MdeO Excavacion Pilas Conglomerado 0-2m M3 0.00 -67.23 6.16 29,545.00 29,825.68 181,924
T1 OE-15
MdeO Excavacion Pilas Conglomerado 2-4 m M3 0.00 -70.60 6.47 39,897.00 40,276.02 257,951
T1 OE-16
MdeO Traslado de Equipo (Tapas Metálicas -
UND 0.00 -520.00 1,000.00 1,009.50 0
T1 OE-17 Alineadores)
T1 OE-18 MdeO Excavacion Vigas de Fundación M3 0.00 -199.28 34,670.00 34,999.37 0
T1 49 MdeO Figuración Hierro KG 12,000.00 11,101.60 898.40 410.10 414.00 368,434
T1 51 MdeO Sacada de Piedra UND 200.00 170.00 30.00 6,000.00 6,057.00 180,000
SUBTOTAL 28,929,784
MAS IVA 19% SOBRE UTILIDAD DEL 5% 274,833
RETENIDO (12%) 3,471,574
VALOR NETO A PAGAR CON ESTA ORDEN 25,733,043
CONSTRUCTORA CASA S.A - COSTA AZUL
CONSTRUCCIONES G.A.P S.A.S
96.80
50.27
246.40
114.40
109.68
249.60
3.20
6.00
2.60
7.20
13.20
52.80
5,887.43
###
###
TOTAL
35.20
66.00
28.60
75.60
138.60
554.40
898.40
TOTAL
89.99
89.99
TOTAL
25.98
7.79
34.80
68.57
TOTAL
M3
6.16
6.47
13.50
26.12
TOTAL
4.10
8.20
12.30
TOTAL
4.54
-2.65
11.34
-7.07
6.16
TOTAL
4.77
-2.79
11.91
-7.42
6.47
TOTAL
5.00
3.00
7.00
3.00
1.00
2.00
8.00
1.00
30.00
H TOTAL 4.10 MT
H COLUMNA 1.80 MT
Volumen
Longitud excavación
vaciado
[m]
[m³]
Radio Vol.
Radio
No. Ejes Fuste Pila [m] B [m] FUSTE
Pedestal [m]
[m] PILA
SOTANO 1 - 1724.60
1 B0 0.50 0.75 0.80 1.50 2.49
2 C0 0.50 0.65 1.40 0.90 2.04
3 D0 0.50 0.65 1.40 0.90 2.04
4 E0 0.50 0.65 1.40 0.90 2.04
5 B1 0.50 0.75 0.80 1.50 2.49
6 C1 0.60 0.75 1.40 0.90 2.88
7 D1 0.60 0.75 1.40 0.90 2.88
8 E1 0.50 0.65 1.40 0.90 2.04
9 A2 0.50 0.75 0.80 1.50 2.49
10 A3 0.50 0.75 0.80 1.50 2.49
11 C3 0.65 0.75 1.70 0.60 3.18
12 D3 0.60 0.75 1.40 0.90 2.88
13 E3 0.50 0.65 1.40 0.90 2.04
14 A4 0.50 0.75 0.80 1.50 2.49
15 C4 0.60 0.75 1.40 0.90 2.88
16 D4 0.60 0.75 1.40 0.90 2.88
17 E4 0.50 0.725 1.40 0.90 2.17
18 C5 0.50 0.75 0.80 1.50 2.49
19 B6 0.75 0.75 0.80 1.50 4.06
20 C7 0.50 0.75 0.80 1.50 2.49
21 E7 0.50 0.50 1.80 0.00 1.41
22 A8 0.60 0.75 0.80 1.50 3.06
23 C8 0.70 0.75 1.40 0.90 3.64
24 D8 0.70 0.75 1.40 0.90 3.64
25 E8 0.60 0.65 1.40 0.90 2.69
26 A9 0.50 0.75 0.80 1.50 2.49
27 A10 0.50 0.75 0.80 1.50 2.49
28 B11 0.50 0.75 0.80 1.50 2.49
29 B14 0.60 0.65 1.40 0.90 2.69
SÓTANO 2 - 1721.60
30 C9 0.65 0.75 1.70 0.60 3.18
31 D9 0.60 0.75 1.40 0.90 2.88
32 E9 0.50 0.65 1.40 0.90 2.04
33 C11 0.60 0.75 1.70 0.60 2.79
34 D11 0.70 0.75 1.40 0.90 3.64
35 E11 0.50 0.75 0.80 1.50 2.49
36 C14 0.60 0.65 1.40 0.90 2.69
37 D14 0.60 0.65 1.40 0.90 2.69
38 E14 0.60 0.65 1.40 0.90 2.69
101.16
file:///conversion/tmp/scratch/466104384.xls466104384.xls 7 de 10
VIGAS DE FUNDACIÓN
EXCAVACIÓN CONCRETO
Solado Total Total
Profundida Total Exc. Profundida
UBICACIÓN L (m) Ancho (m) L (m) Ancho (m) e = 0.05 Concreto Solado
d (m) (m3) d (m)
m (m3) (m3)
SOTANO 1 - 1724.60
EJE A (0-1) VF-2A 7.20 0.80 1.10 6.34 7.20 0.80 0.50 0.05 2.88 0.29
EJE A (1-2) VF-3 4.20 0.40 0.40 0.67 4.20 0.30 0.40 0.05 0.50 0.06
EJE A (2-3) VF-3 2.50 0.40 0.40 0.40 2.50 0.30 0.40 0.05 0.30 0.04
EJE A (3-4) VF-3 4.25 0.40 0.40 0.68 4.70 0.30 0.40 0.05 0.56 0.07
EJE A (4-8) VF-3 8.80 0.40 0.40 1.41 9.40 0.30 0.40 0.05 1.13 0.14
EJE A (8-9) VF-3 4.20 0.40 0.40 0.67 4.70 0.30 0.40 0.05 0.56 0.07
EJE A (9-10) VF-3 2.20 0.40 0.40 0.35 2.50 0.30 0.40 0.05 0.30 0.04
EJE A (10-14) VF-3 13.40 0.40 0.40 2.14 13.40 0.30 0.40 0.05 1.61 0.20
EJE B (0-1) VF-1 4.35 0.60 1.10 2.87 4.95 0.50 0.70 0.05 1.73 0.12
EJE B (1-2) VF-1 3.85 0.60 1.10 2.54 4.45 0.50 0.70 0.05 1.56 0.11
EJE B (2-3) VF-1 1.60 0.60 1.10 1.06 2.50 0.50 0.70 0.05 0.88 0.06
EJE B (3-4) VF-1 3.80 0.60 1.10 2.51 4.70 0.50 0.70 0.05 1.65 0.12
EJE B (4-8) VF-1 8.50 0.60 1.10 5.61 9.40 0.50 0.70 0.05 3.29 0.24
EJE B (8-9) VF-1 3.80 0.60 1.10 2.51 4.70 0.50 0.70 0.05 1.65 0.12
EJE B (9-10) VF-1 1.60 0.60 1.10 1.06 2.50 0.50 0.70 0.05 0.88 0.06
EJE B (10-11) 3.95 0.60 1.10 2.61 4.40 0.50 0.70 0.05 1.54 0.11
EJE B (11-14) 6.50 0.60 1.10 4.29 7.10 0.50 0.70 0.05 2.49 0.18
VF-3 ESC. (2-3) 2.50 0.40 0.40 0.40 2.50 0.30 0.40 0.05 0.30 0.04
VF-3 ESC. (9-10) 2.50 0.40 0.40 0.40 2.50 0.30 0.40 0.05 0.30 0.04
VF-1 EJE C (0-1) 4.35 0.60 1.10 2.87 4.90 0.50 0.70 0.05 1.72 0.12
VF-1 EJE C (1-3) 7.00 0.60 1.10 4.62 7.50 0.50 0.70 0.05 2.63 0.19
VF-1 EJE C (3-4) 3.95 0.60 1.10 2.61 4.70 0.50 0.70 0.05 1.65 0.12
VF-4 EJE C (4-8) 8.55 0.90 1.10 8.46 9.40 0.65 0.70 0.05 4.28 0.31
VF-1 EJE C (8-9) 4.25 0.60 1.10 2.81 4.70 0.50 0.70 0.05 1.65 0.12
VF-1 EJE D (0-1) 4.05 0.60 1.10 2.67 4.90 0.50 0.70 0.05 1.72 0.12
VF-1 EJE D (1-3) 7.25 0.60 1.10 4.79 8.15 0.50 0.70 0.05 2.85 0.20
VF-1 EJE D (3-4) 3.80 0.60 1.10 2.51 4.70 0.50 0.70 0.05 1.65 0.12
VF-1 EJE D (4-8) 8.50 0.60 1.10 5.61 9.40 0.50 0.70 0.05 3.29 0.24
VF-1 EJE D (8-9) 4.25 0.60 1.10 2.81 4.70 0.50 0.70 0.05 1.65 0.12
VF-1 EJE E (0-1) 4.15 0.60 1.10 2.74 5.00 0.50 0.70 0.05 1.75 0.13
VF-1 EJE E (1-3) 7.40 0.60 1.10 4.88 8.35 0.50 0.70 0.05 2.92 0.21
VF-1 EJE E (3-4) 4.05 0.60 1.10 2.67 4.90 0.50 0.70 0.05 1.72 0.12
VF-1 EJE E (4-7) 5.70 0.60 1.10 3.76 6.20 0.50 0.70 0.05 2.17 0.16
VF-1 EJE E (7-8) 2.25 0.60 1.10 1.49 3.00 0.50 0.70 0.05 1.05 0.08
VF-1 EJE E (8-9) 4.40 0.60 1.10 2.90 4.90 0.50 0.70 0.05 1.72 0.12
VF-3 EJE F (0-4) 19.20 0.40 0.40 3.07 19.20 0.30 0.40 0.05 2.30 0.29
VF-3 EJE F (7-9) 9.60 0.40 0.40 1.54 9.80 0.30 0.40 0.05 1.18 0.15
VF-1 EJE 14 (B-C) 4.10 0.60 1.10 2.71 4.20 0.50 0.70 0.05 1.47 0.11
VF-1 EJE 11 (B-C) 3.75 0.60 1.10 2.48 4.20 0.50 0.70 0.05 1.47 0.11
VF-3 EJE 10 (B-C) 4.15 0.40 0.40 0.66 4.25 0.30 0.40 0.05 0.51 0.06
VF-1 EJE 9 (B-C) 3.55 0.60 1.10 2.34 3.75 0.50 0.70 0.05 1.31 0.09
VF-1 EJE 8 (B-C) 3.40 0.60 1.10 2.24 3.70 0.50 0.70 0.05 1.30 0.09
VF-1 EJE 8 (C-D) 6.10 0.60 1.10 4.03 6.40 0.50 0.70 0.05 2.24 0.16
VF-1 EJE 8 (D-E) 2.45 0.60 1.10 1.62 2.75 0.50 0.70 0.05 0.96 0.07
VF-1 EJE 8 (E-F) 1.00 0.60 1.10 0.66 1.20 0.50 0.70 0.05 0.42 0.03
VF-3 EJE 7 (D-E) 3.15 0.40 0.40 0.50 3.30 0.30 0.40 0.05 0.40 0.05
VF-1 EJE 4 (B-C) 3.40 0.60 1.10 2.24 3.70 0.50 0.70 0.05 1.30 0.09
VF-1 EJE 4 (C-D) 6.10 0.60 1.10 4.03 6.40 0.50 0.70 0.05 2.24 0.16
VF-1 EJE 4 (D-E) 2.40 0.60 1.10 1.58 2.55 0.50 0.70 0.05 0.89 0.06
VF-1 EJE 4 (E-F) 1.30 0.60 1.10 0.86 1.30 0.50 0.70 0.05 0.46 0.03
VF-1 EJE 3 (B-C) 3.40 0.60 1.10 2.24 3.70 0.50 0.70 0.05 1.30 0.09
VF-1 EJE 3 (C-D) 6.10 0.60 1.10 4.03 6.40 0.50 0.70 0.05 2.24 0.16
VF-1 EJE 3 (D-E) 2.45 0.60 1.10 1.62 2.75 0.50 0.70 0.05 0.96 0.07
VF-1 EJE 3 (E-F) 1.00 0.60 1.10 0.66 1.15 0.50 0.70 0.05 0.40 0.03
VF-3 EJE 2 (A-C) 4.30 0.40 0.40 0.69 4.40 0.30 0.40 0.05 0.53 0.07
VF-1 EJE 1 (B-C) 3.50 0.60 1.10 2.31 4.45 0.50 0.70 0.05 1.56 0.11
VF-1 EJE 1 (C-D) 5.80 0.60 1.10 3.83 6.30 0.50 0.70 0.05 2.21 0.16
VF-1 EJE 1 (D-E) 2.50 0.60 1.10 1.65 2.75 0.50 0.70 0.05 0.96 0.07
VF-1 EJE 1 (E-F) 1.00 0.60 1.10 0.66 1.15 0.50 0.70 0.05 0.40 0.03
VF-2 EJE 0 (B-C) 3.70 0.80 0.90 2.66 5.65 0.70 0.50 0.05 1.98 0.20
VF-2 EJE 0 (C-D) 5.80 0.80 0.90 4.18 7.25 0.70 0.50 0.05 2.54 0.25
VF-2 EJE 0 (D-E) 2.70 0.80 0.90 1.94 3.90 0.70 0.50 0.05 1.37 0.14
VF-2 EJE 0 (E-F) 1.00 0.80 0.90 0.72 1.70 0.70 0.50 0.05 0.60 0.06
2.40 0.60 1.10 1.58 3.30 0.50 0.70 0.05 1.16 0.08
2.20 0.60 1.10 1.45 2.20 0.50 0.70 0.05 0.77 0.06
FOSO ASCENSOR
5.30 0.60 1.10 3.50 5.30 0.50 0.70 0.05 1.86 0.13
1.00 0.60 1.10 0.66 1.00 0.50 0.70 0.05 0.35 0.03
ESC. ACCESO (2-3) 5.50 0.40 0.40 0.88 6.75 0.30 0.40 0.05 0.81 0.10
ESC. ACCESO (9-10) 5.50 0.40 0.40 0.88 6.75 0.30 0.40 0.05 0.81 0.10
SOTANO 2 - 1721.60
EJE C (9-11) VF-2 7.00 0.80 0.90 5.04 7.50 0.70 0.50 0.05 2.63 0.26
EJE C (11-14) VF-2 6.50 0.80 0.90 4.68 7.05 0.70 0.50 0.05 2.47 0.25
EJE D(9-11) VF-1 7.20 0.60 1.10 4.75 8.10 0.50 0.70 0.05 2.84 0.20
EJE D(11-14) VF-1 6.20 0.60 1.10 4.09 7.05 0.50 0.70 0.05 2.47 0.18
EJE E(9-11) VF-1 7.40 0.60 1.10 4.88 8.30 0.50 0.70 0.05 2.91 0.21
EJE E(11-14) VF-1 6.30 0.60 1.10 4.16 7.15 0.50 0.70 0.05 2.50 0.18
EJE 9(C-D) VF-2 6.10 0.80 0.90 4.39 6.40 0.70 0.50 0.05 2.24 0.22
EJE 9(D-E) VF-2 2.45 0.80 0.90 1.76 2.80 0.70 0.50 0.05 0.98 0.10
EJE 11(C-D) VF-1 5.75 0.60 1.10 3.80 6.30 0.50 0.70 0.05 2.21 0.16
EJE 11(D-E) VF-1 2.50 0.60 1.10 1.65 2.70 0.50 0.70 0.05 0.95 0.07
EJE 14(C-D) VF-1 5.80 0.60 1.10 3.83 6.05 0.50 0.70 0.05 2.12 0.15
EJE 14(D-E) VF-1 2.70 0.60 1.10 1.78 3.00 0.50 0.70 0.05 1.05 0.08
TOTAL 378.30 208.23 125.16 10.14
CABEZOTES PILAS
CONCRETO
Total
Profundidad
UBICACIÓN PI (m) Radio (m) Concreto
(m)
(m3)
SOTANO 1 - 1724.60
B0 3.1416 1.80 0.75 3.18
C0 3.1416 1.80 0.65 2.39
D0 3.1416 1.80 0.65 2.39
E0 3.1416 1.80 0.65 2.39
B1 3.1416 1.80 0.75 3.18
C1 3.1416 1.80 0.75 3.18
D1 3.1416 1.80 0.75 3.18
E1 3.1416 1.80 0.65 2.39
A2 3.1416 1.80 0.75 3.18
A3 3.1416 1.80 0.75 3.18
C3 3.1416 1.80 0.75 3.18
D3 3.1416 1.80 0.75 3.18
E3 3.1416 1.80 0.65 2.39
A4 3.1416 1.80 0.75 3.18
C4 3.1416 1.80 0.75 3.18
D4 3.1416 1.80 0.75 3.18
E4 3.1416 1.80 0.725 2.97
C5 3.1416 1.80 0.75 3.18
B6
C7 3.1416 1.80 0.75 3.18
E7 3.1416 1.80 0.50 1.41
A8 3.1416 1.80 0.75 3.18
C8 3.1416 1.80 0.75 3.18
D8 3.1416 1.80 0.75 3.18
E8 3.1416 1.80 0.65 2.39
A9 3.1416 1.80 0.75 3.18
A10 3.1416 1.80 0.75 3.18
B11 3.1416 1.80 0.75 3.18
B14 3.1416 1.80 0.65 2.39
SOTANO 2 - 1724.60
C9 3.1416 1.80 0.75 3.18
D9 3.1416 1.80 0.75 3.18
E9 3.1416 1.80 0.65 2.39
C11 3.1416 1.80 0.75 3.18
D11 3.1416 1.80 0.75 3.18
E11 3.1416 1.80 0.75 3.18
C14 3.1416 1.80 0.65 2.39
D14 3.1416 1.80 0.65 2.39
E14 3.1416 1.80 0.65 2.39
107.01
VALE 02 7.17
VALE 03 37.21
VALE 04 34.80
file:///conversion/tmp/scratch/466104384.xls466104384.xls 8 de 10
COLUMNAS TORRE 1