NOTE
MEPL Reference dwg no:
MEPL/19-20/DWG/034 for Total earthing layout.
A

MEPL/19-20/DWG/035 for Switch yard earthing. 1. All dimensions are in mm. A

MEPL/19-20/DWG/036 for Transformer hall earthing. 2. 52x12mm MS flat used for equipment
MEPL/19-20/DWG/037 for Power house earthing. earthing(equivalent size of conductor
MEPL/19-20/DWG/038 for Butterfly valve chamber earthing. to be used).
MEPL/19-20/DWG/039 for BOQ. 3. All joints shall be painted using
Bituminous paint to avoid corrosion.
B B

Pipe SJVNL Refer dwg no:


PH-C2-AR3-C01/R1
TB-3-405-316-001(01of02)
TB-3-405-316-001(02of02)
C
PH-AR3-BID-003 C

PH-AR3-BID-017
PH-AR3-BID-014
PH-AR3-BID-015
PH-AR3-BID-016
PH-AR3-BID-012
D
PH-AR3-BID-019 D

PH-C2-AR3-C23/R1
PH-C2-AR3-C21
PH-C2-AR3-C17/R1
PH-C2-AR3-C34
LEGEND
PH-C2-AR3-C35
PH-C2-AR3-C36
E PH-C2-AR3-C37 E

1 PH-C2-AR3-C38 1 75x10mm GI Flat


PH-C2-AR3-C39
Coating After Welding

Area To Clean Before Welding


F F

PROJECT:
To Be Connected With GROUNDING SYSTEM DESIGN OF ARUN-3, HEP
CLIENT:
G
Protective Bus SJVN Arun-3 Power Development Company(SAPDC) G

SAPDC'S CONSULTANT:
SJVN LIMITED
EARTHING CONSULTANT:
MANAV ENERGY PVT LTD®
Sheet.Size
NAME SIGN DATE TITLE
A3
DESIGN MANI 21/10 /'19 TYPICAL CONNECTION
CHKD. VIJAY 22/10 /'19 ARRANGEMENT FOR PIPE
APPD. NAVEEN 23/10 /'19
MANAV DWG NO: CID:400 SCALE PROJECTION

H
12/02 /'20 03
01/02 /'20 02
th
Updated as per comments received on 7 February 2020
Updated as per comments received on 3rd January 2020
VIJAY NAVEEN
VIJAY NAVEEN
MEPL/19-20/DWG/033 NTS H

Updated as per comments received on 15thand 28th


20/12 /'19 01
25/10 /'19 00
November 2019

INITIAL RELEASE
VIJAY NAVEEN
VIJAY NAVEEN
MANAV ENERGY PVT. LTD
DATE REV.NO. DESCRIPTION CHECKED APPROVED SUBMITTED FOR APPROVAL INFORMATION REFERENCE RECORDS CONSTRUCTION