Beruflich Dokumente
Kultur Dokumente
40
FOR INSTALLATION OF
2"Ø G.I. PIPE SCHED. 40 LAMP POST
FOR INSTALLATION OF
LAMP POST
2000
2000
600
4500
BARBED WIRE
600
3"∅ G.I. PIPE
SCHD. 40
2"x3"x1.5MM C-PURLINS
VERTICAL & HORIZONTAL STUDS
900
MATTING BARS HORIZONTAL BARS SPCD @
SPCD. EQUALLY EVERY 3RD LAYER
O.C.B.W.
NAT. GRD .LN.
2100
ON-FILL
ON-FILL
2100
800
1000
900
200
5-12mmØ MATTING
BARS SPCD.
EQUALLY O.C.B.W.
1000
300 400 300
100
15Ox100mm WALL
0.40MM THK.
FOOTING W/ 2-10mmØ
100
N.G.L. PREPAINTED RIBTYPE
LONGITUDINAL BARS
300
4"THK. CHB
100
400
150x200mm EARTH ON-FILL
SPCD. EQUALLY LINTEL BEAM
600
1000
O.C.B.W.
400
100
10MM∅ VERTICAL RSB
8-12MM∅ MAIN EXISTING COLUMN/ SPCD. AT 800MM W/
200
VERTICAL BARS W/ FOOTING 3-10MM∅MATTING
10MM∅ LATERAL BARS AND 10MM∅
300
PREPARED BY: PROJECT NAME: CHECKED BY: APPROVED BY: SHEET NO.