Sie sind auf Seite 1von 59

Sky Bus metro

moves people and cargo too!


At 100 kmph along existing roads &
aesthetically, without demanding road space!
Better performance than underground metro
at one-fourth cost & up and ready in two years
Futuristic automated driver –less operations!
By
“Technically sound..” Konkan Railway Corporation Ltd.,

Dr. APJ Abdul Kalam Er. B. Rajaram M.Tech., IRSE, FIE., FNAE

Inventor &Former Managing Director


Sky Bus

What a city needs


 To decongest and eliminate pollution on
roads:
 People: Rapid mass transit systems
 Goods : deliver trucks/ containers
 Services: City house keeping-automation
 Integrated system-with financial viablility.

RUBBER_TYRED systems like mono-rails do not compare with


Steel-wheel on steel rail technology
2
Sky Bus
Skybus is the solution to the safety
concerns of railway Dr Abdul Kalam and a number
Of eminent scientists including
Commissioner of Railway Safety
Confirm Skybus is a
safer railway technology

Conventional Railways Evolution into Skybus

Problem-bogie and Solution-Positive hold


coaches detach, and go between tracks and railway
hay-wire bogie
USA granted patents to Mr.B. Rajaram
3
Sky Bus
No derailments No capsizing nor
crushing of passengers in Skybus
Case of collision-Skybus is not
Derailment arrestors at top Crushed.

Std.Rly bogie

Rly. track
Unique safety features not available in other metro rails.

4
Sky Bus

High wind loads –risk of toppling


Skybus is safer- swing arrestor Conventional Railway
And positive hold with track protect Has no such feature-
passengers Just topples

5
Sky Bus

Skybus conserves urban space


20m length for 2 Sky-coaches Elegant small stations at 6m
Carry 300 to 400 pax Height above road-access from
No complicated station yards Footpaths.

Air-conditioned service every ONE minute


6
Skybus carries cargo & adds Sky Bus

valuable urban space…


Standard containers For every km route 9000 sq.m
delivered Space added on top all along.

Conventional metro rails cannot do this.


7
World’s First test track at Goa proves our
Sky Bus
India’s Skybus is superior
to other metro rails
( A freak accident in an experimental trial demonstrated
conclusively the stated safety features unique to the Skybus)

Independent RDSO ( Ministry of Railways) team and Bhaba Atomic


Research Centre measured the values
Speed Braking Vertical Transverse Longitudinal
Distance
meters
Kmph Max accn g RI Max accn g RI Max accn g RI
60 136 0.036 1.703 0.026 1.788 0.052 2.136
70 174 0.122 2.692 0.04 2.003 0.077 2.395
Excellent Excellent Excellent Excellent Excellent Excellent
Permissible limits Max.Acceleration 0.3g going upto 0.35 g if no resonance is observed.
Ride Index (RI): 3.25 normal , can go upto 4.0 for EMU and DEMU

Since Ministry of Railways classified Skybus as NOT Railway,


State has to notify authority under the Tramway Act 18xx,(existing),
For issue of safety certificate, by a Government Safety Commissioner.
8
How do we compare different Sky Bus

options?
Monorail can never be an option because it is rubber tyre-based , lacking the
advantages of high speeds and mass loading, which is possible in steel-wheel/steel rail
based system only.
System Skybus Metro Elevated Metro Rail Under-ground Metro
Attribute Virtually min.land Land/buildings hurt Buildings-foundns
Capital cost per 10 km 550 1200 2500
in Rs crores

Passenger Capacity 20,000-40,000 20,000-40,000 20,000-40,000


pphpd Can go to 80,000
Cargo 60 TEU per hour per NIL NIL
direction

Fares-to meet financial 50 ps per km –at Rs NOT possible to meet White elephant- cannot
viability 250 per month for viabilty be managed.
500km.
Additional revenue Yes –between stations NIL-between stations NIL
from Skytop- bet.stns.
90,000 sqm
9
Hyderabad Sky Bus
Skybus
Metro
Details of Routes:
Length of Route
S.No Route No. From to
(km)
1 Route No. 1 JNTU College M.G.Bus Stand 16.2
2 Route No. 2 M.G.Bus Stand Vanastalapura 9.6
3 Route No. 3 Panjagutta Hitech Citi 7.2
4 Route No. 4 Vivekananda Nagar Jn. Secunderabad 10.5
5 Route No. 5 Paradise M.G.Bus Stand 8.7
6 Route No. 6 Secunderabad M.G.Bus Stand 7.2
7 Route No. 7 Ameerpet Paradise 4.8
8 Route No. 8 Balanagar Jidimetla 6.0
Total km 70.2

Hyderabad can have Skybus


without Government funding
1. Notify the the Tramway Act
2. Concession agreement with
BOT- operator M/S Doxport
Technologies-Malaysia
First pilot project of 15 km
10 can be ready, in 24 months.
Sky Bus Technology

By
S.Ramya,
R.Priyadharshini,
Civil II year.
1. Standard two axle bogies can be used in
metros for speeds of 100 kmph (but can
have higher speeds if required, upto 160
INTRODUCTION:
kmph) of standard gauge.
SkyBus is a greener way to
travel. When delegates choose to travel on
SkyBus between the Airport and the city
2. Linear Induction motor technology is
they all leave a smaller carbon footprint.
incorporated with 4 th rail driving, which is
SkyBus supports Green fleet and plants over
above the bogie and 3 phase AC motors with
7,000 trees each year to offset carbon
regenerative power capability are used.
emissions from its fleet’s fuel consumption.
Sky Bus operates 24 hours/7 days a week-
3. Third Rail is used for current collection.
over 250 trips a day moving in excess of two
million passengers.
4. Braking – Since the bogie is mounted, 3
levels of braking namely – Regenerative,
disc brakes and finally, Emergency
CONSTRUCTION OF SKYBUS mechanical brakes are provide to ensure the
TECHNOLOGY safety of commuters.
With no signaling and having no points and
crossings, it is a unique mass-transit system Sky Coaches
that can be put up within two years in any 1. These are double walled light shells
crowded & congested city. with large wide windows suspended from
Since it operates along existing roadways the sky bogies.
and within municipal limits.
The main components of the sky 2. Controlled banking on curves is
bus system are described below: possible. Curves with radii of 50 m. can be
negotiated.
Sky way
1. The sky way consists of a concrete box 3. The coaches are air conditioned and
fixed with automatic doors.
structure 8.4 X 2.4 m. carried over a series
of piers at a height of 9 – 10 m. above the 4. They have audio visual information
existing road level. to assist the passengers.
2. In the middle of the roadway, pile 5. They also have special 4 m. wide
foundations support 1 m. diameter columns sliding doors for quick entry and exit of
approximately 8 m. high, and at a spacing of passengers.
15 m. all along the roadway.
6. Each pair of coaches carries 300
3. It has two heavy 52 – 60 kg. / Metre rails persons and service every one minute or 30
fixed with appropriate fastenings within seconds is possible.
theconcrete box support at standard gauge
Sky Stations
that guide the sky bogie.
1. Unlike conventional mass transit
systems, Sky Bus needs smaller stations
Sky Bogie about 50 m. long.
persons/sq.m density peak. The 20 m units
2. Stations are available at every 1 km. can be attached to form a 3 unit, 60m long
It is a natural footbridge across the road. train of 1200 persons capacity.
From up line to down line the station
provides natural access, which is easy. •Signal & train control:
Simple three aspect signal system driven by
3. Service is available at every 30 line of sight by motorman, with additional
seconds or 1 minute, which means virtually unique safety layer of Raksha Kavach,
no waiting time for passengers. capable of providing 40 sec headway- but
planned 60 sec.
4. Totally automated without drivers,
access control is electronic by prepaid cards •Route Capacity:
being swiped in. A Sky bus route can thus be designed even
at 60 sec headway, to carry 20,000 to 70,000
5. Stations act only as an access passengers per hour per direction in peak
facility, and not as passenger holding area. period.

SALIENT POINTS ABOUT •Security and safety:


SKYBUS METRO SYSTEM Continuous computerized central monitoring
• Standard Gauge Rail tracks : & control with provision of audio/visual
60 kg rails fitted with double elastic access for each coach for security.
fastenings, with Standard Gauge on sleepers Distributed intelligence systems with
designed & tested for 20 t axle load norms redundancy to provide protection against
forming maintenance free tracks. swinging under wind loads/emergency
• Driving bogies: localized control/ prevent over-loading/
100 kmph standard gauge 12 ton/14 ton axle emergency evacuation guidance.
load powered bogies –same as used in metro
rails with 4×110/115 Kw asynchronous 3 ph •Easy Access:
AC motors with power-regeneration and Access is from existing footpaths, climb
capable of peak 1.3m/sec/sec acceleration. limited to 6 m for passengers- within 500 to
•Braking: 600m from wherever you are on the road
Electrical re-generative braking, coupled having Sky bus route.
with compressed air disk mechanical brakes • On line maintenance of rolling
and emergency/ idling mechanical brakes stock and tracks:
for stabling. Maintenance is through continuous
•Crushing load for underframe : monitoring of vibration signatures, and
Underframe- fit to take crush loads of directed by need automatically by
regular main line coaches- more than 70t. computerized systems- much more advanced
•Train unit: than existing manual inspections only and
Each train unit 20m long with two driving periodic checks. All the sub-systems
buses connected through vestibule door. /elements are to existing
UIC/Indian Railway codal practices
•Capacity of 20m long train unit: applicable to railway transport.
Each Sky bus unit 20m long having two
compartments ( 3.25m x 9.5m) of 9.5 m , •Power requirements:
can carry almost 400 persons at 7
Typically for tropical climate conditions, for is the “political will” to give it the go-ahead,
a module of 10 km route, 15 MW power the committee feels that it’s the
needed covering traction and all services development, testing and validation that will
including comfort air-conditioning loads at take time.
stations. A senior official of the Urban Development
ministry, under which falls urban transport,
INVENTION OF SKYBUS GOA says, “Many things still need to be sorted
The Skybus Metro project was former PM A out. We have set up a committee to look into
B Vajpayee’s New Year gift to Goa in 2003. the techno-feasibility of the project. Trial
The pilot project was to connect Mapusa to runs have been conducted. It will take time.”
Panaji. It was supposed to be a 10.5 km
route in the first phase. Rajaram’s concept The committee’s findings say, “It may take
got a nod from the PMO in May 2003. some more time as the Skybus system so far
developed at the test track site at Goa is still
Accordingly, trial runs were conducted at a in the developmental phase.”
1.6 km long test-track at Madagaon, Goa,
with grant of Rs 50 crore from the Railways. The Railways too have objected to it. The
However, a mishap occurred during the trial gauge used for the Skybus system is
raising serious concerns about passenger standard while the railway ministry has said
safety, forcing the committee to re-evaluate the KRC was requested to test the system on
the system. More detailed trials as per test broad-gauge. As it can’t comment on the
schemes under empty, loaded and worn out safety aspect of the standard gauge Skybus
conditions upto 100 kmph are yet to be system, it says it won’t be in a position to
conducted. give certification. “There are other issues
Rajaram says the safety norms are as per regarding safety integration, signalling
those laid out by the Chief Commissioner of system and capacity which were being
Railway Safety (CCRS). “We have already looked into by the committee,” says the
tested at 70 kmph,” he says, adding there official.
was no question of gauge conversion as it
was not a rail-guided system. He feels the Quickly, reputable and also economical
high cost of the project — approximately Rs transport by Hyderabad packers as well as
5,400 crore — is giving the government cold movers. There are many arising business on
feet. the planet of logistic; to fulfill the current
higher need of it. Rising need of logistics
NEW DELHI broke the ice for brand-new contestants in
It was launched with great fanfare some two the logistic market. Business are producing
years back with the promise of giving India specialized solutions for the targeted
a world-class Skybus Metro. But like other customers. These companies are delivering
ambitious NDA projects, this one too is individualized services to woo its clients.
facing roadblocks. Every business claim to be most effectively
A government committee has recorded that in this domain name, yet only few come to
it may take about two years to develop the fulfill the assumptions when they are
track and get other clearances. While the examined. Packers and movers Hyderabad
man behind the Skybus concept, B Rajaram, deliver its customers full transport and
former MD of the Konkan Railway reallocation solution. This provider is
Coporation (KRC), feels all that is required working in India as well as overseas from a
long time. Its existence in the
systematizations globe has quipped with the
every talk of logistics society. It knows the
best ways to offer its customers with
greatest solution possible.

ADVANTAGES OF SKYBUS
• Fast transportation
• No land acquisition problem.
• No demolition
• No Vandalism
• Fire Protection
• No Deaths
• Lowest Operational cost.
• No interference with normal road traffic
• Better Capacity
• Flyover
• Fast Execution
• No Pollution
• No Force Major
• No traffic Jams, No waiting

CONCLUSION AND
RECOMMENDATION
The Skybus is the technology breakthrough
that India has achieved. Skybus is an
improved railway technology, eliminating
the problems of existing metro rail systems,
like, derailments ollisions, and capsizing
crushing people. Old conventional railway
men, who remained basically operating and
maintenance experts, may take a little time
to appreciate, but the fact remains Sky bus is
an improved railway technology eliminating
their fears of derailments and capsizing from
which they suffered for decades!

Financially Skybus Metro makes urban


transport a dream come true for
administrators- virtually free gift to people
without Government fund in.
Sky
Bus
technology
By
S.Ramya
CIVIL-II Yr

Das könnte Ihnen auch gefallen