JOB TITLE / AIM: Civil Works for Construction in DHDS Tank Area

JSA DATE: 08-02-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Zakir Ali SCRIBE: Touseef Abro
PARTICIPANTS : Asif Ali, Yar Muhammad, Muhammad Asif
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of People, Equipment & Materials
2. Leveling, back filling & compaction works
3. Steel fixing, Form works & concreting
4. Working at night shift hours
5. Demobilization

Part 3: Equipments / Tools to be used: Loader, Dumper, Roller Compactor, Tractor, Plate compactor, Vibrator, wheel barrows & Hand Tools
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Civil Works for Construction in DHDS Tank Area
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Mobilization of equipment & Involvement of unskilled personnel  Trained & skilled staff to be authorized for
Materials working
 Ensure JSA briefing to all workforce prior
to commence activity
 Deliver daily TBT
 Use of appropriate PPE’s
Unauthorised/ uninspected equipment/tools at  Only inspected Equipments/Tools must be
site allowed at work site
 Use right tools for right job
 All tools must be colour coded
Personnel injury / property damage  Ensure safe transportation of
equipment/materials at work site
 Ensure use of proper PPE’s, avoid
throwing of materials
 All of materials to be secured while its
transportation to work site
 Close safety supervision
2 Levelling, Back filling & Personnel hit by Movement of heavy  Deliver tool box talk to all of vehicles
Compaction works vehicles/equipments drivers & operators
 Banks men should be available at site to
control the movement of heavy
vehicles/equipments
 Keep away all unauthorized people during
movement of heavy vehicle/equipments
 Ensure Close HSE monitoring /supervision
Dust  Ensure use of appropriate PPE’s (dust
mask)
 Water sprinkling to be carried out on
regular biases to avoid dust
JSA No: JOB TITLE: Civil Works for Construction in DHDS Tank Area
Step Describe Job Step Potential Hazards Hazard Controls
No
Slip, Trip & fall  Excavated area should be properly hard
barricaded
 Keep access/walk ways always clear from
any obstruction
 Ensure proper housekeeping of workplace
all the time
Inclement weather condition  Stop work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
Fire & explosion  Ensure availability of inspected fire
extinguishers at site
 Flame arrestor to be installed in all
vehicles
3 Steel Fixing, Form work & Personnel hand injury while handling with  Involvement of skilled labour
Concreting steel & form work materials  Ensure use of proper PPE’s
 Deliver daily TBT before commencing
work
 Ensure use of inspected & colour coded
hand tools
Slip ,trip & fall  Ensure proper stacking of all materials at
work site
 Maintain good housekeeping all the time
Inappropriate PPE’s/Tools during concrete  Use of appropriate PPE’s during concrete
work works (Eye protection, rubber gloves, gum
shoes)
 Ensure use of inspected tools for the right
job
Skin contact with concrete or other chemicals
 Availability of fresh water at site
JSA No: JOB TITLE: Civil Works for Construction in DHDS Tank Area
Step Describe Job Step Potential Hazards Hazard Controls
No
 First aid box should be in place at site
4 Working at night shift hours Poor visibility at night hours  Ensure proper lighting arrangement for
late night working hours
Vehicles/equipments hit with people,  Careful movement of vehicles in night
equipment or structure hours
 Place refection tapes at hard barriers,
structures
 Banks men should worn high visibility
reflection vests
Slip , trip & fall  No working should be allowed in poor
lighting conditions
 Ensure proper housekeeping to avoid
tripping
5 Demobilization Same as item one Same as item one

Prepared By : Touseef Abro Approved By:_____________________