Sie sind auf Seite 1von 2

FONTUS WATER PVT. LTD.

Electrical Control Panel Testing and Inspection Checklist


Client Name: Date:
Project Name: Vendor Name:
OA NO Location:
Logic NO Rev:
Sr. No. Check Points Detail Description Remarks Status
1 Panel Appearance
a) Dimension Check Panel Width, Height and Depth is as per GA drawing
b) Paint/Color Check Paint as mentioned in Specification
c) Sheet Thickness Check Sheet Thickness as mentioned in Specification
d) Panel Mounting/Fixing Check proper angle (1.5 to 2 ft height) is provided for panel
arrangement mounting
e) Fontus Nameplate Check Fontus Nameplate is provided on panel
Check Tag plates are provided and installed properly for all Pumps
f) Pump & Instrument Tag plates and Instruments.
2 Electrical Component
Check all the Switchgear used is as per BOM. For eg if L&T make
a) Switchgear Make
is mentioned check all component should be L&T make.
Check All the Contactors, Overload Relays, MCB/MCCB's, SPP,
b) Switchgear Ratings
CT's, BusBar, Ammeter, Voltmeter ratings are as per drawings.
c) Internal Arrangement Check internal arrangement of components is as per drawing.
d) Check these Incomer MCB/MCCB, Ammeter/Voltmeter with selector switches,
Instruments/components are Single phase Preventer, Phase Indicator, Fan/Filter, selector
provided in panel switches, Pump Indications etc.
3 Electrical Wiring
a) Internal Wiring Check all Power and Control wiring is as per drawing

b) WLC & Timer wiring Check Water Level Controller and Timer for Blower Logic wiring
and their interlocks with pumps are provided as per drawing
Check Power and Control Terminal strips are provided and wiring
c) Power & Control Terminal
termination is done properly with ferruling.
Check VFD rating and wiring as per drawing. VFD drive testing
d) For VFD Panel
should be checked.
For PLC Panel check Soft PLC logic with supplier as per our Logic
e) For PLC Panel requirement. All the programming should be checked whether it run
or not.
Check single phase power supply provision is made for Level
Power Supplies
4 Controller, Local Indicators, Switches etc in panel
Check spare Terminals are provided for future use in panel
For Motors, VFD and Electrical Switchgear receive the Test
Test Certificates
5 Certificates from supplier

Inspected by : Date: Sign:


Notes:- Each Panel must be Inspected as per above checklist. Incase Vendor inspects on his own, he will fillup above checklist and submit self certification report.

Das könnte Ihnen auch gefallen