SPECIFICATION SP-421300-50-27
PIPING TIE-INS
By: By:
Date: Date:
Sp-50-27rev11.doc - 04/26/01
PETROLERA AMERIVEN Grupo Alvica
Hamaca Crude Upgrader Project Contract No. 04477000
Date: 6-Feb-01, Rev. 11
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
TABLE OF CONTENTS
SECTION PAGE
4.0 ATTACHMENTS
Sp-50-27rev11.doc - 04/26/01
PETROLERA AMERIVEN Grupo Alvica
Hamaca Crude Upgrader Project Contract No. 04477000
Date: 6-Feb-01, Rev. 11
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
1.0 GENERAL
1.1 Summary
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
1.1.4 Terminology
1.2 References
The publications listed below form part of this specification. Each publication
shall be the latest revision and addendum in effect on the date this specification
is issued for construction unless noted otherwise. Except as modified by the
requirements specified herein or the details of the drawings, Work included in
this specification shall conform to the applicable provisions of these
publications.
11
API Publication 2009 (1995) Safe Welding, Cutting, and Other
Hot Work Practices in Refineries,
Gas Plants, and Petrochemical
Plants.
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
a. P&IDs
c. Isometric Drawings
In addition to data normally shown on isometric drawings, the following information shall be
given when hot or cold tapping of equipment is required:
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
1.4 Submittals
1.4.1 It is mandatory that in advance of any hot tap work, the following
items should be prepared and submitted to Petrolera Ameriven, S.A.
for approval:
To ensure that the proper precautions are taken before and during tie-in work,
the following safety precautions shall be taken into consideration:
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
e. Welding Precautions
3. Unsaturated hydrocarbons.
4. Caustic soda.
5. Amines.
Sp-50-27rev11.doc - 04/24/2001 Page 6 of 10
PETROLERA AMERIVEN Grupo Alvica
Hamaca Crude Upgrader Project Contract No. 04477000
Date: 6-Feb-01, Rev. 11
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
6. Ammonia.
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
2.0 PRODUCTS
2.1.2 Leak testing of all tie-in valves shall be performed by Contractor prior
to installation.
b. Regular port (not tilted port or venturi port) gate valve with the
same NPS (Nominal Pipe Size) and rating as the branch
connection shall be specified, except as follows:
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
c. For valve sizes 2-inch NPS and smaller (other than full port
type), it may be necessary to use a drill diameter one size
smaller than that specified in order to clear the valve seat rings.
This decision must be made in the field after the valve has
been selected, since inside dimensions of the smaller valves
vary widely with manufacturer and style.
b. The base metal thickness must provide support for the new
connection and the hot tap machine or be properly reinforced
to provide such support. Generally, a minimum base metal
thickness of 3/16 of an inch is recommended for hot tapping.
A minimum base metal thinner other than 3/16 of an inch shall
not be tapped without written authorization from Petrolera
Ameriven, S.A.
2.3.1 The hot tap machine shall be of the proper size and rating to
accommodate the required pipe branch connection.
2.3.3 The hot tap machine shall have an accurate means by which to
indicate the travel distance of the pilot bit and cutter.
2.3.4 The design shall include the specification for gaskets, tapping valve,
and bolts. Hot tap fitting length must accommodate the machine.
Sufficient clearance for operation of the machine must be provided.
Sp-50-27rev11.doc - 04/24/2001 Page 9 of 10
PETROLERA AMERIVEN Grupo Alvica
Hamaca Crude Upgrader Project Contract No. 04477000
Date: 6-Feb-01, Rev. 11
SPECIFICATION SP-421300-50-27
PIPING TIE-INS
2.3.5 Before hot tapping is attempted, the machine, cutter, and pilot bit
shall be carefully inspected to ensure that all are in satisfactory
condition.
3.0 EXECUTION
d. Installation.
e. Quality Control.