Project: SRHHL RC ETAP Page: 1

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 28 29

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 14 0 0 10 0 4 28

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: SRHHL AFTER COORDINATION

Output Filename: C:\ETAP 1600\SRHHTL AFTER COORDINATION\Normal Case.lfr


Project: SRHHL RC ETAP Page: 2

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: SRHHL RC ETAP Page: 3

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BRILLIANT BUS 0.433 1 100.0 0.0 0.191 0.119 0.191 0.119

Bus1 11.000 1 100.0 0.0

Bus4 11.000 1 100.0 0.0

Bus15 11.000 1 100.0 0.0

Bus18 11.000 1 100.0 0.0

Bus21 11.000 1 100.0 0.0

Bus27 6.600 1 100.0 0.0 0.478 0.201

Bus31 11.000 1 100.0 0.0 3.620 1.190 0.905 0.297

NEW HYPO CHILLER BUS 6.600 1 100.0 0.0 0.219 0.135 0.219 0.135

NEW HYPO HT BUS 11.000 1 100.0 0.0

NEW HYPO OG-1 BUS 0.433 1 100.0 0.0 0.558 0.346 0.558 0.346

NEW HYPO OG-2 BUS 0.433 1 100.0 0.0 0.478 0.296 0.478 0.296

NEW HYPO SAP3 BUS 11.000 1 100.0 0.0

NEW PMD BUS 0.433 1 100.0 0.0 0.319 0.198 0.319 0.198

OLD HYPO BUS 11.000 1 100.0 0.0

OLD HYPO CHILLER BUS 11.000 1 100.0 0.0

OLD HYPO OG-1 BUS 0.433 1 100.0 0.0 0.650 0.494 0.650 0.494

OLD HYPO OG-2 BUS 0.433 1 100.0 0.0 0.574 0.356 0.574 0.356

POWER PLANT BUS 11.000 1 100.0 0.0

POWER PLANT BUS-2 11.000 1 100.0 0.0

SAP2 BUS 0.433 1 100.0 0.0

SAP2 OLD HYPO BUS 11.000 1 100.0 0.0

SAP3 BUS 0.433 1 100.0 0.0

SRDK AND BRILLIANT BUS 11.000 1 100.0 0.0

SRDK BUS 0.433 1 100.0 0.0 0.191 0.119 0.191 0.119

STANDBY AUX BUS 0.433 1 100.0 0.0

TG PHARMA LT BUS 0.415 1 100.0 0.0 0.214 0.133 0.214 0.133

TGV PHARMA &NEW PMD 11.000 1 100.0 0.0


BUS
UNIT AUX BUS 0.433 1 100.0 0.0 0.956 0.593 0.956 0.593

Total Number of Buses: 29 8.448 4.178 5.255 3.084 0.000 0.000 0.000 0.000
Project: SRHHL RC ETAP Page: 4

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

POWER PLANT BUS 11.000 Swing 1 100.0 0.0

SAP2 BUS 0.433 Mvar/PF Control 1 100.0 0.0 2.380 0.782 95.0

SAP3 BUS 0.433 Mvar/PF Control 1 100.0 0.0 2.380 0.782 95.0

4.760 1.565
Project: SRHHL RC ETAP Page: 5

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Line/Cable Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

ACID PLANT &OLD HYPO 11NALS3 300 300.0 0.0 1 75 0.123870 0.103000
CABL
NEW HYPO CABLE 11NALS3 300 620.0 0.0 1 75 0.123870 0.103000

NEW PMD CABLE 11NALS3 70 480.0 0.0 1 75 0.540263 0.129000

OLD HYPO CHILLER 11NALS3 300 250.0 0.0 1 75 0.123870 0.103000


CABLE
SAP-2 CABLE 11NALS3 300 210.0 0.0 1 75 0.123870 0.103000

SAP-3 CABLE 11NALS3 300 350.0 0.0 1 75 0.123870 0.103000

SAP-3A CABLE 11NALS3 300 285.0 0.0 1 75 0.123870 0.103000

SRAAC CABLE2 11NALS3 300 650.0 0.0 1 75 0.123870 0.103000

SRDK & BRILLIANT Cable 11NALS3 300 350.0 0.0 1 75 0.123870 0.103000

TGV PHARMA &NEW PMD 11NALS3 120 700.0 0.0 1 75 0.308722 0.117000
CABLE

Line / Cable resistances are listed at the specified temperatures.


Project: SRHHL RC ETAP Page: 6

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

BRILLIANT TRF 3-Phase 0.500 11.000 0.433 4.96 1.50 0 0 0 0 0 4.9600 Dyn 0.000
NEW HYPO CHILLER TRF 3-Phase 1.000 11.000 6.600 6.21 3.50 0 0 0 0 0 6.2100 Dyn 0.000

NEW HYPO OG-1 TRF 3-Phase 2.500 11.000 0.433 6.50 6.00 0 0 0 0 0 6.5000 Dyn 0.000

NEW HYPO OG-2 TRF 3-Phase 1.600 11.000 0.433 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000

NEW PMD TRF 3-Phase 1.000 11.000 0.433 6.80 3.50 0 0 0 0 0 6.8000 Dyn 0.000

OLD HYPO CHILLER TRF 3-Phase 1.000 11.000 6.600 6.09 3.50 0 0 0 -5.000 0 6.0900 Dyn 0.000
OLD HYPO O/G-1 TRF 3-Phase 2.000 11.000 0.433 6.42 6.00 0 0 0 0 0 6.4200 Dyn 0.000

OLD HYPO OG-2 TRF 3-Phase 2.500 11.000 0.433 6.63 6.00 0 0 0 0 0 6.6320 Dyn 0.000

SAP -2 TRF 3-Phase 2.500 11.000 0.433 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
SAP-3 TRF 3-Phase 2.500 11.000 0.433 6.72 6.00 0 0 0 0 0 6.7200 Dyn 0.000

SRDK TRF 3-Phase 0.630 11.000 0.433 5.42 1.50 0 0 0 0 0 5.4200 Dyn 0.000
STANDBY AUX TRF 3-Phase 1.600 11.000 0.433 6.33 6.00 0 0 0 0 0 6.3300 Dyn 0.000

TGV PHARMA TRF 3-Phase 0.630 11.000 0.415 4.87 1.50 0 0 0 0 0 4.8700 Dyn 0.000
UNIT AUX TRF 3-Phase 2.500 11.000 0.433 6.55 6.00 0 0 0 -5.000 0 6.5500 Dyn 0.000
Project: SRHHL RC ETAP Page: 7

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

BRILLIANT TRF 2W XFMR SRDK AND BRILLIANT BUS BRILLIANT BUS 550.26 825.39 992.00

NEW HYPO CHILLER TRF 2W XFMR NEW HYPO SAP3 BUS NEW HYPO CHILLER BUS 170.60 597.11 621.00

NEW HYPO OG-1 TRF 2W XFMR NEW HYPO HT BUS NEW HYPO OG-1 BUS 42.74 256.46 260.00

NEW HYPO OG-2 TRF 2W XFMR NEW HYPO HT BUS NEW HYPO OG-2 BUS 64.22 385.31 390.63

NEW PMD TRF 2W XFMR Bus1 NEW PMD BUS 186.81 653.84 680.00

OLD HYPO CHILLER TRF 2W XFMR OLD HYPO CHILLER BUS Bus27 158.94 556.29 578.55

OLD HYPO O/G-1 TRF 2W XFMR OLD HYPO CHILLER BUS OLD HYPO OG-1 BUS 52.77 316.63 321.00

OLD HYPO OG-2 TRF 2W XFMR OLD HYPO BUS OLD HYPO OG-2 BUS 43.61 261.67 265.28

SAP -2 TRF 2W XFMR Bus18 SAP2 BUS 39.46 236.73 240.00

SAP-3 TRF 2W XFMR Bus21 SAP3 BUS 44.19 265.14 268.80

SRDK TRF 2W XFMR SRDK AND BRILLIANT BUS SRDK BUS 477.22 715.83 860.32

STANDBY AUX TRF 2W XFMR POWER PLANT BUS STANDBY AUX BUS 65.04 390.24 395.63

TGV PHARMA TRF 2W XFMR TGV PHARMA &NEW PMD TG PHARMA LT BUS 428.79 643.19 773.02
BUS
UNIT AUX TRF 2W XFMR POWER PLANT BUS UNIT AUX BUS 40.92 245.51 248.90

ACID PLANT &OLD HYPO Cable POWER PLANT BUS SAP2 OLD HYPO BUS 3.07 2.55 3.99
CABL
NEW HYPO CABLE Cable Bus15 NEW HYPO HT BUS 6.35 5.28 8.25

NEW PMD CABLE Cable TGV PHARMA &NEW PMD Bus1 21.43 5.12 22.03
BUS
OLD HYPO CHILLER CABLE Cable OLD HYPO BUS OLD HYPO CHILLER BUS 2.56 2.13 3.33

SAP-2 CABLE Cable SAP2 OLD HYPO BUS Bus18 2.15 1.79 2.80

SAP-3 CABLE Cable Bus15 NEW HYPO SAP3 BUS 3.58 2.98 4.66

SAP-3A CABLE Cable NEW HYPO SAP3 BUS Bus21 2.92 2.43 3.79

SRAAC CABLE2 Cable Bus31 POWER PLANT BUS-2 6.65 5.53 8.65

SRDK & BRILLIANT Cable Cable Bus4 SRDK AND BRILLIANT BUS 3.58 2.98 4.66

TGV PHARMA &NEW PMD Cable Bus4 TGV PHARMA &NEW PMD 17.86 6.77 19.10
CABLE BUS
ACID PLANT & OLDHYPO Tie Breakr SAP2 OLD HYPO BUS OLD HYPO BUS
CB
EXPORT CB (SYNC) Tie Breakr POWER PLANT BUS-2 POWER PLANT BUS

NEW HYPO & SAP3 CB Tie Breakr POWER PLANT BUS Bus15

SRDK & BRILLIANT CB Tie Breakr POWER PLANT BUS Bus4


Project: SRHHL RC ETAP Page: 8

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BRILLIANT BUS 0.433 95.876 -1.1 0 0 0.367 0.227 SRDK AND BRILLIANT -0.367 -0.227 600.5 85.0
BUS
Bus1 11.000 99.611 0.1 0 0 0 0 TGV PHARMA &NEW PMD -0.622 -0.416 39.4 83.1
BUS
NEW PMD BUS 0.622 0.416 39.4 83.1

Bus4 11.000 100.000 0.0 0 0 0 0 SRDK AND BRILLIANT 0.757 0.488 47.3 84.1
BUS
TGV PHARMA &NEW PMD 1.048 0.688 65.8 83.6
BUS
POWER PLANT BUS -1.806 -1.176 113.1 83.8

Bus15 11.000 100.000 0.0 0 0 0 0 NEW HYPO HT BUS 2.034 1.345 128.0 83.4

NEW HYPO SAP3 BUS -1.919 -0.342 102.3 98.4

POWER PLANT BUS -0.115 -1.002 53.0 11.4

Bus18 11.000 100.012 0.0 0 0 0 0 SAP2 OLD HYPO BUS 2.356 0.641 128.2 96.5

SAP2 BUS -2.356 -0.641 128.2 96.5

Bus21 11.000 100.163 0.0 0 0 0 0 NEW HYPO SAP3 BUS 2.354 0.625 127.6 96.6

SAP3 BUS -2.354 -0.625 127.6 96.6

Bus27 6.600 103.191 -1.3 0 0 0.478 0.201 OLD HYPO CHILLER BUS -0.478 -0.201 44.0 92.2

Bus31 11.000 99.616 -0.1 0 0 4.518 1.485 POWER PLANT BUS-2 -4.518 -1.485 250.6 95.0

NEW HYPO CHILLER 6.600 97.691 -1.2 0 0 0.427 0.265 NEW HYPO SAP3 BUS -0.427 -0.265 45.0 85.0
BUS
NEW HYPO HT BUS 11.000 99.800 0.0 0 0 0 0 Bus15 -2.030 -1.342 128.0 83.4

NEW HYPO OG-1 BUS 1.096 0.719 68.9 83.6

NEW HYPO OG-2 BUS 0.935 0.623 59.1 83.2

NEW HYPO OG-1 BUS 0.433 97.516 -1.5 0 0 1.088 0.674 NEW HYPO HT BUS -1.088 -0.674 1750.6 85.0

NEW HYPO OG-2 BUS 0.433 96.846 -1.9 0 0 0.927 0.574 NEW HYPO HT BUS -0.927 -0.574 1500.8 85.0

NEW HYPO SAP3 BUS 11.000 100.079 0.0 0 0 0 0 Bus15 1.920 0.343 102.3 98.4

Bus21 -2.352 -0.624 127.6 96.7

NEW HYPO CHILLER BUS 0.432 0.281 27.0 83.8

NEW PMD BUS 0.433 95.774 -1.9 0 0 0.611 0.379 Bus1 -0.611 -0.379 1000.9 85.0

OLD HYPO BUS 11.000 99.950 0.0 0 0 0 0 OLD HYPO CHILLER BUS 1.746 1.251 112.8 81.3

OLD HYPO OG-2 BUS 1.128 0.742 70.9 83.5

SAP2 OLD HYPO BUS -2.874 -1.992 183.6 82.2

OLD HYPO CHILLER BUS 11.000 99.878 0.0 0 0 0 0 OLD HYPO BUS -1.745 -1.250 112.8 81.3

Bus27 0.482 0.216 27.8 91.3 -5.000

OLD HYPO OG-1 BUS 1.263 1.033 85.8 77.4

OLD HYPO OG-1 BUS 0.433 95.997 -2.1 0 0 1.249 0.949 OLD HYPO CHILLER BUS -1.249 -0.949 2178.7 79.6

OLD HYPO OG-2 BUS 0.433 97.551 -1.5 0 0 1.120 0.694 OLD HYPO BUS -1.120 -0.694 1800.6 85.0

* POWER PLANT BUS 11.000 100.000 0.0 8.932 6.360 0 0 SAP2 OLD HYPO BUS 0.520 1.353 76.1 35.9
Project: SRHHL RC ETAP Page: 9

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

STANDBY AUX BUS 0.000 0.000 0.0 0.0

UNIT AUX BUS 1.959 1.331 124.3 82.7 -5.000

POWER PLANT BUS-2 4.533 1.498 250.6 95.0

Bus15 0.115 1.002 53.0 11.4

Bus4 1.806 1.176 113.1 83.8

POWER PLANT BUS-2 11.000 100.000 0.0 0 0 0 0 Bus31 4.533 1.498 250.6 95.0

POWER PLANT BUS -4.533 -1.498 250.6 95.0

SAP2 BUS 0.433 102.597 3.0 2.380 0.782 0 0 Bus18 2.380 0.782 3255.9 95.0

SAP2 OLD HYPO BUS 11.000 99.950 0.0 0 0 0 0 POWER PLANT BUS -0.519 -1.352 76.1 35.8

Bus18 -2.355 -0.640 128.2 96.5

OLD HYPO BUS 2.874 1.992 183.6 82.2

SAP3 BUS 0.433 103.029 3.4 2.380 0.782 0 0 Bus21 2.380 0.782 3242.2 95.0

SRDK AND BRILLIANT 11.000 99.958 0.0 0 0 0 0 Bus4 -0.757 -0.487 47.3 84.1
BUS
BRILLIANT BUS 0.378 0.244 23.6 84.0

SRDK BUS 0.379 0.243 23.6 84.1

SRDK BUS 0.433 96.421 -0.9 0 0 0.369 0.229 SRDK AND BRILLIANT -0.369 -0.229 600.4 85.0
BUS
STANDBY AUX BUS 0.433 100.000 0.0 0 0 0 0 POWER PLANT BUS 0.000 0.000 0.0 0.0

TG PHARMA LT BUS 0.415 96.212 -0.9 0 0 0.412 0.255 TGV PHARMA &NEW PMD -0.412 -0.255 700.5 85.0
BUS
TGV PHARMA &NEW 11.000 99.766 0.0 0 0 0 0 Bus1 0.623 0.416 39.4 83.2
PMD BUS
Bus4 -1.046 -0.687 65.8 83.6

TG PHARMA LT BUS 0.423 0.272 26.4 84.1

UNIT AUX BUS 0.433 101.283 -2.4 0 0 1.937 1.201 POWER PLANT BUS -1.937 -1.201 3000.2 85.0

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: SRHHL RC ETAP Page: 10

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BRILLIANT BUS 0.433 0.191 0.119 0.176 0.109 0.432 85.0 600.5

Bus1 11.000 0.748 83.1 39.4

Bus4 11.000 2.155 83.8 113.1

Bus15 11.000 2.438 83.4 128.0

Bus18 11.000 2.442 96.5 128.2

Bus21 11.000 2.436 96.6 127.6

Bus27 6.600 0.478 0.201 0.519 92.2 44.0

Bus31 11.000 3.620 1.190 0.898 0.295 4.756 95.0 250.6

NEW HYPO CHILLER BUS 6.600 0.219 0.135 0.209 0.129 0.503 85.0 45.0

NEW HYPO HT BUS 11.000 2.434 83.4 128.0

NEW HYPO OG-1 BUS 0.433 0.558 0.346 0.530 0.329 1.280 85.0 1750.6

NEW HYPO OG-2 BUS 0.433 0.478 0.296 0.448 0.278 1.090 85.0 1500.8

NEW HYPO SAP3 BUS 11.000 2.434 96.7 127.6

NEW PMD BUS 0.433 0.319 0.198 0.292 0.181 0.719 85.0 1000.9

OLD HYPO BUS 11.000 3.497 82.2 183.6

OLD HYPO CHILLER BUS 11.000 2.147 81.3 112.8

OLD HYPO OG-1 BUS 0.433 0.650 0.494 0.599 0.455 1.569 79.6 2178.7

OLD HYPO OG-2 BUS 0.433 0.574 0.356 0.546 0.338 1.317 85.0 1800.6

POWER PLANT BUS 11.000 1600.0 10.965 81.5 575.5 36.0

POWER PLANT BUS-2 11.000 1600.0 4.774 95.0 250.6 15.7

SAP2 BUS 0.433 2.505 95.0 3255.9

SAP2 OLD HYPO BUS 11.000 3.497 82.2 183.6

SAP3 BUS 0.433 2.505 95.0 3242.2

SRDK AND BRILLIANT BUS 11.000 0.900 84.1 47.3

SRDK BUS 0.433 0.191 0.119 0.178 0.110 0.434 85.0 600.4

STANDBY AUX BUS 0.433

TG PHARMA LT BUS 0.415 0.214 0.133 0.198 0.123 0.484 85.0 700.5

TGV PHARMA &NEW PMD 11.000 1600.0 1.251 83.6 65.8 4.1
BUS
UNIT AUX BUS 0.433 0.956 0.593 0.981 0.608 2.279 85.0 3000.2

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: SRHHL RC ETAP Page: 11

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

ACID PLANT &OLD HYPO Cable 326.16 76.06 23.32


CABL
NEW HYPO CABLE Cable 326.16 127.98 39.24

NEW PMD CABLE Cable 144.13 39.40 27.34

OLD HYPO CHILLER CABLE Cable 326.16 112.80 34.58

SAP-2 CABLE Cable 326.16 128.16 39.30

SAP-3 CABLE Cable 326.16 102.31 31.37

SAP-3A CABLE Cable 326.16 127.63 39.13

SRAAC CABLE2 Cable 326.16 250.58 76.83

SRDK & BRILLIANT Cable Cable 326.16 47.27 14.49

TGV PHARMA &NEW PMD Cable 195.60 65.83 33.65


CABLE
BRILLIANT TRF Transformer 0.500 0.450 90.0 0.432 86.4

NEW HYPO CHILLER TRF Transformer 1.000 0.515 51.5 0.503 50.3

NEW HYPO OG-1 TRF Transformer 2.500 1.310 52.4 1.280 51.2

NEW HYPO OG-2 TRF Transformer 1.600 1.123 70.2 1.090 68.1

NEW PMD TRF Transformer 1.000 0.748 74.8 0.719 71.9

OLD HYPO CHILLER TRF Transformer 1.000 0.528 52.8 0.519 51.9

OLD HYPO O/G-1 TRF Transformer 2.000 1.632 81.6 1.569 78.4

OLD HYPO OG-2 TRF Transformer 2.500 1.350 54.0 1.317 52.7

* SAP -2 TRF Transformer 2.500 2.505 100.2 2.442 97.7

* SAP-3 TRF Transformer 2.500 2.505 100.2 2.436 97.4

SRDK TRF Transformer 0.630 0.450 71.4 0.434 68.9

STANDBY AUX TRF Transformer 1.600

TGV PHARMA TRF Transformer 0.630 0.502 79.7 0.484 76.9

UNIT AUX TRF Transformer 2.500 2.369 94.7 2.279 91.2

* Indicates a branch with operating load exceeding the branch capability.


Project: SRHHL RC ETAP Page: 12

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

BRILLIANT TRF -0.367 -0.227 0.378 0.244 11.2 16.7 95.9 100.0 4.08

NEW PMD CABLE -0.622 -0.416 0.623 0.416 1.2 0.3 99.6 99.8 0.16

NEW PMD TRF 0.622 0.416 -0.611 -0.379 10.5 36.8 99.6 95.8 3.84

SRDK & BRILLIANT Cable 0.757 0.488 -0.757 -0.487 0.3 0.2 100.0 100.0 0.04

TGV PHARMA &NEW PMD 1.048 0.688 -1.046 -0.687 2.8 1.1 100.0 99.8 0.23
CABLE
NEW HYPO CABLE 2.034 1.345 -2.030 -1.342 3.8 3.1 100.0 99.8 0.20

SAP-3 CABLE -1.919 -0.342 1.920 0.343 1.4 1.1 100.0 100.1 0.08

SAP-2 CABLE 2.356 0.641 -2.355 -0.640 1.3 1.1 100.0 99.9 0.06

SAP -2 TRF -2.356 -0.641 2.380 0.782 23.5 141.2 100.0 102.6 2.59

SAP-3A CABLE 2.354 0.625 -2.352 -0.624 1.7 1.4 100.2 100.1 0.08

SAP-3 TRF -2.354 -0.625 2.380 0.782 26.1 156.8 100.2 103.0 2.87

OLD HYPO CHILLER TRF -0.478 -0.201 0.482 0.216 4.2 14.8 103.2 99.9 3.31

SRAAC CABLE2 -4.518 -1.485 4.533 1.498 15.2 12.6 99.6 100.0 0.38

NEW HYPO CHILLER TRF -0.427 -0.265 0.432 0.281 4.5 15.8 97.7 100.1 2.39

NEW HYPO OG-1 TRF 1.096 0.719 -1.088 -0.674 7.4 44.2 99.8 97.5 2.28

NEW HYPO OG-2 TRF 0.935 0.623 -0.927 -0.574 8.1 48.8 99.8 96.8 2.95

OLD HYPO CHILLER CABLE 1.746 1.251 -1.745 -1.250 1.2 1.0 99.9 99.9 0.07

OLD HYPO OG-2 TRF 1.128 0.742 -1.120 -0.694 8.0 47.7 99.9 97.6 2.40

OLD HYPO O/G-1 TRF 1.263 1.033 -1.249 -0.949 14.1 84.5 99.9 96.0 3.88

ACID PLANT &OLD HYPO 0.520 1.353 -0.519 -1.352 0.6 0.5 100.0 99.9 0.05
CABL
STANDBY AUX TRF 0.000 0.000 0.000 0.000 100.0 100.0

UNIT AUX TRF 1.959 1.331 -1.937 -1.201 21.8 130.8 100.0 101.3 1.28

SRDK TRF 0.379 0.243 -0.369 -0.229 9.7 14.5 100.0 96.4 3.54

TGV PHARMA TRF -0.412 -0.255 0.423 0.272 10.9 16.3 96.2 99.8 3.55

189.4 791.6
Project: SRHHL RC ETAP Page: 13

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

SAP -2 TRF Transformer Overload 2.500 MVA 2.505 100.2 3-Phase

SAP-2 GENERATOR Generator Overload 2.380 MW 2.38 100.0 3-Phase

SAP-3 GENERATOR Generator Overload 2.380 MW 2.38 100.0 3-Phase

SAP-3 TRF Transformer Overload 2.500 MVA 2.51 100.2 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

BRILLIANT BUS Bus Under Voltage 0.433 kV 0.415 95.9 3-Phase

Bus27 Bus Over Voltage 6.600 kV 6.81 103.2 3-Phase

NEW HYPO CHILLER BUS Bus Under Voltage 6.600 kV 6.45 97.7 3-Phase

NEW HYPO OG-1 BUS Bus Under Voltage 0.433 kV 0.42 97.5 3-Phase

NEW HYPO OG-2 BUS Bus Under Voltage 0.433 kV 0.42 96.8 3-Phase

NEW PMD BUS Bus Under Voltage 0.433 kV 0.41 95.8 3-Phase

OLD HYPO OG-1 BUS Bus Under Voltage 0.433 kV 0.42 96.0 3-Phase

OLD HYPO OG-2 BUS Bus Under Voltage 0.433 kV 0.42 97.6 3-Phase
Project: SRHHL RC ETAP Page: 14

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

SAP2 BUS Bus Over Voltage 0.433 kV 0.444 102.6 3-Phase

SAP3 BUS Bus Over Voltage 0.433 kV 0.45 103.0 3-Phase

SRDK BUS Bus Under Voltage 0.433 kV 0.42 96.4 3-Phase

TG PHARMA LT BUS Bus Under Voltage 0.415 kV 0.40 96.2 3-Phase


Project: SRHHL RC ETAP Page: 15

Location: Kurnool 16.0.0C Date: 28-02-2020

Contract: L S Electricals, Hyderabad SN: 4359168

Engineer: Sarathkumar.S Revision: Base


Study Case: LF
Filename: SRHHL AFTER COORDINATION Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 8.932 6.360 10.965 81.46 Lagging

Source (Non-Swing Buses): 4.760 1.565 5.011 95.00 Lagging

Total Demand: 13.692 7.925 15.820 86.55 Lagging

Total Motor Load: 8.448 4.178 9.424 89.64 Lagging

Total Static Load: 5.055 2.956 5.856 86.33 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.189 0.792

System Mismatch: 0.000 0.000

Number of Iterations: 3