XJ350 Workover Rig


Operation and Maintenance Manual

Section II Technical parameters and performances


1. Technical parameters
Servicing depth 2-7/8’’ tubing 4000m

Workover depth 2-7/8’’ drill pipe 3200m

Maximum hook load 900KN

Maximum lifting speed of hook 1.38m/s

Mast mode Mast, two sections,

hydraulic raising/lowering

and extending/retracting

Mast clear height 31.7m

Max. hook load of mast 1020KN

Traveling system structure 4X3

Rope diameter ĭ26mm

Draw works mode Double drum with

MODEL 122

HYDROBRAKE

The rated power of drawworks 350kW (476HP)

The lifting gear of draw works 5 forward 5 reverse

Maximum pulling force of fast line 180kN

Hydraulic system Rated pressure MPa 14

Rated flow rate L/min 165

Oil tank capacity m3 1.0

Air pressure system Pressure MPa 0.833~0.93

Flow rate L/min 670

The capacity of main air cylinder 0.155

Power transmission mode Hydraulic mechanical

The rated power of engine HP/r/min 287kw/385HP/2100

Torque-converter mode c/w locking clutch,

hydraulic reducer
Page-16
XJ350 Workover Rig
Operation and Maintenance Manual

Torque factors of transmission 2.08

Transmission 5 forward 1 reverse

Chassis mode Special drilling rig chassis

Model of crown block TC90

Max. static load 900KN

Driving mode 10×8

Steering mode Hydraulic assist power

Steering axle Front axles 1s,2nd axle

Driving axle 1st, 2nd, 3rd and 4th axle

Driven axle 5th axle

Maximum speed km/h 63

Limited speed km/h 45

Minimum turning radius m 15

Operation Maximum wind speed km/h 110

environment Temperature oC -19~50

Relative humidity % 95

Overall size m Moving state 18.7X3.1X4.28

(L×W×H)

The weight of drilling rig Kg 46000


Page-17
XJ350 Workover Rig
Operation and Maintenance Manual

2. Loading characteristics curve of hook

Load characteristics curve of hook


໻䩽䋳㥋⡍ᗻ᳆㒓



1 gear hook load


ḷ໻䩽䋳㥋
 2 gear hook load
3 gear hook load
ḷ໻䩽䋳㥋
4 gear hook load

5 gear hook load
ḷ໻䩽䋳㥋
Lifting load of hook KN


ḷ໻䩽䋳㥋
໻䩽ᦤछ䋳㥋 kN

 ḷ໻䩽䋳㥋4










        
໻䩽ᦤछ䗳ᑺ m/s

Hook hoisting speed m/s


Page-18
XJ350 Workover Rig
Operation and Maintenance Manual

II. Components section

Section I Drawworks assembly


Drawworks assembly has a double drum structure. Main drum is used to run drilling tool,
lower casing and control bit pressure during drilling operations.
I. Technical parameters
List of technical parameters
Model JC-350

Type Double drum

Rated power 350kW(476HP)

Technical parameters Main drum (LEBUS Sand drum

rope groove)

Drum body Diameter mm ĭ429 ĭ324

Length mm 965 1016

Brake rim Diameter mm ĭ1070 ĭ1070

Width mm 310 210

Cooling method Forced water Pressure spraying

circulation cooled water cooled

Brake tape wrap angle 345° 345°

Diameter, wire line mm ĭ26 ĭ14.5

Wire line capacity m 500 3000

Pull of fast line KN 180 (2nd wrap) 115 (2nd wrap)

Clutch ATD-224H ATD-124H

(Pneumatic push (Pneumatic push

disc) disc)

Auxiliary brake MODEL 122

HYDROBRAKE