ITEM NO. DESCRIPTION OF ITEM UNIT QUANTITY GENERAL NOTES: Cumulative Equivalent Standard Axle Lad, CESAL = 11.78E+6
IS POURED AHEAD & ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE. Resilient Modulus, MR (from Graph) = 16,500
100(1) CLEARING AND GRUBBING sq.m. 1,200.00 3. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT Reliability, R = 85%
NO CONCRETE FROM THE LAST SLAB FACE OVERHANGS ANY PORTION OF THE FIRST SLAB.
101(3)a REMOVAL OF ACTUAL STRUCTURES AND OBSTRUCTION sq.m. 700.00 4. THE BARS SHOULD BE DEFORMED STEEL BARS & ALL DOWEL BARS SHALL BE SMOOTH ROUND STEEL.
5. TYPE OF WEAKENED PLAIN JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE
ZR
=
-1.037
0.35
=
4.5
4.5
IRON FREE FROM RUST & KINKS.
104(2)a SELECTED BORROW FOR TOPPING - CASE 1 sq.m. 2,229.67 7. AT LEAST SIX(6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINTS SPACING SHALL BE PROVIDE
BEFORE OR AFTER AN EXPANSION JOINT.
Present Serviceability, Psi
=
2.0
3.37E+06
105(1)a SUBGRADE PREPARATION - COMMON MATERIAL sq.m. 1,565.00 8. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH
30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE
PCCP Modulus of Rupture, S'c [550 psi @ 14 days] = 636
BE ELIMINATED/PREVENTED THUS, PROVIDE A SMOOTH LEVELING SURFACE. Loss of Support, L.S. = 1.0
B. SUB BASE AND BASE COURSE 9. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT SHALL BE CONTINUOUS FROM EDGE TO EDGE.
10. ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTION WITH NO GAPS & OFFSETS.
Effective Modulus of Subgrade Reaction, k = 260
11. PURSUANT TO THE GAA.FY-2007, SEC. 43 & 33: ALL GOVERNMENT FACILITIES, INCLUDING INFRA, PCCP thickness (thickness to carry future traffic): = 200mm
201(1) AGGREGATE BASE COURSE cu.m. 2,094.84 NON-INFRA AND CIVIL WORKS PROJECTS OF THE GOVERNMENT AS WELL AS OFFICE BUILDINGS, Aggregate Sub-base course thickness: = 100mm
STREETS AND HIGHWAYS, SHALL PROVIDE ARCHITECTURE/STRUCTURAL FEATURES AND DESIGNS
C. SURFACE COURSE THAT SHALL REASONABLY ENHANCE THE MOBILITY, SAFETY AND WELFARE OF DIFFERENTLY-ABLED
PERSONS PURSUANT TO B.P.BLG. 344 AND R.A. NO. 7277. PAYMENT SHALL BE SUBSIDIARY TO OTHER
311(1)d1 P.C.C.PAVEMENT (UNREINFORCED) 0.20m thk. 14 days sq.m. 13,068.00 PAY ITEM.
B.5 PROJECT BILLBOARD/SIGNBOARD each 1.00 0.012 TRANSVERSE CONSTRUCTION JOINT MIN. OF 1.50M FROM WEAKENED
PLANE TO BE PROVIDED AT THE END OF A DAYS RUN AND WHERE
0.50 0.50 LAYING OF CONCRETE HAS STOPPED 30MIN OR LONGER
VARIES
0.4m
0.3m
C STATION COVERAGE: 0.30
0.30
STA. 0+064.9 - STA. 0+080.5
STA. 0+084.9 - STA. 0+144.9
STA. 0+154.1 - STA. 0+236
STA. 0+239.2 - STA. 0+305.6
STA. 0+310.15 - STA. 0+390.8 0.60
STA. 0+413.8 - STA. 0+443.5 0.60
STA. 0+565.3 - STA. 0+578.2
IES
0.8m
PREPARED BY: CHECKED BY: REVIEWED: RECOMMENDED: APPROVED: PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VARIOUS DPWH
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED PROJECTS SUMMARY OF QUANTITIES GENERAL 2
AS STAKED PLAN EML CONSTRUCTION
AND TRADING
ELMER F. ARELLANO
REGIONAL OFFICE NO. 3