LABOR PRODUCTION TABLE

MANHOURS PER QUANTITY


WORK DESCRIPTION
ww AVERAGE HIGH

I. TRADE: CARPENTRY WORKS


A. FORM WORKS INSTALLATION
1.0 WAI,L ON GROUND 4.00 MII/S.M. 2.00 MH/S.M, 1.60 MH!S.M.
2.0 WALL ABOVEGROUND 4. 70 MUIS.M. 2.35 MHIS.M. 1.88 MHIS.M.
3.0 BEAMS 6.16 MII/S.M. 3.08 MH/S.M. 2.46 MII/S.M.
4.0 COLUMNS 4.70 MHIS.M. 2.35 MH/S.M. 1.88 MII/S.M.
5.0 SUSPENDED SLAB
0 TO tal 3.34 MHIS.M. 1.67 MHIS.M. 1.34 MHJS.M.
18 TO 361 UP 6.66 MII/S.M. 3.33 MJIIS.M. 2.66 MHIS.M.
8,0 ELEVATED AND SHORED
SLAB FORMING
6,01 FORMING ONLY 17.20 MH/S.M. 8.60 MHIS.M. 6.88 MHIS.M.
6.02 FORMING and SHORING 22.00 MII/S.M. 11.00 MHJS.M. 8.80 MH/S.M.
7.0 WOOD WALL and PARTITIONS 1.00 MH/S.M. 0.60 MII/S.M. 0.40 MH/S.M.

B. FORM WORKS FABRICATION 2.15 MIIIS.M. 1.08 MHIS.M. 0,86 MH/S.M.

c. STRIPPING OF FORM WORKS


.
1.0 WALL ON GROUND 0.60 MHIS.M. 0.20 MHIS.M. 0.20 MHIS.M.
2.0 WALL ABOVE JOl 2.58 MHIS.M. 1.29 MHIS.M. 1.03 MHIS.M.
3.0 BEAMS 2.06 MHIS.M. 1.03 MII/S.M. 0.82 "MH/S.M.
4.0 COLUMNS 1.70 MIIIS.M. 0.85 MII/S.M. 0.68 MHIS.M.
6.0 SUSPENDED SLAB
OTO J8l 1.67 MHIS.M. 0.83 MHIS.M. 0.67 MHIS.M.
IBT0361 UP 2.16 MHIS.M. 1.08 MHIS.M. 0.86 MHIS.M.
6.0 ELEVATED and SHORED SLAB
FORMING-STRIP OF FORMS 7,00 MHIS.M. 3.50 MII/S.M. 2.80 MHIS.M.
7.0 FLOOR SLAB AT GRADE-
STRIP OF FORMS 6.60 KMWS.M. 2.80 MHIS.M. 2.24 MHIS.M.

D. INSTALLATION OF CARPENTRY
WORKS
1.0 PLYWOOD PARTITION 2.00 MH/PC 1.00 MHIPC 0.80 MHIPC
. 2.0 T and G FLOORING and SIDING 0.29 MHIB.F. 0.14 MHJB.F. 0.11 MHIB.F.
3,0 CEILING FRAME WORK 0. 73 MHIB.F. 0.36 MH/B.F. 0.29 MHIB.F.
4.0 SIDING FRAME WORK 0.63 MHIB.F. 0.27 MHIB.F. 0.21 MHIB.F.
6.0 FLOORING FRAMING 1.94 MHIB.F. 0.97 MH/B.F. 0. 77 MHIB.F.
6.0 WOODEN POST ERECTION 0.86 MHIB.F. 0.'13 MH/B.F. 0.34 MHIB.F.
7.0 TRUSS FABRICATION 0. 70 MHIB.F. 0.36 MHIB.F. 0.28 MHJiJ.F.
8.0 TRUSS INSTALLATION 1.60 MHIB.F. 0.80 MHIB.F. 0.64 MHIB.F.
9.0 SIRT INSTALLATION 0.43 MHIB.F. 0.21 MHIB.F. 0.17 MHIB.F.
10.0 PLATES INSTALLATION 0.27 MHIB.F. 0.13 MHIB.F.' 0.11 MHIB.F.
11.0 PURLING INSTALLATION 0.53 MHIB.F. 0.27 MHIB.F. 0.21 MHIB.F.
12.0 FACIA BOARD INSTALLATION 0.91 MHIB.F. O..t6 MIIIB.F. 0.36 MHIB.F.
13.0 lf.4" or 3W thk. PLYWOOD
- CUTTING BY MANUAL 2:00 MHIPC 1.00 MHIPC 0.80M MHIPC
-ASSEMBLY 0.83 MHIS.M. 0.42 MH/S.M. 0.33 MHIS.M.
LABOR PRODUCTION TABLE

MANHOURS PER QUANTITY


WORK DESCRIPTION
LOW AVERAGE HIGH

14.0 CEILING
• FRAME INSTALLATION 2.66 MHIS.M. 1.33 MHIS.M. 1.06 MHIS.M. ·
-PLYWOOD INSTALLATION 2.00 MHIS.M. 1.00 MH/S.M. 0.80 MHIS.M.
16.0 CABINET BOARDING 0.26 MH!B.F. 0.13 MH/B.F. 0.10 MH/B.F.
16.0 CABINET FRAMING 0.36 MHIB.F. 0.18 MHIB.F. 0.14 MHIB.F.
17.0 WOOD WALL PARTITIONS 1.00 MII/S.M. 0.50 MHIS.M, 0.40 MHIS.M.
18.0 PANEL WALL 14.00 MHIS.M. 7.00 MHIS.M. 6.60 MHIS.M.
19.0 FORMING WEIGHT ANCHOR
BOLTS 9.00 MJIIS.M. 4.60 MH/S.M. 3.60 MHIS.M.
20.0 NET FORMING 7.00 MHIS.M. 3.60 MHIS,M. 2.80 MHJS.M.

E. OOORS and WINDOWS


1.0 W-PANEL INSTALLATION 0.80 MHIPC 0.40 MHIPC 0.32 MHIPC
2.0 STEEL WINDOWS
INSTALLATION 4.00 MHIPC 2.00 MHIPC 1.60 MHIPC
3,0 LOUVER WINDOWS
INSTALLATION
3.01 FIXED ASBESTOS 9.26 MHIS.M. •US MH/S.M, 3.70 MHIS.M.
3.02 FIXED METAL LOUVERS 6.24 MHIS.M. 3.12 MHIS.M. 2.50 MHIS.M.
3.03 FIXED G.l. SHEET 9.26 MHIS.M. 4.68 MHIS.M. 8.70 MHIS.M.
3,04 FIXED GLASS 6.24 MHIS.M. 3.12 MHIS.M: 2.60 MH/S.M.
8.05 FIXED WOODEN 6.76 MHIS.M. 3.38 MHIS.M. 2. 70 MHIS.M.
4.0 ALUMINUM FRAMED
WINDOWS 20.00 MHIEACH 10.00 MHIEACH 8.00 MHI&ACH
5.0 SLIDING GLASS DOOR 24.00 MHIEACH 12.00 MHIEACH 9.60 MHI&ACII
6.0 HOLLOW METAL OOOR 20.00 MIIIEACH 10.00 MHI&ACH 8,00 M~I&ACH
7.0 ROLLING DOORS 50.00 MHIEACH 26.00 MIIIEACH 20.00 MHIEACH
8.0 FIXED WINDOW 0,68 MHIS.F. 0.31 MHIS.F. 0.25 MHIS.F.
9.0 DOOR LOCKSET 8,20 MH/SET 1.60 Mil/SET 1.28 MHISET
10.0 DOORJAMB: FABRICATION 0,44 MIIIB.F. 0.22 MHIB.F. 0.18 MHJB.F.
INSTALLATION 0,66 MHIB.F. 0.33 MHIB.F. 0.26 MHIB.F.
11.0 CYCLONE WIRE INSTALLATION 6.24 MHIS.M. 3.12 MHIS.M. 2.50 MHIS.M.

II. TRADE: MASCARI WORKS


1.0 OROliT'ING and
TOL PLASTERING 3,34 MII/S.M. 1.61 MII/S.M. 1.34 MII/S.M.
2.0 PEBBLE FINISHED 2.86 MHIS.M. 1.43 MHIS.M .. 1.14 MH/S.M.
3.0 MARBLE INSTALLATION 4.00 MII/S.M. 2.00 MHIS.M. 1.60 MHIS.M.
4.0 114" x 2 x 8 RED BRICKS 10.00 MHIS.M. 5.00 MHIS.M, 4.00 MHts.M,
5.0 GLAZED TIL&S 21.06 MII/S.M. 10.53 MH'IS.M. 8.42 Mllts.M.
6.0 UNGLAZED TILES 8. 70 MIIJS.M. 4.35 MII/S.M. 3.48 MII/S.M.
7.0 GLAZED TILE WALL 6,00 MHIS.M. 3.00 MHIS.M. 2.40 MII/S.M.
8.0 CONC. BLOCK EXT. WALL 9.00 MHIB.M. 4.60 MH/S.M, 3.60 MH/S.M.
9.0 CONC. BLOCK INT. WALL 8.00 MHIS.M, 4.00 MHIS.M, 3.20 MH/S.M.
10.0 BRICKWORK 1.00 MHIS.M. 0.60 MHIS.M. 0.40 MHIS.M.
11.0 PLASTER WALL end CEILING 6.00 MHIS.M. 8.00 MHIS.M. 2.40 MII/S.M.
12.0 HOLLOW TILE WALL 4.00 MHIS.M. 2.00 MHIS.M. 1.60 MII/S.M.
13.0 ACOUSTICAL CEILING 2.40 MHIS.M. 1.20 MHIS.M. 0.96 MH/S.M.
14.0 V1NYL FLOOR TILE 3.60 MH!S.M. 1.80 MH/S.M. 1.44 MHIS.M.
15.0 UNGLAZED OR MOSAIC
FLOOR TILE 17.00 MHIS.M. 8.60 MHts.M. 6.80 MII/S.M.
16.0 LAYING OF CHB and ADOBE 2.28 MHIS.M. 1.14 MH/S.M. 0.91- MHIS.M.
LABOR PRODUCTION TABLE

MANHOUR8 PER QUANTITY


WORK DE 8 CRIP TION
LOW AVERAGE HIGH

17.0 CEMENT FINISH 1.43 MHIB.M. 0. 72 MHIS.M. 0.67 MHIS.M.


18.0 CONC. HOLLOW BLOCKS
LAYING
18.016" CHB 3.20 MHIS.M. 1.60 MHIS.M. 1.28 MHIB.M.
18.02 4" CHB 2.66 MH/S.M. 1.33 MHIS.M. 1.06 MHIS.M.
18.03 8" CHB 4.00 MH/S,M, 2.00 MH/S.M. 1.60 MHIS.M.
19.0 VIT. TILES . FLOOR 10.66 MHIS.M. 5.33 MHIS.M. 4.26 MHIB.M.
20.0 VIT. TILES· WALL 11.94 MH/S.M. 6.97 MH/8.M. 4.78 MHIS.M.

III. TRADE: TINSMITHING WORK


1.0 CORR. 0.1. SHEET
1.01 LIFTING 2.16 MHIS.M. 1.08 MHJS.M. 0.86 MHJS.M.
1.02 INSTALLATION 6.12 MHf.i.M. 3.06 MH/S.M. 2.46 MHJS.M.
2.0 INSTALLATION OF ASBESTOS
ROOFING 2.00 MHJSHT 1.00 MH/SHT 0.80 MH/SHT
3.0 INSTALLATION OF ALUMINUM
ORO.I.SHEET 1.60 MII/SHT 0.80 MH/SHT 0.64 MHISHT
4.0 COPPER CLADDING
ROOF DECK 1.01 MHIL.M. 0.61 MHIL.M. 0.40 MHIL.M.
5.0 FAD. OF 0.1. GUTTER 6.94 MHISHT. 8.47 MHISHT. 2. 78 MHISHT.
6.0 0.1. SHEET ROOFING 1.64 MHIS.M. 0,82 MHIS.M. 0.66 MHIS.M.
7.0 FAD. OF 0,1. OU'ITER t.Oli MHIL.M. 0.53 MHIL.M. 0.42 MHIL.M.
8.0 FAD. OF DOWNSPOtrr 1.94 MHIL.M. 0.97 MHIL.M. 0.78 MHIL.M.
9.0 GUTTER CUT and SHAPE 0.32 MHIL.M. 0.16 MHIL.M. 0.13 MHIL.M.
10.0 1NST. OF GUTTER 1.78 MH/L.M. 0.89 MHIL.M. 0.71 MHIL.M.
11.0 OOWNSPOUT CUT and SHAPE O.li9 MHIL.M. 0,30 MHIL.M. 0.24 MHIL,M.
12.0 OOWNSPOUT INSTALLATION 0.27 MHIL.M. 0.13 MHIL.M. 0.11 MHIL.M.
13.0 CORR. G.I. ROOFING 3.60 MH/S.M. 1.80 MHIS.M. 1.44 MHIS.M.
14.0 CORR. ALUMINUM ROOFING 3.60 MHIS.M. 1.80 MHIS.M. 1.44 MHIS.M.
lli.OBUILT-UP ROOFING 4-PLY 17.00 MH/S.M. 8.60 MH/S.M. 6.80 MHIS.M.
16.0 PROTECTED METAL 4.00 MHIS.M. 2,00·MHJS.M. 1,60 MHIS.M.
17.0 CORR. ASBESTOS INST.,
LIFTING, HAULING 3.40 MHIS.M. 1.70 MHIS.M. 1.36 MHIS.M.
18.0 LEADERS and GUTTERS 1.20 MHIS.M. 0.60 MHIS.M. 0.48 MHIS.M.

IV. TRADE: CONCRETE WORKS


1.0 PLACING CONC.
1.01 SLAB ON FILL 10.00 MH/C.M. 5.00 MHIC.M. 4.00 MHIC.M.
1.02 SLIP FORM liO.OO MHIC.M. 26.00 MH/C.M. 20.00 MHIC.M.
1.03 FLR. FINISH
UNHARDENED 2.00 MHIS.M. 1.00 MHIS.M. 0.80 MHIS.M.
1.04 CONC, FINISH HARDENED 2.86 MHJS.M. 1.43 MHIS.M. 1.14 MHIS.M.
2.0 REBAR WORKS
2.01 GROUND FLR.
INSTALLATION 0.14 MH/Kg, 0.07 MHIKg. 0.06 MHIKg.
2.02 UPPER FLR.
INSTALLATION 0.16 MHIKg. 0.08 MHIKg. 0,06 MHIKg.
2.03 FABRICATION 0.20 MHIKg. 0.-10 MH/Kg. 0.08 MH/Kg.
3.0 MIXING MANUAL 32.00 MH!CM. 16.00 MWCM 12.80 MHICM.
4.0 MIXING MACHINE 3.60 MHICM. 1.80 MHICM. 1.44 MHICM.
LABOR PRODUCTION TABLE

MANllOURS PER QUANTITY


WORK DESCRIPTION
I.OW AVEHAGE HIGH

6,0 MORE THAN 1.80 em. POUR


5.01 CHtrrE FROM TRUCK 14.00 MHICM. 7.00 MII/CM. 5.60 MH!CM.
6.02 CRANE and BUCKET 28,00 MHICM. 14.00 MHICM. 11.20 MH/C~f.
5.03 WHEELING 64,00 MH/C~f. 27.00 MH/CM. 21.60 MH/CM.
5.04 FINISHING 5.60 MH..S.M. 2.80 MHr'S.M. 2.24 MHIS.M.
6.0 CONCRETE POUR ON
ELEVATED and SHORED SLAB
FORMING, CHUTE and BUCKET 42.00 MH/CM. 21.00 MH/CM. 16.80 MHICM.
7.0 PLACEMENT OF REBARS
ON FOOTING 1.00 MH!Kg. 0.53 MHIKg. 0.42 MH/Kg.
8.0 FIELD FABRICATION OF
REBAR.~ 0.66 MHIKg. 0.33 MHIKg. 0.26 MH/Kg.

v. TRADE: EARTHWORKS:
1.0 MACHINE EXCAVATION I
l.OlSAND 1.20 MH/CM. 0.60 MH/CM, 0.48 MH/CM.
1.02 SAND and MARL 1.60 MH/CM. 0.80 MH/CM. 0,64 MflfCM.
1.03 MARL 2.20 MH/CM. 1.10 MHICM. 0.88 MH/CM.
2.0 GRANULAR BACFILL 2.40 MHICM. 1.20 MHICM. 0.96 .MH/CM,
3.0 GRANULAR SOIL BACKFILL a:oo MHICM. UiO MH/CM. 1.20 MH!CM.
4.0 MANUAL FOUNDATION
EXCAVATION and BACKFILL
4.01 SAND 8.00 MH/C.M, 4.00 MHICM. 3.20 MHICM.
4.02 EXCAVATION OF SAND
and MARL 13.00 MHICM. 6.50 MH/CM. 5.20 MHICM.
4.03 EXCAVATION OF MARL 21.00 MH/CM, 10.50 MHICM. 8.40 MH/CM.
4.04 BACKFILL OF SAND 11.00 MH/CM. 5.50 .MH/CM. 4.40 MlUCM,
4.05 BACKFILL SAND and
MARL 16.00 MH/CM. 8.00 MH/CM. 6.40 MH/CM.
4.06 BACKFILL MARL 24.00 MH/Ct.-1. 12.00 MH/CM. 9.60 MH/CM.
5.0 l"LOOR SLAB and MANUAL
l'i.Ol GRADING, MANUAL 2.60 MHIS.M. 1.30 MH/S.M. 1.04 MH/S.M.
5.02 EXCAVATION and
BACKFILl, 36.00 MH/CM. 18.00 MHICM. 14.40 MH/CM.
6.0 FINE GRADING and
FINISHING
6.01 GRADING 0.90 MillS .M. 0,45 bUIIS.M. 0.36 MH/S.M,
6.02 FINISIIING SOIL SURFACE 1.10 MHIS.M. 0.55 MHIS.M. 0.44 .MHIS.M.
6.03 DIKES 2.40 MH/CM. 1.20 MH/CM. 0.96 MH/CM.
6.04 ROAD WORKS
• BASE COURSE 0,24 MH/S.M. 0.12 MHIS.M. 0.10 MHIS.M.
• CURBES and GUTTERS 3.60 MH!CM. 1.80 MHICM. 1.44 MR/CM.
• 4" thk. ROAD 2.60 MHIS.M. 1.30 MH/S,M, 1.04 MIIJS.M.
• 6" thk. ROAD 2.80 MH/S.M, 1.40 MH/S.M. 1.12 MH/S.M.
• 8' thk. ROAD 3,00 MH/S.M. 1.50 MHIS.M. 1.20 MHIS.M.
• TROWEL FINISH 0.64 MHIS.M. 0.32 MH/S.M. 0.26 MHIS.M.
• SPECIAL TOPPING 2.40 MHIS.M. 1.20 MHIS.M. 0.96 MHIS.M.
• 4" STONE OR
SHELL ROAD 0.64 MH/S.M, 0.32 MH/S.M. 0.26 MHIS.M.
• 6" STONE OR
SHELL ROAD 0.84 MH/S.M, 0.42 MHIS.M. 0,34 Mfl!S.M.
• 8" sTONE OR
SHELL ROAD 1.04 MJIIS.M. 0.52 MH/S.M,
.
0.42 MH/S.M.
.

• ACID PROOFING 1.20 MHJCM. 0.60 MH/CM. 0.48 MHICM.


7.0 ASPHALT PAVING
7.01 FINE GRADING 0,84 MH/S.M. 0.42 MHIS.M. 0.34 MH!S.M.
7.02 PLACE BASE COURSE 0,40 MHIS.M. 0.20 MHIS.M. 0.16 MHIS.M.
7.03 ASPHALT OAO MHIS.M. 0.20 MH/S.M. 0.16 MH!S.M.
LABOR PRODUCTION TABLE

MANUOUUS PElt QUANTITY


WORK DESCRIPTION
LOW AVEH.AGE HIGH

8.0 ACID BLOCK OR PAVING BLOCK I


8.01 FINE GRADING 0.84 MH/S.M. 0.42 MHIS.M. 0.34 MHIS.M.
8.021NSTALL BRICK 8.40 MHIS.M. 4.20 MHIS.M. 3,36 MJI!S.M.
9.0 CRUSHSTONEORSiiELL
SURFACING
9,01 FINE GRADING 0.64 MH/S.M. 0.32 MHIS.M. 0.26 MllfS.M.
9.02 PLACE, SPREAD and
COMPACT STONE
TO 4" thk. 0.84 MHIS.M. 0.42 MH/S.M. 0.34 MHIS.M.
9.03 OVER 8" thk. 1.04 MH!S.M. 0.62 MIIIS.M. 0.42 MHIS.M.
10.0 TANK CUSHIONS
10.01 SAND CUSHIONS 1.40 MHICM. 0.70 MH/CM. 0.56 MH/CM.
10.02ASPHALT RETAINER
RING 0.40 MHIS.M. 0.20 MHIS.M. 0.16 MHIS.M.
U.O NON-GRANULAR BACKFILL 4.00 MHICM. 2.00 MH/CM. 1.60 MH/CM.
12.0 EXCAVATION· MANUAL
12.01 COMMON EARTH 16.00 MH/CM. 8.00 MHICM. 6.40 MHICM.
12.02 LOAN OF SAND 2.62 MHICM. 1.31 MHICM. 1.05 MHICM.
12.03 CLAY OR HEAVY SOIL 3.28 MHtcM. l.G4 MHICM. 1.31 MHtcM •.
12.04 ROCK 6.26 MII/CM. 2.63 MIIICM. 2.10 .MJI/CM.
13.0 MECHANICAL EXCAVATION
13,01 COMMON EARTH 13.34 MH/CM, G.6'fMHICM. 6.34 MHICM.
13.02 ROCK W/ JACKHAMMER 33.34 MH!CM. 16.67 MH/CM. 13.34 MHICM.
14.0 BACKFILLING
14.01 COMMON MANUAL 1.64 MHICM. 0.82 MHfCM. 0.66 MHICM.
14.02 GRAVEL FILL MANUAL 10.00 MHICM. 6.00 MHICM. 4.00 MHICM.
16.0 TRENCHING and BACKFILLING
OF UNDERGROUND PIPING I
USING EXCAVATION
MATERIAl8 MANUAL FROM
I
0 TO 2 MTS. DEPTH 2.50 MHIL.M. 1.26 MHIL.M. 1.00 MHIL.M.
2 TO 3 MTS. DEPTH 3.34 MHf.... M. 1.67 MIIIL.M. 1.34 MUJL.M.
3 TO 4 MTS. DEPTH 6.00 MH!L.M. 2.60 MHIL.M. 2.00 MHIJ,.M.
4 TO 6 MTS. DEPTH 6.66 MHIL.M. 3.33 MHJL.M. 2.66 MHIL.M.
16.0 PLACING BINDER-GRAVEL 0.21 MUICM. 0.11 MH/CM, 0.08 MH/CM.
1'1.0 ESCOMBRO BACKFILLING 0.42 MHICM. 0.21 Mli!CM. 0.17 MH/CM.
18.0 SPREADING, TAMPING and
GRADING 0.96 MHIS.M. 0.48 MHrS.M. 0,38 MHIS.M.
19.0 MECHANICAL COMPACTION,
PLATE COMPACTION 0.11 MHICM. 0.06 MHICM. 0.04 MH/CM.
20.0 MANUAL CLEARING and
GRUBBING
CLEARING UNDERGROWTH
and TREES. 12" 0.10 MHIS.M. O.OG MHIS.M. 0.04 MII/S.M.
CLEARING UNDERGROWTH end
SHRUBS 0.06 MH/S.M. 0.03 MHIS.M. 0.02 MII/S.M.
21.0 DISPOSAL OF SOIL 3.38 MHJC.M. 1.69 MH/CM. 1.33 MHICM.
22.0 HAULING OF SOIL 2.00 MII/CM. 1.00 MHICM. 0.80 MH/OM.
23.0 GRAVEL FILL 4.14 MHICM. 2.07 MH!CM. 1.66 MHICM.
24.0 EXCAVATION. CRANE and I
CLAMPSHELL WITH 8·MEN
and 2 CARPENTERS 2.14 MH/CM. 1.07 MHICM. 0.86 MHICM.

VI. TRADE: UNDERGROUND PIPING and


PLUMBING WORKS
1.0 LAYING ASBESTOS PIPES
U2•dia. 1.32 MHILM. 0.£6 MHILM. 0.63 MH!LM.
3/4" dia. 1.32 .Mil!LM. 0.66 MHILM. 0.63 MH!LM.
LABOR PRODUCTION TABLE

MANHOURS PEU QUANTITY


WORK DESCitlPTION
LOW AVERAGE HIGH

1"-114" dia. 1.48 MHILM. 0.14 MHJLM. 0.69 MHILM.


11112"·2" dla 1.64 MHILM. 0.82 MHILM. 0,66 MH/LM,
Vl/2" di11. 1.97 MHILM. 0.98 MHILM. 0.79 MHILM.
a• dla 2.16 MHJLM. 1.08 MHILM. 0,86 MHJLM.
3/112' dia. 2.ao MHILM. 1.16 MHILM. 0.92 MHJLM.
4" dia. 2.1J:4 MHILM. 1.32 MHILM. 1.06 MHILM.
2.0 CAST FROM PIPE
2" dia. 4.38 MHILM. 2.19 MHILM. 1.76 MHILM.
4" dia. 6.68 MH/LM. 3.29 MHILM. 2.63 MHJLM.
o· dia. 9.84 MHILM. 4.92 MHILM. 3.94 MH/LM.
a· dia. 13.14 MHILM. 6.67 MHILM. 6,26 MHILM.
10" dia. 19.70 MHILM, 9,85 MHILM. 7,88 MHJLM.
12' dia. 20.62 MHILM. 10.31 MHILM. 8,25 MHILM.
14" dla. 24.10 MHJLM. 12.05 MHILM. 9.64 1o1HILM.
16" dia. 27.38 MHILM. 13.69. MHILM. 10,95 MHILM.
18' dia, 30.68 MJIILM. 16,34 MHILM. 12.27 MIIILM.
20" dia. 32.86 MHILM. 16.43 MHILM. 13.14 MHILM.
24" dia, 36.14 MHJLM. 18.07 MIIILM. 14.46 MHJLM.
30" dia. 41.08 MHILM. 20.64 MHILM. 16.43 MHJLM.
3.0. LAYING PVC PIPE
U2' -3Wdia, 0.38 MHILM. 0.19 MHILM. 0,15 MHILM.
1"·11114" dia. 1.48 MHILM. 0.74 MHJLM. 0.69 MHILM.
11112"·2" dla. 1,64 MHILM. 0.82_MJIILM. 0.66 MHJLM.
21112" dia. 1.96 MKILM. 0.98 MHILM. 0.78 MHILM.
3' dia. 2.16 MHILM. 1.08 MHILM. 0.86 MHILM.
4" dia. 2.62 MHILM. 1.31 MHILM. 1.05 MHILM.
6" dla. 3.28 MHILM. 1.64 MHILM. 1.31 MIIILM.
6' dla. 4.92 MH/LM. 2.4G MJIILM. 1.97 MHILM.
4.0 LAYING RCP 8-MEN (1 TEAl.fl
24" dia. 8.00 MHILM. 4.00 MIIILM. 3,20 KHILM,
36" dia. 12.80 MHILM. 6.40 MIIILM. 5,12 MHILM.
48" dia, 21.34 MHJLM. 10.67 MHILM. 8.64 MHILM.
6"-18" dia. 2.66 MHILM. 1.33 NHILM. I.06 MHILM.
5.0 LAVATORY 16.00 MHIEACU 8.00 MHIEACH 6.40 MHIEACH
6.0 WATER CLOSET 24.00 MHIEACH 12.00 MHIEACH 9,60 MHIEACII
7.0 URINAL UTILITY STALL 48,00 MH/EACH 24.00 MHIEACH 19.20 MHIEACH
8.0 URINAL, PEDESTAL TYPE 32.00 MHIEACH 16.00 MHIEACH 12.80 MHIEACH
9.0 SHOWER and STALL 20.00 MHIEACJI 10.00 MHIEACH 8.00 MHIEACH
10,0 5-MAN GROUP SHOWER 72,00 MHIEACH • 36.00 MHIEACH 28.80 MHJEACH
11.0 BATH TUBS 48.00 MHIEACH 24.00 MHIEACH 19,20 MHIEACH
12.0 SLOPE SINK 28.00 MHIEACH 14.00 MHIEACH 11,20 MHIEACH
13.0 HOT WATER HEATER 28.00 Mil/EACH 14.00 Mil/EACH 11,20 MHIEACH
14.0 6-PERSONWASH SINK 52.00 MHIEACH 26.00 MJIIEA.CH 20.80 MHIEACH
16.0 DRI~KING 1-'0UNTAIN 26.00 MHHIEAC 13.00 MHIEACH 10.40 MHIEACH
16.0 EYE WASH 1~.00 MHIEACH 8.00 MHIEACH 6.40 MHIEACH
17.0 MISCELLANEOUS FIXTURES 4,00 MHJEACH 2.00 MHIEACH 1.60 Mil/EACH
18.0 PARTITIONS 16.00 MHJEACH 8.00 MHIEACH 6.40 MHIEACH
19.0 LAYING OF 24" dia. RCP 8.00 MHIPIPE 4.00 MH/PIPE 3.20 MHIPIPE
20.0 LAYING OF 36" dia. RCP 12.80 MHIPIPE 6.40 MHIPIPE 5.12 MHIPIPE
21.0 LAYING OF 48" dia. RCP 21.32 MJ:IIPIPE 10.66 MHIPIPE 8.63 MHIPIPE
LABOR PRODUCTION 1'ABLE

.MANHOURS PEU QUANTITY


WORK DESCRIPTION
LOW AVERAGE I HIGH

VII. TRADE: INSULATION:


A. EQUIPMENT INSTALLATION
1.0 VESSELS, EXCHANGERS and
TANKS
1.01 FIELD FABRICATION
INSULATION 5.00 MH!S.M. 2.60 MH/S.M. 2.00 MH/S.M.
1.02 FIELD FABRICATION
SHEET METAL COVER 24.00 MHIS.M. 12.00 MH/S.M. 9.60 MH/S.M.
1.03 APPLY INSULATION 10.00 MH/S.M. - 6.00 MH/S.M. 4..00 MH/S.M.
1.01 APPLY SHEET METAL
COVER 10.00 MHIS.M. 6.00 MII/S.M. 4.00 MH/S.M.
2.0 PUMPS, COMPRESSORS and
TURBINES
2.01 FABRICATE 34,00 MII/S.M. 17.00 MH/S.M. 13.60 MH/S.M.
2.02 APPLY 60,00 MH/S.M. 30.00 MlliS.M. 24.00 MHIS.M.
3.0 PI PINOS and COMPONENT
INSULATION
3.01 FIELD FABRICATE 8.00 MHIFLO. 4.00 MHJFLG. 3.20 MHIFLG.
3.02 FIELD FABRICATE SHT.
METAL COVER 1.60 MHIS.M. 0.80 MH/S.M. 0.64 MH/S.M.
3.03 APPLY INSULATION 5.40 MHIL.M. 2. 70 MIIIL.M. 2.16 MHIL.M.
3,04 APPLY SHEET METAL OR
PAPER COVER 3.00 MHIEACH 1.50 MHIEACH 1.20 Mil/EACH
3.05 l-'ABRICATE INSTRUMENT
COVER 16.00 MHIEACH 8.00 MHIEACH 6,40 MHIEACH
3.06 INSTALL INSTRUMENT
COVER 12.00 MHJEACH 6.00 MHJEACH 4.80 MHIEACH
3,07 INSULATE PIPE HANGERS 8,00 MHiEACH 4.-00 MHIEACH 3.20 MHJEACH
3.08 FOR STEAM TRACED
LINES 7.40 MH/L.M. 3. 70 MHIL.M. 2.96 MHn •. M.
3.09 REMOVAL OF OLD OR
EXISTING INSULATION 3.00 MHIL.M. 1.50 MHIL.M. 1.20 MH/L.M.

VIII. TRADE: FIR& PROOFING


1.0 INSTALL STUDS 1.00 MHiEACH 0.50 MHIEACH 0.40 MHJEACH
2.0 INSTALL MESH 2.40 MII/S.M. 1.20 MHIS.M, 0.96 MH/S.M,
3.0 POURED:
3.01 FORMING 28.00 MHJS.M. 14.00 MHJS.M. 11.20 MHIS.M.
3.02 STRIP FORMS 12.00 MHI'S.M. 6.00 MHI'S.M. 4.80 MH/S.M.
3,03 POUR CONCRETE 140.00 MHIL.M. 10.00 MHJL.M. 56.00 MHfl..M.
3.04 CURING/PATCHING 1.20 MI-LS.M. 0.60 MH/S.M. 0.48 MHIS.M.
3.05 FINISHING 1.40 MHIS.M. 0.70 MHIS.M. 0.66 MHIS.M.
4.0 TROWEL, PLASTERED 6.40 MHIS.M. 2.70 MHIS.M. 2.16 MJ-1/S.M.
6.0 PNEU.MATIC APPI,ICATION
O.Ql OUNITE 2.40 MHIS.M. 1.20 MHIS.M. 0.96 MII/S.M.
6.0 APPLY FINEDRICKORBLOCK 1.60 MHIPC. 0.80 MH/PC. 0.64 MII/PC.
7.0 REMOVAL OF EXISTING
OR OLD FIREPROOFING 5.00 MH/S.M. 2.50 MHIS.M. 2.00 MH/S.M.
8.0 APPLY FIREPROOFING PAINT 6.00 MHIS.M. 3.00 ~HI/S.M. 2.40 MHIS.M.

FIRE PROTECTION:

1.0 FIRE PROTECTION


EQUIPMENT INSTALLATION
1.01 MONITOR 10.00 MHIEACH 5.00 MHJEACH 4.00 MHJEACH
LABOR PRODUCTION TABLE

MANH OURS PER QUANTITY


WORK DESCRIPTION
LOW AVERAGE liiGH

1.02 HOSE REELS and CARTS 30.00 MHIEACH 15.00 MHIEACH 12.00 MHIEACH
1.03 FIRE EXTINOIDSHERS 10.00 MHIEACII 5.00 MHIEACII 4.00 MHIEACH
2.0 PERBbNAL EQUIPMENT
2.01 EYE .MASH 20.00 MHIEACH 10.00 MH/EACH 8.00 MHIEACH
2.02 SAFETY SHOWERS 20.00 MHIEACH 10.00 MH!EACH a:oo MHIEACH
2.03 BREATHING APPARATUS 10.00 MHIEACH 5.00 MHIEACH 4.00 Mil/EACH
3.0 SPRINKLER SYSTEM
3.01 SPRAY NOZZLES 2.00 MHIEACJI 1.00 Mil/EACH 0.80 MHIEACH
3.02 WATER CANNONS 10,00 MHIEACH 5.00 MHIEACH 4.00 MHIEACII

IX. TRADE: PERMANENT FENCING


1.0 INSTALL FENCE 2.40 MHIL.M. 1.20 MHIL.M. 0,86 MIIIL.M.
2.0 INSTALL OATES 6,00 MHIL.M. 3.00 MHIL.M. 2.40 MHJL.M.
3,0 TO RAIL 0.60 MHIL.M. 0.30 MHIL.M. 0.24 MHIL.M.
4.0 DARllWtRE, 3·STRANDS 0.60 MHIL.M. 0.30 MHIL.M. 0.24 MHIL.M.

X. TRADE: PAINTING WORKS


1.0 NEW STRUCTURAL STEEL 20.00 MHtrON 10.00 MHtrON 8.00 MH/I'ON
2.0 OLD STRUCTURAL STEEL 1.10 MHIS.M. 0.55 MHlS.M. OA4 MHJS.M.
3,0 NEW FLAT PLATES 0.64 MII/S.M. 0.32 MHIS.M. 0.26 MHIS.M.
4.0 SURFACE PREPARATION
4.01 IN TERMS OF WEIGTH 16.00 MHtrON 8.00 MHtrON 6.40 MHtrON
4.02 IN TERMS OF AREA 0.86 MHIS.M. 0.43 MHIS.M. 0.34 1-HI/S.M.
5.0 SAND PREPARATION 60.00 MHtrON 30.00 MHtrON 24.00 MHtrON

XI. TRADE: HEATING VENTILATING and


AIR CONDITIONING
1.0 HACV PIPING 7.00 MH!L.M. 3.50 MHIL.M. 2.80 MHIL.M.
2.0 DUCK WORK INSTALL 12.00 MH!S.M. G.OO MHIS.M. 4.80 MH/S.M,
3.0 DUCK WORK FAB. 36.00 MHJS.M. 18.00 MHIS.M. 14.40 MHJS.M.
4.0 PACKAGE UNIT AIR
CONDITIONER 48.00 MHIEACH 24.00 MHIEACH 19.20 MHIEACJI
5.0 UNIT HEATER 24.00 MHIEACII 12.00 MHIEACH 9.60 Mil/EACH
6.0 FINNED CONVERTER 10.00 MH!EACH 5.00 MHIEACH 4.00 MHIEACH
7.0 EXHAUST I<"A.N, PROPELLER 16.00 MHIEACH 8.00 MHIEACH 6.40 MHIEACH
8.0 GRAVITY ROOF VENT 14.60 MH!L.M. 7.30 MHIL.M. 6.84 MHIL.M.
9.0 POWER ROOF VENT 48.00 MHIEACH 24.00 MHIEACH 19.20 MHIF..ACH
10.0 ROUND ROOF VENT 16.00 MHIEACH 8.00 MHIEACH 6.40 MH!EACH
11.0 PLUMBING PIPING 7.00 MHIL.M. 3.50 MHIL.M. 2.80 MH!L.M.

XII. MISCELLANEOUS:
1.0 WATER STOP INSTALLATION 1.34 MHIL.M. 0.67 MHIL.M. 0,54 MH/L.M.
2.0 CAULINS-SLAB JOINT 0.40 MHIL.M. 0.20 MHIL.M. 0,16 MHIL.M.
3.0 ASPHALTING l.60 MH!S.M. 0.80 MUIS.M. 0.64 MII/S.M.
4.0 GROirriNG and TOOL
PLASTERING 3.34 M~IIS.M. 1.67 MH!S.M. 0.84 MHIS.M.
5.0 WATER PROOFING RUBBERIZE I.lO MHts.M. 0.55 MHIS.M. 0.28 MH/S.M.
6.0 COPPER CLADDING ROOF DEC 1.00 MHIL.M. 0.50·MHIL.M. 0.25 MIUL.M.
7.0 WATER PROOFING FLINKOTE 0.54 MHts.M. 0.27 MHIS.M. 0,14 MH/S.M,
8.0 DEMOLITION OF ADOBE WALL 3.20 MH/CM. 1.60 MHICM. 0.80 MIL'CM.
9.0 PAINTING 0.68 MH/S.M. 0.34 MH/S.M. 0.17 MH/S.M.
10.0 COPPERWATERSTOP-CUT
and SHAPE 0,11 MHIL.M. 0.06-MHIL.M. 0.03 MHIL.M.
11.0 COPPER WATER STOP-CUT
INSTALLATION 0.22 MHIL.M. 0.11 MUIL.M. 0,06 MHIL.M.
12.0 SETTING ANCHOR BOLTS 0.97 MH/Kg. 0.49 MH/Kg, 0,24 MH/Kg.
13.0 SETTING ANCHOR BOXES 3.64 MH/CM. 1.82 MH/CM. 0.91 MH/CM.