JOB TITLE / AIM: JSA for the Manual Lifting of Plat Form in CO2 Area Phase II
JSA DATE: 07/10/2007 JSA NO./ REVISION:DEL – 082
SUPERVISOR/ JSA LEADER: Shahryar SCRIBE:Asad Nadeem / Nouman Liaqat
PARTICIPANTS: Tufail Ahmad
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
i. Mobilization of Tools & Workers
ii. Lifting of Platforms
iii. Bolt Tightening
iv. Demobilization
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S First aid kit must be present at the area and the Hse personnel is the first response in case of emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that
need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers & equipment Unauthorised equipment/tools brought out to site Before mobilizing any equipment/tools make sure
that the E & P Personnel got inspected the
equipment.
Unskilled and uni inducted personnel starting the Ensure that all personnel prior to start the have been
job inducted and oriented about the hazard in the job
site.
Workers starting the job without Safety Analysis JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting discussion.
JSA was discussed to workers and signed at the
back.
Ensure Tool Box meeting is held before starting of
Workers Un Aware of Job/ Site Hazards job and all hazards involved in the job and their
preventive measures are discussed with them.
Starting Job in Operating Plant With out Ensure that Prior to lifting NFHWP permit shall be in
Permission placed.
Leakage of Gas If there is an y symptoms of Gas leakage all the
equipment shall be switched off immediately and
reported to BHP Commissioning team about the Gas
Leakage
Damage to Installed Equipments / Instruments Take care of already installed equipments and
instruments
2. Manual Erection of Structure Hand Injury Ensure proper handling of materials / Wear hand
gloves.
Exposure of workers to various hazard like hand Ensure workers are complying with the min.
injury, dust, eye injury PPE req...Safety shoes, helmet, safety glass,
dust mask, reflective vest,