DEAD LOAD CRITERIA DEAD LOAD COMPUTATIONS

A. CEILINGS AND UTILITIES A. SECOND FLOOR


Wood furring suspensions ----------------------------------------------------- 0.12 KPa
Plaster on Concrete -------------------------------------------------------------- 0.24 KPa FOR S2-1
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Plumbing ------------------------------------------------------------------------ 0.0375 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
B. COVERINGS, ROOF AND WALL TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement tile ------------------------------------------------------------------------ 0.77 KPa FOR S2-2
6’’ Exterior CHB Wall (Plastered both sides) ------------------------------- 2.70 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
4” CHB Interior Wall (Plasteredboth sides) -------------------------------- 2.10 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
C. FLOOR FILL TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
FOR S2-3
D. FLOOR AND FLOOR FINISHES Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm)----------------------------------------------- 0.77 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------- 0.57 KPa
E. FRAME WALLS TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa
Windows, glass, frame and sash --------------------------------------------- 0.38 KPa
Doors ------------------------------------------------------------------------------- 0.40 KPa FOR S2-4
Railings ----------------------------------------------------------------------------- 0.30 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
F. FRAME PARTITIONS Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa Wood studs, plastered (two plastered) ------------------------------------- 0.57 KPa
TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa

FOR S2-5
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa
TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa

FOR S2-6
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S2-13
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 2.1355 KPa Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
FOR S2-7 TOTAL LOAD PRESSURE------------------------------------------------------- 1.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S2-14
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical --------------------------------------------------------------------------- 0.0125 KPa
FOR S2-8 TOTAL LOAD PRESSURE-------------------------------------------------------- 1.5655 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S2-15
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical --------------------------------------------------------------------------- 0.0125 KPa
FOR S2-9 Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 0.843 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S2-16
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
FOR S2-10 Electrical --------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 0.843 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa FOR S2-17
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-11 Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 0.843 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa
FOR S2-18
FOR S2-12 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.603 KPa
FOR S2-19 Electrical ------------------------------------------------------------------------ 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa FOR S2-26
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
FOR S2-20 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Ceramic or Quarry Tile (20mm)----------------------------------------------- 0.77 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa
FOR S2-27
FOR S2-21 Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-22 FOR S2-28


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-23 FOR S2-29


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-24 FOR S2-30


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
TOTAL LOAD PRESSURE ---------------------------------------------------- 1.56655 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
FOR S2-25
Stone Concrete ------------------------------------------------------------------ 0.023 KPa FOR S2-31
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa TOTAL LOAD PRESSURE ------------------------------------------------------- 1.853 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
FOR S2-38
FOR S2-32 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.853 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-39
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-33 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-40
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-34 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-41
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-35 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-42
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-36 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa FOR S2-43
TOTAL LOAD PRESSURE ------------------------------------------------------- 1.853 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
FOR S2-37 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa
B. THIRD FLOOR Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-1
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-7
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-2
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-8
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-3
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-9
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-4
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-10
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-5
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-11
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-6
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-12
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S3-18
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
FOR S3-13 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.8115 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S3-19
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
FOR S3-14 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-20
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-15 Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-21
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-16 Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-22
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-17 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa FOR S3-23
Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ----------------------------------------------------------------------- 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-29
FOR S3-24 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-30
FOR S3-25 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-31
FOR S3-26 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-32
FOR S3-27 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-33
FOR S3-28 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-39
Plywood ----------------------------------------------------------------------------- 0.006 KPa
FOR S3-34 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-40
Plywood ----------------------------------------------------------------------------- 0.006 KPa
FOR S3-35 Stone Concrete -------------------------------------------------------------------- 0.023 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.859 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa FOR S3-41
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-36 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-42
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S3-37 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-43
Railings ------------------------------------------------------------------------------ 0.30 KPa Stone Concrete ---- --------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa Cement Finish (25mm) on Stone Concrete fill ----------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
FOR S3-38 TOTAL LOAD PRESSURE--------------------------------------------------------- 1.5655 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
LIVELOAD CRITERIA LIVELOAD COMPUTATIONS

Classroom --------------------------------------------------------------- ------------- 1.90 kPa A. FOR SECOND FLOOR


Corridors above Ground Floor -------------------------------------- ------------ 3.80 kPa
Fire Exit ------------------------------------------------------------------- ------------ 4.80 kPa FOR S2-1
Rest Room -------------------------------------------------------------- ------------ 2.40 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
Stairs ---------------------------------------------------------------------- ------------ 4.79 kPa TOTAL LOAD PRESSURE ---------------------------------------------------------- 2.40 kPa
Office Use ---------------------------------------------------------------- ----------- 2.40 kPa
Computer Use ----------------------------------------------------------- ---------- 4.80 kPa FOR S2-2
Stack Room -------------------------------------------------------------------------- 7.20 kPa Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
Laboratories -------------------------------------------------------------- ---------- 2.90 kPa TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-3
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-4
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-5
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-6
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-7
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ----------------- 1.90 kPa

FOR S2-8
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-9
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa
FOR S2-10 FOR S2-20
Classroom -------------------------------------------------------------------------- 1.90 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa

FOR S2-11 FOR S2-21


Classroom -------------------------------------------------------------------------- 1.90 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa

FOR S2-12 FOR S2-22


Classroom -------------------------------------------------------------------------- 1.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-13 FOR S2-234


Classroom -------------------------------------------------------------------------- 1.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-14 FOR S2-25


Stack Room ------------------------------------------------------------------------ 7.20 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 7.20 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-15 FOR S2-26


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-16 FOR S2-27


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-17 FOR S2-28


Office Use -------------------------------------------------------------------------- 2.40 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Laboratories ----------------------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 5.30 kPa
FOR S2-29
FOR S2-18 Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Rest Room -------------------------------------------------------------------------- 2.40 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.40 kPa
FOR S2-30
FOR S2-19 Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Office Use ----------------------------------------------------------------------------- 2.40 kPa Fire Exit -------------------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE ------------------------------------------------------------ 2.40 kPa TOTAL LOAD PRESSURE --------------------------------------------------------- 8.60 kPa
FOR S2-31 FOR S2-41
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-32 FOR S2-42


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa Stairs ----------------------------------------------------------------------------------- 4.79 kPa
TOTAL LOAD PRESSURE ----------------------------------------------------------- 8.59 kPa
FOR S2-33
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa FOR S2-43
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Stairs ----------------------------------------------------------------------------------- 4.79 kPa
FOR S2-34 TOTAL LOAD PRESSURE ----------------------------------------------------------- 8.59 kPa
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-35
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-36
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-37
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-38
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-39
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-40
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa
B. FOR THIRD FLOOR TOTAL LOAD PRESSURE ----------------------------------------------------------- 1.90 kPa

FOR S3-1 FOR S3-10


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-2 FOR S3-11


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-3 FOR S3-12


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-4 FOR S3-13


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-5 FOR S3-14


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-6 FOR S3-15


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ---------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ---------------------------------------------------------- 4.80 kPa

FOR S3-6 FOR S3-16


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ----------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 4.80 kPa

FOR S3-7 FOR S3-17


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ----------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 4.80 kPa

FOR S3-8 FOR S3-18


Classroom -------------------------------------------------------------------------- 1.90 kPa Office ----------------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 2.40 kPa

FOR S3-9 FOR S3-19


Classroom -------------------------------------------------------------------------- 1.90 kPa Rest Room ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa
FOR S3-20 FOR S3-30
Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-21 FOR S3-31


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-22 FOR S3-32


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-23 FOR S3-33


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-24 FOR S3-34


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa

FOR S3-25 FOR S3-35


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor ---------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa

FOR S3-26 FOR S3-36


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor -------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-27 FOR S3-37


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-28 FOR S3-38


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Fire Exit ----------------------------------------------------------------------------- 4.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.60 kPa
FOR S3-39
FOR S3-29 Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa
FOR S3-40 STAIR 1: FIRST FLOORSTAIRS TO SECOND FLOOR
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa

FOR S3-41
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa

FOR S2-42
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Stairs --------------------------------------------------------------------------------- 4.79 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.59 kPa

FOR S2-43
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Stairs --------------------------------------------------------------------------------- 4.79 kPa KN
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.59 kPa W LANDING =(1.3 m)(0. 2 m)(4 m)(23. 6 )
m3
¿24 . 544 KN

W RAILING=(2. 7 m)(0 .3 KPa)


¿ 0 .81 KN
1 KN
W STAIRS ={[0 . 2 mx3 . 191 m]+[ x 0. 18 mx 0 .27 mx 10]}{1 . 3 mx 23. 6 3 }
2 m
¿ 27 .04 KN
29 .95
R2 =
4
∑M @R 1
=0
¿7 . 49 kN /m
;

22. 411
R1 =
4
∑M @ R 2
=0
¿ 5. 60 kN /m
;
STAIR 2: SECOND FLOOR STAIRS TO THIRD FLOOR 20 .734
R2 =
LANDING 4
∑M @ R 2
=0
¿ 5. 18 kN /m
;

STAIR 3: SECOND FLOOR LANDING TO THIRD FLOOR


STAIRS

KN
W LANDING=(1.3 m)(0. 2 m)(4 m)(23. 6 )
m3
¿24 . 544 KN

W RAILING=(2. 7 m)(0 .3 KPa)


¿ 0 .81 KN
1 KN KN
W STAIRS ={[0 . 2 mx3 . 041 m]+[ x 0 .14 mx 0. 27 mx 10 ]}{1. 3 mx 23 . 6 3 } W LANDING =(1.3 m)(0. 2 m)(4 m)(23. 6 )
2 m m3
¿ 24 . 46 KN ¿24 . 544 KN
29 .08
R2 = W RAILING=(2. 7 m)(0 .3 KPa)
4
∑M @R =0 ¿ 0 .81 KN
1 ¿ 7 . 45 kN /m
; 1 KN
W STAIRS ={[0 . 2 mx3 . 36 m ]+[ x 0 .142 mx 0 . 931 mx14 ]}{1. 3 mx 23 .6 3 }
2 m
¿ 26 .50 KN
29 .77 (2.7 )(8 x 3 . 4)−[(0 .9 x 1 .3 x 6 )(0.38 )+(2 .1 x 1)(0 .4 )]
R2 = Weight wall =
4 4
∑M @R 1
=0
¿ 7 . 44 kN /m  17.4831KN / m
;
5. For 4” CHB exterior (plastered both sides) without doors and
22. 084
R2 = windows @ 4x4 m Slab
4
∑M @ R =0 (2. 1)( 4 x 3 . 4 )
2 ¿ 5. 52 kN /m Weight wall =
;
4
 7.14 KN / m
WEIGHT OF WALLS DIRECTED TO BEAMS
6. For 6” CHB exterior (plastered both sides) without doors and
1. For 6” CHB exterior (plastered both sides) without doors and
windows @ 4x4 m Slab
windows @ 4x8 m Slab
(2. 7 )(4 x 3 . 4 )
(2. 7 )(8 x3 . 4 ) Weight wall =
Weight wall = 4
8  9.18KN / m
 9.18KN / m
7. For 6” CHB exterior (plastered both sides) with doors @ 4x9 m
2. For 6” CHB exterior (plastered both sides) with doors and
Slab
windows @ 4x8 m Slab
(2. 7)(9 x3 . 4 )−(2. 1x 1)(0. 4 )
(2. 7 )(8 x3 . 4 )−(0 .9 x1. 3 x 6 )(0. 38 ) Weight wall =
Weight wall = 9
4  9.09 KN / m
 17.6931KN / m
8. For 6” CHB exterior (plastered both sides) with windows @ 6x8
3. For 4” CHB exterior (plastered both sides) without doors and
m Slab
windows @ 4x8 m Slab
(2. 7 )(6 x 3 . 4 )−(0 .85 x 1 . 3 x 12)(0 . 38)
(2. 1)( 8 x 3. 4 ) Weight wall =
Weight wall = 6
8  8.3402 KN / m
 7.14 KN / m
9. For 6” CHB exterior (plastered both sides) with doors @ 4x9 m
4. For 6” CHB exterior (plastered both sides) without doors and
Slab
windows @ 4x8 m Slab
(2. 7)(8 x3. 4)−(2.1 x 1)(0. 4 )
Weight wall =
8
 6.78KN / m

10. For 6” CHB exterior (plastered both sides) with windows @ 4x8
m Slab
(2. 7 )(4 x 3 . 4 )−(0 . 85 x 1 .3 x 6)(0 . 38)
Weight wall =
4
 8.55015 KN / m
SECOND FLOOR SUMMARY:
SLAB FLOOR AREA (m2) DEAD LOAD LIVE LOAD
REFERENCE
PRESSURE (kPa) WEIGHT (KN) PRESSURE (kPa) WEIGHT (KN)

S2-1 32 1.5655 50.096 2.40 76.8


S2-2 32 1.5655 50.096 1.90 60.8
S2-3 32 2.1355 68.336 1.90 60.8
S2-4 32 2.1355 68.336 1.90 60.8
S2-5 32 2.1355 68.336 1.90 60.8
S2-6 32 2.1355 68.336 1.90 60.8
S2-7 32 1.5655 50.096 1.90 60.8
S2-8 32 1.5655 50.096 1.90 60.8
S2-9 32 1.5655 50.096 1.90 60.8
S2-10 32 1.0125 32.4 1.90 60.8
S2-11 32 1.0125 32.4 1.90 60.8
S2-12 32 1.0125 32.4 1.90 60.8
S2-13 32 1.0125 32.4 1.90 60.8
S2-14 32 1.5655 50.096 7.20 230.4
S2-15 32 0.843 26.976 2.90 92.8
S2-16 32 0.843 26.976 2.90 92.8
S2-17 32 0.843 26.976 5.30 169.3
S2-18 16 1.603 25.648 2.40 38.4
S2-19 16 0.8055 12.888 2.40 38.4
S2-20 48 0.8055 38.664 2.40 115.2
S2-21 32 0.8055 25.776 2.40 76.8
S2-22 10.4 1.8655 19.4012 3.80 39.52
THIRD FLOOR SUMMARY:
SLAB FLOOR AREA (m2) DEAD LOAD LIVE LOAD
REFERENCE
PRESSURE (kPa) WEIGHT (KN) PRESSURE (kPa) WEIGHT (KN)

S2-1 32 1.5715 50.288 1.90 60.8


S2-2 32 1.5715 50.288 1.90 60.8
S2-3 32 1.5715 50.288 1.90 60.8
S2-4 32 1.5715 50.288 1.90 60.8
S2-5 32 1.5715 50.288 1.90 60.8
S2-6 32 1.5715 50.288 1.90 60.8
S2-7 32 1.5715 50.288 1.90 60.8
S2-8 32 1.5715 50.288 1.90 60.8
S2-9 32 1.5715 50.288 1.90 60.8
S2-10 32 1.5715 50.288 1.90 60.8
S2-11 32 1.5715 50.288 1.90 60.8
S2-12 32 1.5715 50.288 1.90 60.8
S2-13 32 1.5715 50.288 1.90 60.8
S2-14 32 1.5715 50.288 1.90 60.8
S2-15 32 1.5715 50.288 4.80 153.6
S2-16 32 1.5715 50.288 4.80 153.6
S2-17 32 1.5715 50.288 4.80 153.6
S2-18 16 0.8115 12.984 2.40 38.4
S2-19 16 0.849 13.584 2.40 38.4
S2-20 48 0.849 40.752 2.90 139.2
S2-21 32 0.849 27.162 2.90 92.8
S2-22 20 1.8715 37.43 3.80 76
TOTAL DEAD LOAD OF THE BUILDING : 2694.52855 KN

TOTAL LIVELOAD OF THE BUILDING : 5152.786 KN7

SEISMIC LOAD COMPUTATION

Design Base Shear (Equation 208-4)


C IW
V= v t
RT
The total design base shear need not to exceed the Equation 208-5.
2. 5 C a IW t
V=
R
The total design base shear shall not be less than Equation 208-6.
V =0.11C a IW t
For Seismic Zone 4, it shall not be less than the Equation 208-7.
0 . 85 zN v IW t
V=
R
Where:

Cv - is the seismic coefficient, as set forth by Table 208-8


I - importance factor given in Table 208-1
R - numerical coefficient representative of the inherent overstrength and global ductility capacity of lateral-force-resisting systems, as set forth
in Table 208-11 or 208-13
T - elastic fundamental period of vibration of the structure in the direction under consideration
Ca - seismic coefficient, as set forth in Table 208-7
Z - seismic zone factor as given in Table 208-3
Nv - near-source factor used in the determination of Ca in Seismic Zone 4 related to both the proximity of the building or structure to known
faults with magnitudes as set forth in Tables 208-5 and 208-6
W - the total seismic dead load defined in Sections 208.5.1.1 and 205.5.2.1

A. For occupancy Category use (Section 208.2.2) Type C


- Building used for College SD – Stiff Soil
-Special Occupancy Structures
I = 1.00 LOCATION: 8 km from Taboan River Fault
Ca = 0.44Na ; Na= 1
B. For R use (Table- 11A) Cv= 0.64Nv ; Nv= 1
- Basic Seismic Force Resisting System
-Moment Resisting Frames
-Ordinary Reinforced Concrete Moment Frames
R = 8.5 E.
1. Total Design Base Shear

C. For Elastic Fundamental Period of Vibration (Section 208.5.2.2) C v IW t


V=
T= CT (hn) 3/4 RT
Where: CT= 0.0731; for Reinforced Concrete (0 .64 )(1)(1)
Hn= 14.41 m V= (2694 . 52855)
(8 .5)(0 . 442)
=459.01 KN
T= (0.0731) (14.41)3/4
T= 0.541 seconds
2. The Total Design Base Shear shall not exceed:

D. For Seismic Coefficient (Ca) 2. 5 C a IW t


Seismic Coefficient Z= 0.4 (Zone 4) V=
R
2 .5 (0 .44 )(1 )(14214 .9573) F. The concentrated force Ft at the top, which is in addition to Fn, shall
V=
8.5 be determined from the equation:
=348 .70KN
Then use 348.70 kN
FT =0.07TV
¿0.07 (0.442)(107.78)
3. The Total Design Base Shear shall not be less than: ¿3.33 KN

V =0.11C a IW t G. The remaining portion of the base shear shall be distributed over the
height of the structure, including Level n, according to:
Wx (kN) hx (m) Wxhx Fx (V −F t )W x h x
Fx=
1083.8108 10.6 11488.39448 46.37+3.33 ∑ W i hi
1379.0013 7 9653.0091 38.97
1315.52725 3.6 4735.8981 19.11
TOTAL 25895.30168 kN 107.78 kN
V =0.11(0.44)(1)(14214.9573 )
=130 .42 KN

4. In addition, for Seismic Zone 4, the total base shear shall


also not be less than:

0 . 85 zN v IW t
V=
R
0 .85(0.4)(1)(1)(14214 .9573 )
V=
8 .5
=107 .78 KN