“Design of 400/220kV

Sub-station”

Sanjay Chatterjee
27th April 2008 Srex Power India Private Limited
Includes

• Overview of 400kV sub-station

• Design Process

• Design considerations

• Question / Answer
Imp. considerations in substation design

• Safety of personnel and equipment


• Reliability and Security
• Adherence to
• Statutory obligations
– I.E. rules, Environmental aspects
• Electrical design considerations
• Structural design considerations
• Ease of maintenance
• Possibility to Expand
System parameters
Sr. Description 400kV 220kV
1. Nominal system voltage 400kV 220kV
2. Max. operating voltage 420kV 245kV
3. Rated frequency 50Hz 50Hz
4. Number of phases 3 3
5. System neutral earthing Effectively earthed
6. Corona Extinction voltage 320kV 156kV
7. Min. creepage distance 25mm/kV 25mm/kV
8. Rated short ckt. Current for 1 sec. 40kA 40kA
10. Radio interference voltage at 1MHZ (for 1000 mV 1000 mV
phase to earth voltage) (320kV) (156kV)
System parameters Contd..
Sr. Description 400kV 220kV Remarks
11. Rated insulation levels
i) Full wave impulse
withstand voltage
-- for lines 1550kVp 1050kVp
-- for reactor/ X’mer 1300kVp 950kVp
-- for other equipments 1425kVp 1050kVp
ii) Switching impulse 1050kVp
withstand voltage (dry/wet)
iii) One min. power freq.
withstand voltage (dry/wet)
-- for lines 680kV 460kV
-- for CB / Isolator 520kV 460kV (Line-ground)
610kV 530kV (open terminals)
-- for other equipments 630kV 460kV
Substation Bird’s view
400kV Circuit Breaker
400kV Isolator
400kV Current Transformer
400kV CVT
400kV Surge Arrester
Shunt Reactor & NGR
400/220 kV Auto Transformer
400kV Bus Post Insulator
Wave Trap
Functions of substation equipments
Equipment Function
1. Bus-Bar Incoming & outgoing ckts. Connected to bus-bar

2. Circuit Breaker
Automatic switching during normal or abnormal
conditions
Isolators
Disconnection under no-load condition for safety,
3.

isolation and maintenance.


Earthing switch To discharge the voltage on dead lines to earth
4.

5. Current Transformer
To step-down currents for measurement, control &
protection
Voltage Transformer
To step-down voltages for measurement, control &
6.

protection
Lightning Arrester To discharge lightning over voltages and switching
7.

over voltages to earth


Functions of substation equipments Contd…
8. Shunt reactor To control over voltages by providing reactive
power compensation
9. Neutral-Grounding To limit earth fault current
resistor
10. Coupling capacitor To provide connection between high voltage line &
PLCC equipment
11. Line –Trap To prevent high frequency signals from entering
other zones.
12. Shunt capacitors To provide compensations to reactive loads of
lagging power factors
13. Power Transformer To step-up or step-down the voltage and transfer
power from one a.c. voltage another a.c. voltage
at the same frequency.
14. Series Capacitor Compensation of long lines.
F unctions of Associated system in substation
System Function
1. Substation Earthing system To provide an earthmat for connecting
-- Earthmat neural points, equipment body, support
structures to earth. For safety of personnel
-- Earthing spikes
and for enabling earth fault protection. To
-- Earthing risers provide the path for discharging the earth
currents from neutrals, faults, Surge
Arresters, overheads shielding wires etc.
with safe step-potential and touch
potential.

2. Overhead earth wire shielding To protect the outdoor substation


or Lightning masts. equipment from lightning strokes.
3. Illumination system (lighting)
-- for switchyard
-- buildings
-- roads etc.
Contd..
4. Protection system To provide alarm or automatic tripping of
-- protection relay panels faulty part from healthy part and also to
-- control cables minimize damage to faulty equipment and
associated system.
-- circuit breakers
-- CTs, VTs etc.

5. Control cable For Protective circuits, control circuits,


metering circuits, communication circuits
6. Power cable To provide supply path to various auxiliary
equipment and machines.
7. PLCC system power line For communication, telemetry, tele-control,
carries communication system power line carrier protection etc.
-- line trap
-- coupling capacitor
-- PLCC panels
Contd…

8. Fire Fighting system To sense the occurrence of fire by


-- Sensors, detection system sensors and to initiate water spray, to
disconnect power supply to affected
-- water spray system
region to pin-point location of fire by
-- fire prot. panels, alarm system indication in control room.
-- watertank and spray system
9. Auxiliary standby power system For supplying starting power, standby
-- diesel generator sets power for auxiliaries
-- switchgear
-- distribution system
10. Telephone, telex, microwave, OPF For internal and external
communication
Basic drawings for design/construction
• Single Line Diagram

• General Arrangement Drawing

• Electrical Plan and Section

• Control Room Architectural layout


Supporting drawings
• Structural layout

• Earthmat layout

• Civil layout

• Erection Key Diagram

• Lighting Layout
Single Line Diagram – 220kV
General arrangement layout
00 0 90O0£ 0009 Oâ 00G8 000£000£ OOOZ’00â9'OOOZ OOOII 000600â12OOOOT 0000 0009 0090009

ZSOOH NH

dS3Y dS3Y

<t* '° * * ”Y°—”*


b010Y3b 1NflHS ”
Electrical Section
Control room layout

CABLE VAULT “*

ci 4

CIO Cg0 0g1

23 0 M M WIDE PASSAGE
Control room layout

Q +2.8u

' PCRE AYIN EAP A .

GENT3ST0 RATE

ELECTRO NIC TEST LAB


AHU ROOM

PANTRY

1 500 m m WI DE PASSAGE

c r LIBRARY
RECORD ROOM
' E X E C UTIV ES & STAFF/\| \{ STAFF , > DO ME SHAPE
Structural layout

0
' 0.80.8 O.8 O.B.BT 0.80.8T
4T

4T
4T
4T {4T
4T TH
0
0.8 4T '
4T ' 4T
0.8.8T GB
' 4T 4T
4T4T
4F4T 4T
41 4T
4T4T T/ GB TN
0. 0,8 TJ 0.8T0.8T
0.BTOBT r4T
4T 4T 4T 4
T’4T 4T4T
4T4T
4T 4T

4T 4T4T 4T4T 4T4T


4T 4T

’ 0. 0,8
8TD.8 OBTOBT 4T 8TR8T
4T 0.8T0.8T 4T
4T
4T
^!4T ^!4T
4T
4T
4T 4T
tT 4T 4 T 4T 474T
8T08T GB(i é
44Ok¥
0.6T0.6T .8T 0.8T
0.8T0.8T
Earthmat Layout

@
@
@

@
@

@
Civil layout

R _ _

cu CTC
C'I‘H CTH

BPI
1. 1

BP

gp,

E’n CTB iI
CA
&;&_
.!
ePl

RTI BPI

L1
Erection Key Diagram

4LA

4P3
4 D T Q B-1 4 D T Q B -1 4 D T Q B -1

4W

4W1
4P

4V

4C1

4C2
4SSTM-D 4SSTM-D 4SSTM-D

4I1

4I1

4I2
4B

4B
4I

4I

4I

4I

4I
4 D T T M -1 N1

4LA 4LA 4LA


4 D T T M -2 4 D T T M -1

4P3
4LA

4IC2
4W

4W1

4W1
R1 R1 R1
4P

4V

4C1

4C2
4I2

4I1

4I1

4I2
4B

4B
R2

4I

4I

4I

4I
4 D T T M -1 4 D T T M -2 4 D T T M -1

4P3
4LA

4IC1

4W1

4W1
4P

4V

4C1

4C2
4I2

4I1

4I1

4I2
4B

4B
4I

4I

4I

4I
4 D T T M -1 4 D T T M -2 4 D T T M -1
4LA

4P3
4W

4W1
4P

4V

4C1

4C2

4I1

4I2
4SSTM-D 4SSTM-D 4SSTM-D

4B

4B
4I

4I

4I

4I

4I
N1

4LA 4LA 4LA


4 D T T M -1

4I1
4 D T T M -2 4 D T T M -1
4LA

4P3

4IC2
4W

4W1

4W1
4P1
R1 R1 R1
4P

4V

4C1

4C2

4I1

4I2
4B

4B
R2

4I

4I

4I

4I
4 D T T M -1 4 D T T M -2 4 D T T M -1

4I24I2

4I14I1
4LA

4P3

4IC1

4W1

4W1
4P1
4P

4V

4C1

4C2

4I1

4I2
4B

4B
4I

4I

4I
4I
4 D T T M -1 4 D T T M -2 4 D T T M -1

4 D T Q B-2 4 D T Q B -2 4 D T Q B -2

EW 1 EW 1 EW 1

EW 2 EW2 EW 2 EW 2 EW 2 EW 2

4 S ST M -D
4 D T T M -1 4S2 4S2 4S2 4 D T T M -2 4 D T T M -1 4S2 4S2 4S2 4 D T T M -2
4 T1 4 T1 4T1 4 S 2 4 T M4 S 2
4 SS T M -T 4 S 1 4 S 1 4S1
4S1 4S1
4S1 4S14S1 4S1 4 SS T M -D
4S1
4S1
4 T B SM 4 T B SM 4 T B SM
4S14S1
4S1 4S1 4S1 4S1
4S1 4S1
4S1 4 I C2
4S1 4W4W R1
4 LA 4P 4V 4I4I 4LA 4P3 4I4I 4P14P1 4I24I1 4B 4B 4 C1 4 C2 4 I 1 4 I 2
4 S 14 S 14 S 14 IC1 4 IC2 4 I
Lighting Design
• Adequate lighting is necessary for safety of working personnel and O&M
activities

• Recommended value of Illumination level


• Control & Relay panel area - 350 Lux (at floor level)
• Test laboratory - 300 Lux
• Battery room - 100 Lux
• Other indoor area - 150 Lux
• Switchyard - 50 Lux (main equipment)
- 20 Lux (balance Area / road
@ ground level)
Single Bus arrangement
Single Bus System
Merits Demerits Remarks

1. Low cost 1. Fault of bus or any circuit 1. Used for distribution


breaker results in shut-down substations upto 33kV
of entire substation

2. Simple to Operate 2. Difficult to do any 2. Not used for large


maintenance substations.

3. Simple Protection 3. Bus cannot be extended 3. Sectionalizing


without completely de- increases flexibility
energizing substations
4. Can be used only where
loads can be interrupted or
have other supply
arrangements.
Main & Transfer Bus

M
T
TRANSFER CB
y LINE

MAIN &
TRANSFER BUS
ARRANGEMENT
Main & transfer busbar system

Merits Demerits Remarks

1. Low initial & ultimate 1. Requires one extra 1. Used for 110kV
cost breaker coupler substations where cost of
duplicate bus bar system
is not justified
2. Any breaker can be 2. Switching is somewhat .
taken out of service for complex when
maintenance. maintaining a breaker

3. Potential devices may 3. Fault of bus or any


be used on the main bus circuit breaker results in
shutdown of entire
substation.
Double Busbar arrangement

M—l
M—2

BUS COUPLER

DUPLICATE BUS BAR


ARRANGEMENT
Double Bus Bar Single Breaker system

Merits Demerits Remarks


1. High flexibility 1. Extra bus-coupler 1. Most widely used
circuit breaker necessary. for 66kV, 132kv,
220kV and
2. Half of the feeders 2. Bus protection scheme may
important 11kv,
connected to each bus cause loss of substation when it
6.6kV, 3.3kV
operates.
substations.
3. High exposure to bus fault.
4. Line breaker failure takes all
circuits connected to the bus out
of service.
5. Bus couplers failure takes
entire substation out of service.
Double Busbar with Double breaker
Double Bus Bar Double Breaker system

Merits Demerits Remarks


1. Each has two 1. Most expensive 1. Not used for usual EHV
associated breakers substations due to high
cost.
2. Has flexibility in 2. Would lose half of the 2. Used only for very
permitting feeder circuits circuits for breaker fault if important, high power,
to be connected to any circuits are not connected EHV substations.
bus to both the buses.
3. Any breaker can be
taken out of service for
maintenance.
4. High reliability
Double main & transfer

COUPLED

M—1
M—2

LINE

DOUBLE MAIN AND TRANSFER (DMT)


BUS ARRANGEMENT
Double main bus & transfer bus system
Merits Demerits Remarks

1. Most flexible in operation 1. High cost due to 1. Preferred by


three buses some utilities for
400kV and
2. Highly reliable
220kV important
3. Breaker failure on bus side breaker substations.
removes only one ckt. From service

4. All switching done with breakers


5. Simple operation, no isolator
switching required
6. Either main bus can be taken out
of service at any time for
maintenance.
7. Bus fault does not remove any
feeder from the service
One & half breaker scheme
One & half breaker scheme
Merits Demerits Remarks

1. Flexible operation for breaker 1. One and half 1. Used for 400kV
maintenance breakers per circuit, & 220kV
hence higher cost substations.
2. Any breaker can be removed 2. Protection and 2. Preferred.
from maintenance without auto-reclosing more
interruption of load. complex since middle
breaker must be
3. Requires 1 1/2 breaker per
responsive to both
feeder.
associated circuits.

4. Each circuit fed by two


breakers.
5. All switching by breaker.
6. Selective tripping
Ring Bus
Mesh (Ring) busbar system
Merits Demerits Remarks

1. Busbars gave 1. If fault occurs during bus 1. Most widely


some operational maintenance, ring gets separated into used for very
flexibility two sections. large power
stations having
2.Auto-reclosing and protection
large no. of
complex.
incoming and
3. Requires VT’s on all circuits outgoing lines
because there is no definite voltage and high power
reference point. transfer.
These VT’s may be required in all
cases for synchronizing live line or
voltage indication

4. Breaker failure during fault on one


circuit causes loss of additional circuit
because of breaker failure.
Minimum Clearances
400kV 220kV

1. Phase to Earth 3500 mm 2100 mm

2. Phase to phase 4200 mm 2100 mm


(Rod-conductor configuration)
4000 mm
(Conductor-conductor configuration)

3. Sectional clearance 6400 mm 4300 mm


Clearance From any point on
quired to stand. (Measured

INDICATES 8 E CTION CLEARANCE


INDICATESGROUND CLEARANCE
ATOR

ROUND

///X/ ///t\ ///N/

INDICATE S DISTANCE S NOT LESS THAN ECTI ON


CLEARANCE INDICATES DISTANCE S NOT LESS THAN GROUND
CLEARANCE

CLEARANCE FOR MAINTENANCE OF AP PARATUS


50) 699Z

08Z
Clearance Diagram

OOZE
6998
Bus Bar Design

• Continuous current rating. Ampacity caculation as per IEEE:738

• Short time current rating (40kA for 1 Sec.) IEC-865

• Stresses in Tubular Busbar

• Natural frequency of Tubular Busbar

• Deflection of Tube

• Cantilever strength of Post Insulator

• Aeolian Vibrations
Gantry Structure Design

• Sag / Tension calculation : as per IS: 802 1995

Sr. Temp Wind Pressure Limits


1. Min. No wind

2. Min. 36%

3. Every Day No wind T <= 22% of UTS

4. Every Day 100% T <= 70% of UTS

5. Max. No wind Clearances


(ACSR 750C/ AAAC 850C)
Contd..
• Short Circuit Forces calculation
As per IEC : 865
Short circuit forces during short circuit
Short circuit forces after short circuit
Short circuit forces due to “Pinch” effect for Bundled conductor
Spacer span calculation

• Factor of safety of 2.0 under normal condition and 1.5 under short circuit
condition
spacers
Spacer span Vs Short Ckt. forces
CONDUCTOR TENSION PER PHASE IN KG.

GRAPH OF SPACER SPAN Vs CONDUCTOR TENSION FOR


400 KV TWIN MOOSE ACSR CONDUCTOR

12000.00

10000.00

8000.00

6000.00

4000.00

2000.00

0.00
0 2 4 6 8 10 12 14
SPACER SPAN IN MTRS.
Earthing Design

• Guiding standards – IEEE 80, IS:3043, CBIP-223.


• 400kV & 220kV system are designed for 40kA.
• Basic Objectives:
• Step potential within tolerable
• Touch Potential limit
• Ground Resistance

• Adequacy of Ground conductor for fault current


(considering corrosion)
Touch and step potential

ESX CURVE

EM

X -
I . MAN TOUCHING FAULTE D STRUCTURE AT ’a’ AND BETS TOUCH POTENTIAL Et
8. LAN STAND ING ON GROUND AND GETS STEP POTENTIAL Es
Lightning Protection – Ground Wire

FIG-4a FIG-4b
Lightning Protection – Lightning Mast