Job Steps:

1- Mobilization Workers and Equipment


2- Lifting and Placing pipe spools.
3- Welding, Grinding and cutting job
4- Air Blowing
5- Night working
6- De Mobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the Hse personnel are the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers & Unauthorized equipment/tools brought out to Before mobilization any equipment/ tools make
equipment site sure that the E & P Personal got inspected. Ensure
that the checklist is with every equipment.
Unskilled and uninducted personal starting the Ensure that all Personal prior to start the have been
job inducted and oriented about the hazard in the job
site
Workers starting the job unfit to work All personal not fit to work shall not be allowed to
work at the project site.
Works starting the job with out JSA JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion.
2 Lifting and Placing structure, pipe Mobilization of crane on site without Prior to work crane must be inspected by E&P
inspection Rigging crew shall be fully attentive and good and
clear communication B/W executor, rigging
supervisor and operator.
All the rigging tools shall be certified.
Hand injury Proper ppe non slipping hand gloves shall be used

Improper rigging activity Competent rigger must be appointed in this activity


also crane operator
Crane operator must fallow to rigger
Ensure that double tag line in used.
Exposure of workers to hazards including hand Ensure that the workers must wear the proper PPE
injury, dust, eye injury, etc prior to work
Ensure all workers are equipped with safety boots,
safety glasses, non-slippery gloves, clothing and
hard hat
Worker will be oriented about the proper posture
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
and positioning during the execution of the job.
Lack of supervision Supervisor must be on site at all times work is in
progress
Falling and Tripping Don’t’ store the material on working platform.

Working on Scaffold platform Ensure workers are wearing appropriate full body
harness and tie-off 100% on yellow tag
Scaffolding no one should access a scaffold if there
is a red tag or no tag. Works on scaffold must be
supervised at all time no equipment and tools will
be stored on the scaffold
All persons working on scaffold must be trained on
working at height and use of harnesses. All
harnesses must be checked daily by a component
person and logged,
No workers should alter the scaffolding. Ensure
that no body is throwing of materials from
scaffold.
Ensure that area was barricaded and secured
Ensure that the scaffold is approved inspected by
BHBP person prior to used and tagged.
Where the joint welding is required platform shall
me made to access the pipes.
Back Injury Ensure workers properly inducted about the
proper positioning Ensure workers are
complying with the min, PPE requirement
Safety shoes, and helmet safety glass dust mask.
Ensure workers have provided water and
proper shade.

Personnel struck by sparks, steel buffer wire  Wear PPE. (Safety glasses, face
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
or shattering grinding disc, electric shock shield, gloves, safety boots)
 Frequently check condition of
grinding disc
Ensure electrical equipment has current test &
tagging.

Fire Hazard Area to be kept clear of all debris and good house
keeping completing prior to commencing job.
Fire blanket and fire extinguisher on site. Ensure
that no flammable or combustible materials are in
the area.
All sparks to be contained.
Works to be done under BHPB HWP
Unskilled and uninducted personal starting the Ensure that all Personal prior to start the have been
job inducted and oriented about the hazard in the job
site
Tripping Hazards Ensure proper staging of welding materials has
proper barrication if necessary & that workers are
accessing the right walk way
Personnel interface Other workers not involve in the job must not
come closer to the area
Equipment Failure Ensure that equipment was checked in daily basis
and checklist available at the equipment and tools
and colour coded
Ensure proper access and egress for all vehicles
Pinch point hazard Ensure that no grinders shall used will positive
lock. Ensure it was colour coded and inspected
prior to use
Grinder disc becoming jammed in cut  Ensure that the pipe to be cut has been
supported adequately so that no
movement occurs whilst cutting the
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
pipe.
 The grinder and cutting disc must be
inspected prior to use, any defective
discs are not to be used.
 Fire extinguishers must be in place.
 Appropriate PPE is to be worn at all
times
Pieces of debris flying from grinding discs  All persons using grinders need to be
and striking surrounding personnel competent and wear the appropriate
PPE
Accidental activation of grinder injuring the  Grinder to have a suitable guard in
grinder operator place
 Grinders must be placed “Disc Down”
on the ground when not in use.
 Ensure grinder is disconnected from
power source prior to changing /
adjusting disc
When operator needs to get to the other
side of the pipe he should place the grinder
under the pipe before crossing the pipe
himself.
4 Air Blowing

5 ]

Night working Ensure sufficient amount of lighting in the area


JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Poor visibility No work shall be performed if there if not enough
lighting
If access is not properly lit then a designated
assembly point shall be established with sufficient
light.
Ensure all excavations adjacent to the work area is
Trips/falls
taped off with high visibility tape prior to
commencement of works.
A standby vehicle should be present at the area
A charge radio must be present at all times at the
area and any incident must be reported
immediately to BHPB personnel
Doctor will be on call in any case
Miscommunication Employees will assure a buddy system
No worker shall work alone at the site
Ensure that no workers shall work more than 14
Person working alone hours and have 7 hours enough sleep
Ensure that special attention will be done for the
presence of snake in the area
Snake bite


6 Demobilization Same as time one Same as time one