PIC Asia Pacific Sdn. Bhd.


11-Mar-20
Résumé
CODE # DOB May 10, 1981

NAME Malvin J. Napao

NATIONALITY Filipino

CAREER SUMMARY:

COMMISSIONING ENGINEER, September 2018 to January 2019, Field Core (GE Contractor), Egypt / Pakistan /
Jordan
o Al Amreya, December 2018 to January 2019, Egypt
o UCP, November 2018 to December 2018, Pakistan
o Samra GT31, September 2018 to October 2018, Jordan
COMMISSIONING MANAGER, July 2018 to September 2018, SSE (GE Contractor), EWA Project, Bahrain
COMMISSIONING MANAGER, September 2017 to June 2018, PME (GE Contractor), Saudi Cement, Saudi Arabia
EI&C COMMISSIONING, August 2017 to September 2017, PME (GE Contractor), P11 Power Station, Saudi Arabia
I&C COMMISSIONING, December 2016 to July 2017, (Ansaldo Thomassen), Ansaldo Thomassen, UAE
EI&C CONSTRUCTION MANAGER, July 2016 to December 2016, (Alstom), Los Humeros III, Mexico
ELECTRICAL CONSTRUCTION MANAGER, June 2015 to June 2016, (Hawkins BCK JO), Lumut Balai Geothermal
Power station, Indonesia
MEP SITE MANAGER, April 2014 to June 2015, (Leighton Contractor), Evoty Tyre Project, Indonesia
SITE MANAGER, October 2013 to April 2014, (Self Employed), CFB Coal fired power plant, Indonesia
EI&C COMMISSIONING MANAGER, May 2013 to September 2013, (Self Employed), Radcliffe Coal fired Power
plant, UK
SITE MANAGER, September 2012 to May 2013, (PT Navigat), 2xLM6000, Palembang, Indonesia
EI&C INSTALLATION AND COMMISSIONING ENGINEER, April 2012 to October 2012, (Siemens), Power Stations,
Belarus
SITE / COMMISSIONING ENGINEER, January 2011 to April 2012, (Kariangau Power), CFB Power Station, Indonesia
SITE MANAGER / COMMISSIONING MANAGER, December 2006 to January 2011, (Thiess Contractors Indonesia)
o CFB Power Station
o Darajat Geothermal Power station
EI&C SITE ENGINEER ROTATING EQUIPMENT, April 2005 to December 2006, (Self Employed), 4 X GE Frame 5
Turbine Generator Sets, Libya
SITE MANAGER FOR COMMISSIONING, January 2003 to April 2005, (Sulzer), GE and Siemens Steam Turbines,
Indonesia
POWER PLANT SITE MANAGER, 2000 to 2003, (PT Indocement), 300 MW Power Plant, Indonesia
EI&C START UP / COMMISSIONING ENGINEER, 1988 to 2000, (GE), Power Plants and Compressor, Hongkong /
Singapore
CODE # Page 2 of 18

EI&C DESIGN ENGINEER, 1986 to 1988, (Newton Le Willows), England


SITE ENGINEER, 1983 to 1986, (CCESE), Jeddah, Saudi Arabia
SITE ENGINEER, 1981 to 1983, (Solapak), High Wycombe, UK
APPRENTICESHIP EI&C, 1976 to 1981, (JC Greenhalgh), Bolton, UK

SUMMARY
 A specialist for GE Frame, steam and LM series turbines, Siemens gas turbines and steam turbines, EI & C
engineer, commissioning, Project Manager, Construction Manager and Site Manager
 With over thirty (30) years’ experience in professional engineering. Ideally suited for any role where the
complexity of services covers many disciplines including integration, coordination, and commissioning.
 Having a broad experience in, electrical, Instrument, control and mechanical engineering.
 Languages: English, Indonesian, some Malaysian, Arabic, Spanish and Chinese.

EDUCATION
Course School
HNC in Electrical and Production Engineering Bolton College of Further Education Bolton, UK, 1979 – 1981
ONC in Electrical and Production Engineering Bolton College of Further Education Bolton, UK, 1977 – 1979
C & G in Electrical Construction Kingston College of Further Education Kingston, UK, 1981 – 1982
C & G 17th Edition Electrical wiring, 2009

DETAILED WORK EXPERIENCES


1) Duration: September 2018 to January 2019
Position: COMMISSIONING ENGINEER
Company: Field Core (GE Contractor)
Location(s): Egypt / Pakistan / Jordan
Project(s): Al Amreya, December 2018 to January 2019, Egypt
 Working on the El Amreya power station Egypt, upgrading the control system
from Secontic to a GE Mark Vie, complete with upgrading the SFC, and all the
field controls
 Modified to gas and liquid fuel FCV.
 Changed out all the old transmitters to new Rosemount transmitters
CODE # Page 3 of 18

 Upgraded the vibration system to Bentley Nevada


 Replaced to MCC and switchgear
 Replaced all the old cables for new cables
 Precommissioning all the valves and control equipment

UCP, November 2018 to December 2018, Pakistan


 Working on the UCP 1 power station Pakistan, commissioning the electrical
systems, and EX2000 excitation system after a major overhaul on an inspection
on 4 x Frame 9 CCPP.
 Checked and commissioned the EX2000.
 Checked the DC battery system
 Checked the generator brush and grounding system
 Checked the breakers

Samra GT31, September 2018 to October 2018, Jordan


 Working on the Samra III power station Jordan, commissioning the electrical,
excitation and protection after a C inspection on a GT26.
 Commissioned the various Micom Relays for generator, transformer and
excitation protection, used the Omicrom Test Universe to inject and test the
relays.
 Checked the Converteam static excitation system
 Checked the Converteam static frequency convertor
 Checked the Synchrotact 5 synchronizing system

6) Duration: July 2018 to September 2018


Position: COMMISSIONING MANAGER
Company: SSE (GE Contractor)
Location(s): Bahrain
Project(s): EWA
Responsibilities:  Working on the Sitra power station Bahrain, advising the on the rebuild of an
Alstom GT9D Gas turbine after a C inspection.
 Supervised the PTW and HASOP on site.
 Completing the rebuild, then completed the open case balancing, before
installing the turbine top casing.
 Checked the operation of all the pumps, fans and motors for correct operation.
 Checked the 24VDC and 125VDC system, checked all the instruments and control
portion.
 Commissioned the Static frequency controller (SFC) for starting the turbine
 Commissioned the BBC Secontic control system ready for operating the GT
checked that all the input signals worked and that the Secontic changed modes
as the speed increased.
 Calibrating all the instruments including replacing and calibrating the starting
valve and the fuel control valve.
 Started the turbine ran to FSNL then checked the balancing of the turbine with
CODE # Page 4 of 18

the ADRE system


 Loaded the turbine checking the vibration
 Checked all the safety systems and ESD systems during operation
 Restarted the GT9D units and placed in operation
 Completed the commissioning of the unit and handed over to the customer,
completed the reports for the customer.

7) Duration: September 2017 to June 2018


Position: COMMISSIONING MANAGER
Company: PME (GE Contractor)
Location(s): Saudi Arabia
Project(s): Saudi Cement
Responsibilities:  Working on the Saudi Cement power station Hofuf, advising the on the rebuild
of an Alstom GT9D Gas turbine after a C inspection.
 Supervised the PTW and HASOP on site.
 Working on site to supervise the reblading and rebuild with Alstom Mechanical
TA’s
 Completing the rebuild, then completed the open case balancing, before
installing the turbine top casing.
 Installed the new 125VDC system, checked all the instruments and control
portion.
 Rebuilt the DC starter system after shaft machining and bearing resizing
 Commissioned the Allen Bradly ControlLogix ready for operating the GT
 Calibrating all the instruments
 Started the turbine ran to FSNL then checked the balancing of the turbine with
the ADRE system
 Loaded the turbine checking the vibration
 Checked all the safety systems and ESD systems during operation
 Restarted the GT9D units and placed in operation
 Working on site stripped the GT9D down removed the rotor and supervised the
rebladed the turbine all 4 stages and supervised the reinstallation of the turbine
vanes.
 Rebuilt the GT9D to perform the open case balancing
 Completed the open case balancing
 Completed the rebuild, then supervised the final balancing.
 Commissioned the unit and handed over to the customer
 Prepared the completion reports.

13) Duration: August 2017 to September 2017


Position: EI&C COMMISSIONING
Company: PME (GE Contractor)
Location(s): Saudi Arabia
CODE # Page 5 of 18

Project(s): P11 Power Station


Responsibilities:  Working on the P11 CCPP Riyadh, advising the Instrument and control
installation and operations team.
 Working on site to commission the I&C portion of the project for the liquid and
DLN, checking the installation of the GE Mark VIe control system for 9 x GE
Frame 7FA dual fuel gas turbines combined cycle complete with DLN control.
 Completing all the hot and cold loop checks from the field to the GE Mark VIe
control system for the FO and DLN system.
 Preparing the Mark VIe ready for operating the power plant on FO and water
injection.
 Calibrating all the instruments on the FO and DLN systems.
 Checking operation of all the instruments and the valves on the liquid and DLN
system.
 Checking the operation of the switchgear and MCC
 Calibrating and stroking all the control valves.
 Checking operation of the service and forwarding pumps.
 Checking the Generator Protection panel and the Transformer protection panels
 Testing the Synchronizing system on gas and change over to FO.
 Supervising first firing and synchronization of the Frame 7FA turbines to the grid
on FO with water injection.
 Checking the operation of the systems in both Gas and liquid operation after
operation on full load.

19) Duration: December 2016 to July 2017


Position: I&C COMMISSIONING
Company: Ansaldo Thomassen
Location(s): UAE
Project(s): Ansaldo Thomassen
Responsibilities:  Working with Hyundai the power station constructors, advising the Instrument
and control installation and commissioning team.
 Working on site to commission the I&C portion of the project, manage the
installation of the Siemens TC-7 control system for 4 x GE Frame 9 dual fuel gas
turbines simple cycle complete with DLN control. Set up the communication
between the TC-7 and the T3000 DSC
 Completing all the hot and cold loop checks from the field to the Siemens TC-7
control system.
 Preparing the TC-7 ready for operating the power plant and communicating with
the Siemens T3000 DCS.
 Set up the T3000 to operate with all the control systems
 Calibrating all the instruments.
 Checking operation of all the instruments and the valves.
 Checking the operation of the MCC from the TC-7
 Checking the operation of the switchgear from the TC-7
 Calibrating and stroking all the control valves and the torque motors.
CODE # Page 6 of 18

 Checking operation of the service and forwarding pumps.


 Checking the operation of the EX2100 excitation system
 Checking the Generator Protection panel and the Transformer protection panels
 Testing the Synchronizing system
 Supervising first firing and synchronization of the Frame 9 turbines to the grid.
 Completing the TOP, ITP and QA/QC documents for the I&C portion of the
project.
 Starting and operating the GE Frame 9FA turbines.
 Checking the operation of the systems in both Gas and liquid operation.

25) Duration: July 2016 to December 2016


Position: EI&C CONSTRUCTION MANAGER
Company: Alstom
Location(s): Mexico
Project(s): Los Humeros III
Responsibilities:  Worked with the designers of the electrical, Instrument and control design and
issued the changes to the contractors.
 Worked with the CFE (Mexican Electrical Authority) to hand over the systems to
commissioning and closing the punch list items.
 Worked on site to Manage the building of the EI&C portion of the project once
the civil portion has completed the areas, Managed the installation of all the
earthing and bonding, underground services, cable ducts and underground
services, including firefighting.
 Making the ITP and QA/QC documents for the EI&C portion of the project.
 Completing the TOP to handover the systems to commissioning in a timely
manner.
 Completing the SAT on the transformers, switchgear and MCC.
 Installing the ALSPA control system, testing the field instruments to the ALSPA
P320 Cold commissioning to the ALSPA control system. Setting up all the fiber
optic and LAN connections.
 Testing of the field instruments and control valves to the ALSPA.
 Managing the subcontractors to complete the work on schedule and within
budget.
 Prepared PTW and safety documents.

31) Duration: June 2015 to June 2016


Position: ELECTRICAL CONSTRUCTION MANAGER
Company: Hawkins BCK JO
Location(s): Indonesia
Project(s): Lumut Balai Geothermal Power station
Responsibilities:  Worked with the designers on the electrical, Instrument and control design and
CODE # Page 7 of 18

issued the changes to the contractors


 Worked on site to supervise the building of the EI&C portion of the project once
the civil portion has commenced, supervised the installation of all the Earthing
and bonding, underground services, cable ducts and underground services,
including firefighting and plumbing
 Making the ITP and QA/QC documents for the project
 Worked with Toshiba to integrate the rest of the supplier’s instruments and
Modbus will communicate with the Toshiba DCS.
 Prepared the detailed work on the Building services for the quotation process.
 Worked with the designers to solve issues on the building services
 Attended design meetings in Japan and Indonesia
 Attended the HAZOP meetings
 Built the infrastructure for the project including batching plant, camp and offices
for the project, which included temporary power and distribution, lightning
protection, septic tanks, bore holes for water. Including setting the VSAT system
and the office LAN system.

37) Duration: April 2014 to June 2015


Position: MEP SITE MANAGER
Company: Leighton Contractor
Location(s): Indonesia
Project(s): Evoty Tyre Project
Responsibilities:  Worked with the client on the electrical and mechanical design and issued the
changes to the contractors
 Worked on site to supervise the building of the MEP portion of the project once
the civil portion was completed, supervised the installation of all the Earthing
and bonding, underground services, cable ducts and firefighting services.
 Once the underground services had started worked with the civil contractor to
start the steam, water and compressed air systems.
 Worked with the structural designer to design the pipe racks to support the
pipes
 Worked with the customer to build a suitable BMS, CCTV, access and security
system
 Sourcing suitable suppliers for the equipment needed on site.
 Building the project and installing all the MEP equipment
 Installed all the 20kV Switchgear, Transformers and the 20kV cable ring main.
 Testing the electrical switchgear, transformers and MCC.
 Testing the 20kV cables.
 Linked the 20kV to the PLN network tested the system and got the approval
through DEPNAKER to power up the plant.
 Energized the site and initiated the Lock Out Tag Out system
 Attending the design meetings with the client
 Attended the commissioning and start up meetings with the client and the other
subcontractors to safely commission and start the equipment which included,
CODE # Page 8 of 18

The Transformers, 20kV ABB switchgear, steam boilers, steam pipes, water
pipes, chillers and cooling towers, utility pumps, sewer system and the MCC
rooms.
 Built and commissioned the server room for controlling the complete plant.
Installed the LAN network for the plant at the machines
 Built the camp and infrastructure for the project, which included temporary
power and distribution, lightning protection, septic tanks and bore holes for
water.

43) Duration: October 2013 to April 2014


Position: SITE MANAGER
Company: Self Employed
Location(s): Indonesia
Project(s): CFB Coal fired power plant
Responsibilities:  Doing the initial design work of PLN projects, the projects were to be 100
-450MW CFB steam plants for remote locations
 Check heat balance and water balance
 Sourced local boiler suppliers
 Worked with Siemens steam turbine division to source suitable steam turbines.
 Making P&I drawings for future projects and project bids
 Working with the Instrument team to find suitable DCS control systems for
future projects
 Sourcing suitable suppliers for future power plant projects within Indonesia
using Siemens turbines, ABB switchgear, Torishimaguna Pumps and Yokogawa
DCS complete with locally built CFB boilers.
 The projects never started.

49) Duration: May 2013 to September 2013


Position: EI&C COMMISSIONING MANAGER
Company: Self Employed
Location(s): UK
Project(s): Radcliffe Coal fired Power plant
Responsibilities:  Working for EON at the Radcliffe on Soar power plant in the UK, overhauling the
existing English Electric Switchgear 11kV, 3.3kV and 415volt
 Injection testing and Calibrating the protection relay’s
 Commissioning the various models of Rotork valves on the boilers and turbines
and testing to the Ovation DCS
 Installing the new Ovation DCS system and testing from the field to the control
room.
 Working on 11kV switchgear and checking transformers
 OASIS and safety trained
CODE # Page 9 of 18

55) Duration: September 2012 to May 2013


Position: SITE MANAGER
Company: PT Navigat
Location(s): Indonesia
Project(s): 2xLM6000, Palembang
Responsibilities:  Installing the 2 x LM6000 in Palembang for PLN the job included working with
the installation team, completing the mechanical installation of the packages,
then installing all the GE Mark Vie controls, all the cabling and preparing for the
commissioning stage.
 Commissioned the LM6000 units.
 Installed 2 x TM2500 packages in Palembang for emergency power, received the
trailers hooked them up and started to commission the packages.
 Checking all the loops from the field to the GE LM6000
 Checking connections between customer interface and Switchgear.
 Liaising with each group making sure the equipment is installed correctly is fit for
purpose
 Managed the new 40MW GE Janbacher Gas Engine power station, doing all the
pre-commissioning work and commissioning work to make sure that the system
was ready for powering up.
 Worked closely with PLN Commissioning team
 Installing and commissioning switchgear up to 33kV
 Installing transformers and start up and commissioning transformers up to 33kV
 Checking all the loops from the field to the GE Janbacher Gas Engine
 Checking connections between customer interface and Switchgear.
 Liaising with each group making sure the equipment is installed correctly is fit for
purpose.
 Installed all the gas piping and hydro testing of the gas lines.
 Installing all the AHU systems for the gas engine packages
 Installing al the gas engine packages aligning the machines to the generators
doing the pre-start checks.
 Calibrating the site instruments Rosemount and Siemens transmitters
 Preparing for first firing
 Checking the generator controls and protection
 Operated and worked on the LM6000 plants installed by Navigat in Indonesia
 Worked with GE field Service on improving the maintenance and operating
schedule on the following equipment LM6000 and TM2500

61) Duration: April 2012 to October 2012


Position: EI&C INSTALLATION AND COMMISSIONING ENGINEER
Company: Siemens
Location(s): Belarus
CODE # Page 10 of 18

Project(s): Power Stations


Responsibilities:  Start up and commissioning a new power station, doing all the pre-
commissioning work, from initial power up to installing the PCS 7 control system
 Installed the gas turbine, aligned the gas turbine, installed all the motors and
BOP
 Pre-commissioned all the BOP ready for the start up
 Checking all the loops from the field to the PCS 7
 Checking connections between customer T3000 interface and PCS 7.
 Liaising with each group making sure the equipment is installed correctly is fit for
purpose.
 Calibrating the site instruments Rosemount and Siemens transmitters
 Preparing for first firing
 Checking the generator controls and protection to the PSC 7.
 Installed and commissioned the 11kV switchgear and 415v MCC panels checked
and commissioned switchgear and MCC
 Safety trained, PCS 7 trained.
 Offshore trained BOISE
 Worked on 3 off shore Ruston gas turbine compressor units, changed and
calibrated the control valves.

67) Duration: January 2011 to April 2012


Position: SITE / COMMISSIONING ENGINEER
Company: Kariangau Power
Location(s): Indonesia
Project(s): CFB Power Station
Responsibilities:  Commissioning a new power station complete with CFB boiler, initially checking
the design and the compliance with the contract.
 Doing the FAT in China, on the 11kV transformers and 11kV switchgear
 Duties include liaising with all the consultants to make sure the correct
equipment is supplied and installed according to the prevalent standards.
 Liaising with each group making sure the equipment can be maintained and is fit
for purpose.
 Liaised with the Precommissioning team to make sure the systems where
handed over on schedule and to specifications.
 Installed and precommissioned the Siemens PCS 7 Control system.
 Commissioning manager responsible for making sure the construction of the
power station meets the relevant standards writing the commissioning
procedures and preparing for the pre-commissioning and commissioning of the
power plant.

73) Duration: December 2006 to January 2011


Position: SITE MANAGER / COMMISSIONING MANAGER
CODE # Page 11 of 18

Company: Thiess Contractors Indonesia


Location(s): Indonesia
Project(s): o CFB Power Station
o Darajat Geothermal Power station
Responsibilities:  Power Station Commissioning Manager, now operating steam power station that
we built, precommissioning, commissioned and start up.
 Prepared all the operating and maintenance procedures, complete with making
sure the shutdowns are planned and executed to the time schedule.
 The project was a CFB boiler power station the job was to manage the complete
project from the piling to the commissioning and handover of the working
power station to the client.
 Completed the installation of all the equipment from the black start diesel,
transformers and switchgear, MCC and DCS.
 Installed the turbine and generator set complete with the boiler and BOP.
 Installed and precommissioned the Siemens PCS 7 Control system.
 Commissioning manager responsible for making sure the construction of the
power station meets the relevant standards writing the commissioning
procedures and preparing for the pre-commissioning and commissioning of the
power plant.
 Duties started from hydro testing the boiler, commissioning the coal handling
system complete with crushers, to the first firing of the boiler, steam blows and
oil flushing the system.
 Started the turbine, the vibration was high, used the Bentley Nevada vibration
system, to analysis the vibration, worked with Bentley Nevada to balance the
generator.
 Restarted the system and loaded the system, distributed the power to the coal
plant.
 Duties include liaising with all the relevant teams to make sure the correct
equipment is supplied and installed according to the prevalent standards.
 Liaising with each group making sure the equipment can be maintained and is fit
for purpose.
 Operated the system and taught the team how to maintain and operate the
plant.
 Equipment list included a Chinese supplied boiler from Wuxi Boilers, a Chinese
supplied Turbine and Generator set, BOP all Chinese supplied complete with a
Siemens PCS 7 Control system, Beckwith generator protection and transformer
protection.

Control Specialist and Commissioning Engineer for Darajat Geothermal Power station
 Controls specialist brought in to complete the DCS design, a Yokogawa Centum
CS 3000 for an 110MW geothermal power plant.
 Completed the design and made sure all the instruments complied with the
contract and relevant specifications, also finalized the cable schedule and
termination schedules for the complete power plant and BOP
 Completed all the FAT and SAT documentation for all the motors 3.3kV, 6.6kV
and 11kv, switchgear up to 33kv, MCC, transformers, and DCS.
CODE # Page 12 of 18

 Witnessed all the FAT for the Transformer, switchgear, MCC, 6.3kV and 3.3kV
motors, DCS, H2S system, Fire Alarm system, UPS and Control Valves.
 Completed electrical and control commissioning and pre-commissioning
documentation
 Worked closely with the Chevron QA/QC team and was involved in the HAZOP,
CHAZOP & EHAZOP. All the FAT tests for all the Mechanical, electrical and
electronic equipment with the Chevron QA/QC
 Supervised the installation and commissioning of all the MV and LV switchgear
and control equipment and DCS Yokogowa Centrum 3000
 Supervised the installation of the steam turbine and all the BOP to make the
geothermal power plant operate.
 Supervised the installation and commissioning of the 150MW XFMR and all the
auxiliary XFMR’s supervised the SAT and witnessed the FAT.
 Worked with Chevron on the FAT and SAT of all the switchgear, pumps, motors,
stand-alone control systems and the DCS
 Supervised the Mechanical, electrical & instrument pre-commissioning team
 Supervised the Mechanical, electrical, Instrument & controls commissioning up
to SAT.
 Supported the commissioning engineer and the commissioning team during the
all the breaker operations and all the load and load rejection tests
 Supervised the operation during the hand over period
 Supervised all the maintenance

79) Duration: April 2005 to December 2006


Position: EI&C SITE ENGINEER ROTATING EQUIPMENT
Company: Self Employed
Location(s): Libya
Project(s): 4 X GE Frame 5 Turbine Generator Sets
Responsibilities:  Traveling to and from Libya supervising the upgrade of their control system and
overhauling 4 X GE Frame 5 Turbine generator sets. Complete with Mark V
controls.
 Upgraded all the vibration system to Bentley 3000
 Supervised the complete overhaul of the GE Frame 5 Turbine and generators
100,000-hour overhauls.
 Calibrated all the instruments and completed the relevant QA/QC
documentation
 Supervised the start-up and load tests
 Supervised the operation and maintenance program
 Made sure that the QA/QC on the project was met and that the machines would
operate again after the major overhaul.
 Restarted and operated the gas turbines and taught the local operators.

85) Duration: January 2003 to April 2005


CODE # Page 13 of 18

Position: SITE MANAGER FOR COMMISSIONING


Company: Sulzer
Location(s): Indonesia
Project(s): GE and Siemens Steam Turbines
Responsibilities:  The job included the day-to-day running of the field Service department and
going to sites to perform Generator set overhauls, maintenance and re-
calibration of DCS, generator protection relays and exciter systems.
 Implemented the relevant QA/QC documentation and the compliance of it.
 Implemented the planning and scheduling before the projects began; than on
site I was usually the site manager, making sure the project went according to
schedule and communicating with the customer on a day to day basis.
 Supervised the overhaul of several large GE and Siemens steam turbines in
Indonesia and Vietnam sizes of the steam turbines and boiler systems up to
660MW each turbine. This included 25,000-hour and 50,000-hour overhauls and
re-commissioning.
 Including the overhauling of all the BOP plant
 Overhauled the Mindanao Geothermal station changed out the rotor and
restarted the system.
 Completed several EGT (Ruston Turbines) and Siemens Tornado and Cyclone
overhauls, precommissioning, commissioning and restarts.
 Worked on RS Logix PLC controls for EGT and Siemens Tornado and Cyclones in
Brunei
 Travelled to various BBC/Alstom sites working on various control systems
including the Secontic, and Procontrol P14,
 Traveled to various sites in Asia maintaining the LM6000, LM5000, and LM2500
packages, this included periodic maintenance, recommissioning after hot section
change outs, and general site issues after failures to start.
 Completed several GE Frame 5, Frame 6 and Frame 7 overhauls and startups, in
Indonesia, Vietnam and Malaysia, including all the electrical and electronic
calibration, along with the fire protection systems. Mark V and Mark VI controls
plus Wilson and Detronics fire systems.
 Worked on the following DCS equipment and generator controls including Allan
Bradley Logix system, Woodward, GE, Turbolog, Siemens and Yokogowa DCS
Centrum 3000.
 Completed several generator overhauls including the Polarization Index,
Dielectric testing, re-wedging and condition checking of the bearings, stator and
rotor.
 Upgraded the generator controls to EX2100 on several Frame units.

91) Duration: 2000 to 2003


Position: POWER PLANT SITE MANAGER
Company: PT Indocement
Location(s): Indonesia
CODE # Page 14 of 18

Project(s): 300 MW Power Plant


Responsibilities:  The job includes the day-to-day running of a 300 MW power plant, which
comprises of GE LM5000 STIG Turbines, Pielstik Diesels, waste heat recovery
boilers and an ABB steam turbine, compressors and all the ancillary equipment.
 Employed to teach the local technicians how to carry out the planned
maintenance and to bring up the availability of the units and improve the overall
efficiency of the units.
 Implemented the electronic testing and upgrading of the DCS systems,
upgrading the PLC control systems and the load shedding system.
 Improved the QA/QC checking of the Demin water system and BOP to improve
the operating hours and improve the maintenance periods per equipment
supplier recommendations.
 Worked with purchasing and implemented an improved system on how to keep
track of parts. Implemented the repair of parts rather than always replace with
new, this meant teaching the technicians how to use repair kits then test out the
repaired components.
 Overhauled the generators, which included repairing ground faults and
generator rotor removal, re-wedging, partial discharge testing, dielectric testing
and PI testing.
 Oversaw the periodic testing and maintenance of all the generator protection
relays and excitation systems.
 This includes implementing new ideas and improving existing plan, such as
overhauls and rehabilitating old plant. This includes keeping accurate running
logs.
 The equipment is 2 X GE LM5000, Brush generators, the steam turbine is an ABB
complete with ABB generator, the waste heat recovery is both Deltak and
Aalborg, and the diesels are Pielstik 18 cylinder, demin water system,
 Controls on site AB Logix, Woodward, Woodward load shedding. GE Micron net
system.

97) Duration: 1988 to 2000


Position: EI&C START UP / COMMISSIONING ENGINEER
Company: GE
Location(s): Hongkong / Singapore
Project(s): Power Plants and Compressor
Responsibilities:  The position was to install and commission power plants and compressor plants
all over the world, both on shore and offshore; was involved in all aspects of the
mechanical, electrical instrumentation and control doing the precommissioning
and commissioning.
 Installed and commissioned LM6000 in the US, Canada, Australia, China,
Indonesia and Europe.
 Installed and commissioned LM5000 in China and Indonesia.
 Installed and commissioned LM2500 in China, Brunei and Indonesia
 Later returning to sites to do the maintenance and overhauls including
CODE # Page 15 of 18

recommissioning and start up after the overhauls.


 On call to go to all the plants that shutdown and could not be restarted, as well
as going to sites check the controls and instruments that where not operating
properly or having erroneous trips.
 Installed the turbine and BOP packages, worked with the contractor for installing
all the various piping systems.
 Supervised the installation of the HRSG boilers and the boiler controls.
 Supervised the electrical contractor who installed all the cable trays and pulled
the cables. Installed all the switchgear and MCC, installed the transformers.
 Tested the MV and LV cables, transformers step up and auxiliary, testing the
switchgear and MCC.
 Preparing all the Electrical and mechanical equipment for Precommissioning and
commissioning.
 Preparing the QA/QC documentation.
 Maintained the Brush and ABB generators, including removing the rotor, re-
wedging and removing the end caps off the rotors.
 Overhauled and reinstated several failed generators, including working with
Golders to re-machine the rotor insitu and change out the bearings.
 Calibrated all the instruments and integrated all the instruments into the control
systems ready for commissioning and start up.
 Calibrated the instruments and stroked the valves from the Woodward DCS
Controls including; 501, 505, 3000, 5000, MicroNet and Netcon PLC Systems.
 Worked on GE turbine and generator controls including; Atlas DCS controls,
Mark V, Mark VI, GE Fanuc systems including the Millennium DCS controls,
EX2000 and EX2001 generator controls
 Worked on Allan Bradley PLC controls, Logix controls for EGT Tornado packages
 Worked on Rosemount DCS control systems.
 The job included operating and maintaining all the BOP auxiliary plant
equipment. Such as generators, boilers and pumps, along with the associated
MV and LV switchgear.
 Worked in the special project’s division, completing the Peace Shield project, my
main duties where the E, I and C for the equipment which was 18 power plants
of 4 MW stand-alone power stations using Yanmar and Caterpillar diesels in
Saudi Arabia. Along with all the on-site design changes and modifications, I was
involved in the installation and commissioning and the maintenance for 4 years.
I have also worked on Detroit Diesel and EMD.
 Installed and commissioned the switchgear and the MCC for all the power
stations, also included initiating the Lock out tag out procedure for the live
maintenance of the switchgear.
 Worked on the Solar Turbines and Turbotronic control system used on the Saudi
Arabian pipeline as pumps and to generate electricity.
 Worked on aero derivate turbines and industrial turbines, such as the GE
LM6000, LM5000 and LM2500 and the GE frame 5, 6 and 7, EGT Tornado and
Cyclone, Allison and Garrett turbines 501 and Solar Mars and Saturn units,
Ruston Tornado and ABB industrial turbines.

103) Duration: 1986 to 1988


CODE # Page 16 of 18

Position: EI&C DESIGN ENGINEER


Company: Newton Le Willows
Location(s): England
Responsibilities:  The job included doing all the Mechanical, Electrical and Instrument layout and
detail design drawings for power stations, emergency power units and ships. I
had to do all the cable schedules and electrical connection drawings for
approval, installation then the red lines.
 Compiled the P & I drawings and all the packages
 Drew the E, I & C drawings for the Ruston packages.
 Most of the drawing where computer aided and some drawing board work.
 There was a lot of design work carried out on improving existing designs and on
the new lines such as duel fuel diesel and gas. The improvement to existing lines
was designing the new piping to fit the new improved turbochargers and
upgrading the electrics and electronics on older power stations.
 The more exotic design work came in the refit of new engines into old ships and
trains.

108) Duration: 1983 to 1986


Position: SITE ENGINEER
Company: CCESE
Location(s): Jeddah, Saudi Arabia
Responsibilities:  Continuation of the project from England.
 Doing installation, commissioning and maintenance of the solar diesel hybrid
power stations for stand-alone microwave repeater stations. All over the Middle
East in very remote locations.
 Maintaining all the airport lighting system and UPS systems.
 Traveled all over Saudi Arabia, teaching the international technicians how to
carry out the maintenance and repair of the electrical and electronic control
systems, including how to maintain UPS systems and keep accurate operating
and maintenance logs.

113) Duration: 1981 to 1983


Position: SITE ENGINEER
Company: Solapak
Location(s): High Wycombe, UK
Responsibilities:  Doing the design and building of Photovoltaic arrays for remote power.
 Designed through conception of several Diesel Photovoltaic hybrid systems for
remote power stand-alone power systems.
 Worked on several projects in Africa and the Middle East. Installing and
commissioning remote stand-alone power for the Pan African
CODE # Page 17 of 18

Telecommunication link.
 Worked on the PLC control systems of photovoltaic systems and the UPS
controls.
 Worked on large UPS systems associated with the Photovoltaic systems.
 Developed easy to build packages for the African market. Worked on water
pumping and cleaning river water for drinking water.
 Left to continue the project in the Middle East.

118) Duration: 1976 to 1981


Position: APPRENTICESHIP EI&C
Company: JC Greenhalgh
Location(s): Bolton, UK
Responsibilities:  Did a full apprenticeship in Electrical and I &C Engineering, which also included
time in the Mechanical department.
 Traveled throughout the UK and Europe installing rotating machinery and
mechanical handling equipment.
 Made all the electrical and electronic design drawings, site drawings and as built.
 Built electrical panels, including the wiring and testing.
 Calibrated all the instruments on site and in the office.
 Installed motors, switchgear and MCC’s.
 Spent time in each department both on the shop floor and in the field traveling
around the UK and Europe doing installation, start up and helping with the
commissioning of various rotating equipment.
 Learnt welding techniques, steel plate work, erecting. Machining and panel
building.

TRAININGS / SEMINARS ATTENDED


 Project Engineer 1982, Solar Energy Training in High Wycombe UK
 Design Draughtsman 1986, CAD Training in Ruston Diesel
 Field Service 1989,
o SSEP Control Engineering Course in Houston
o GE generator control Training course in Houston
o GE Fanuc Training course in Houston
o Woodward Training in Houston
 Control Field Service 1992
o Woodward Netcon Training in Houston
o GE and Brush generator and excitation control course in Houston
 Control Field Service 1999
o GE Fanuc 90/70 and Netcon Millennium panel training in Houston
o GE EX2000 and EX2001 training in Houston
CODE # Page 18 of 18

 Field Service 1989


o Mark IV and Mark V training in Houston
o GE Fanuc Training in Houston
 Field Service 1999, SSEP Control Engineering Course in Houston
 IDC Online course 2008, Advanced Diploma Instrument and Automation Engineering
 IDC Online course 2008, Diploma Grounding and Shielding
 IDC Online course 2010, Advanced Diploma Electrical Engineering
 Siemens PCS 7 training 2012