid Megatronik Perkasa
31.08.2003 – 20.08.2007

Equipment: IP DSLAM, ADSL/ADSL2/ADSL2+/GSHDSL/VDSL, Cisco Catalyst,


Cisco Router

- Responsible for implement, install, maintain and troubleshooting the VPN-IP


MPLS network using Internet Protocol Digital Subscriber Line Access
Multiplexing (IP-DSLAM) including xDSL modem (ADSL, ADSL2, ADSL2+,
G.SHDSL, G.SHDSL.biz, VDSL) based on Internet Protocol (IP) and
Asyncronous TransferMode (ATM) for supporting PT. TELKOM with the new
product SPEEDY Broadband Access and Multimedia Services.
- Monitoring, provisioning and fault handling network IP-DSLAM using Network
Management System (NMS) based on Simple Network Management Protocol
(SNMP) with SNMPc v.7 product provided by Castle Rock and Element
Management System (EMS) provided by ZyXEL Corp.
- Handling project Multi Services Optical Access Network (MSOAN) in Divisi
Regional I Sumatera using the new technology Next Generation Network
(NGN) based on Internet Protocol (IP), interconnection to softswitch (SS).
- Install and commissioning Access Gateway over optical network as a transport to
deliver multiservices.
- Install Syncronous Digital Hierarcy (SDH), PDH, STM1 – STM16

Das könnte Ihnen auch gefallen